Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹28.8 LAccepted-AOC | ₹28.8 L | 1 | Accepted-AOC Work Awantan |
| 2 | 2₹28.9 LRejected-Finance DUMKA | JHARKHAND | 814101 | ₹28.9 L | 2 | Rejected-Finance L2 |
| 3 | 3₹29.6 LRejected-Finance GRAM NURPADA GHATARSIKPUR PO DUMKA DIST DUMKA JHARKHAND | DUMKA | JHARKHAND | 814101 | ₹29.6 L | 3 | Rejected-Finance L3 |
| 4 | 4₹33.9 LRejected-Finance | ₹33.9 L | 4 | Rejected-Finance L4 |
Tender Value
₹44.5 L
EMD Value
₹89,000
Closing Date
16 Apr 2026, 5:00 pmClosed
EXECUTIVE ENGINEER
RURAL DEVELOPMENT SPECIAL DIVISION DUMKA
Construction of PCC road at Village Baddabdal Tola (Land of Budhnath Marandi to REO Road) Panchayat-Baskidih, Block- Masaliya Distt-Dumka.
2026_RDSPL_112252_1
RDSD/DMK/UNTIED/33/25-26_Gr.01
Open Tender
Civil Works
60 days
Dumka
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹89,000
4 Jun 2026
2 Apr 2026
18 Apr 2026
2 Apr 2026
16 Apr 2026
2 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I. | - | cu.m | - | - | - |
| 2 | Providing coarse clean sand in filling in in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials labour, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume) | - | cu.m | - | - | - |
| 3 | Providing designation 75B one brick on edge soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. | - | sq.m | - | - | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) | - | cu.m | - | - | - |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for
Foundations, footings, bases of columns, etc. for mass concrete | - | sq.m | - | - | - |
| 6 | Earth filling in foundaion trenches and plinth in layers not exceding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I. (mode of measurement compacted volume) | - | cu.m | - | - | - |
| 7 | Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I.
Ordinary soil (UP TO 3 M DEPTH ) | - | cu.m | - | - | - |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) | - | cu.m | - | - | - |
| 9 | Providing randam rubble stone masonry in CM (1:4) in superstructureincluding cost of screening of materials scaffolding raking out joints to 20 mm depth, curing taxes and royalty all complete as per building specification and direction of E/I. | - | cu.m | - | - | - |
| 10 | Providing randam rubble stone masonry in CM (1:4) in superstructureincluding cost of screening of materials scaffolding raking out joints to 20 mm depth, curing taxes and royalty all complete as per building specification and direction of E/I. | - | cu.m | - | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_151530.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
BOQ_151530.xls
BOQ • 0.29 MB
one.pdf
Tender Documents • 0.68 MB
Download all tender documents and submit your bid