SE OMC-II 3X200MW BTPS OBRA
SUPERINTENDING ENGINEER OMC II 3X200MW BTPS Obra Sonebhadra , UP 231219 E-mail Address [email protected]
WORK OF BREAKDOWN MAINTENANCE OF MAIN BOILER ROUND THE CLOCK BOILER CHECKING AND GUN CLEANING IN Units-9 10 11 12 and 13 of 5X200MW UNITS FOR TWO YEARS
2023_RVUNL_858276_2
OBR////6000003809/BMD1/3X200MW
Open Tender
Miscellaneous Works
Fixed-rate
730 days
Obra Thermal Power Plant Obra
AS PER PQC
3 documents required · 3 mandatory
₹1,180
Dy CAO CFA and BO BTPS Obra
₹49,900
21 Feb 2024
5 Jan 2024
10 Feb 2024
5 Jan 2024
7 Feb 2024
5 Jan 2024
Amount
Servicing of oil gun guide assy at AB, CD & EF elevation by replacement of damaged parts by new one.
Repairing of eroded adjustable coal nozzle tip when the same is lying outside
Repairing of eroded coal nozzle when the same is lying outside
Replacement of coal burner assy. by new/repaired one.
Replacement of oil gun assy at AB, CD & EF elevation by new/ repaired one.
Repairing of guide assembly at elevation AB, CD & EF.
Repairing/replacement of scanner guide assly.
Repair/replacement of scanner and opening the bolts of flange & taking it out.
Repair/Refitting of scanner guide assembly.
Replacement of air nozzle by new/repaired one.
Repairing of buldge/burnt air nozzles.
Repairing & replacement of defective/burnt air nozzle.
Servicing of secondary air damper in wind box.
Repairing of secondary air damper in wind box.
Repairing of Manhole of boiler.
Replacement of packing of manholes.
Repairing of Boiler Peep Holes.
Replacement of packing of Boiler peep holes.
Providing pin of spring/hanger supports of feed line,steam lines.
Furnace Ceiling repairing by cutting & welding in Pent House.
Welding of Hot & cold primary & secondary air ducts.
Alignment and fixing of supports of hot air ducts.
Laying of HP steam/water pipelines of dia 15 mm to 100 mm.
Two coat hard facing (One horizontal & one vertical at the distance of ½” on any equipment).
Cleaning & disposal of fly ash and foreign material Wind box (Right)
Cleaning & disposal of fly ash and foreign material Wind box (Left)
Cleaning & disposal of fly ash and foreign material Cat house (Front & rear)
Removal fly ash from economizer chamber at 35 M/L.
Removing fly ash from the gallery between Re-heater & arch tubes.
Removing fly ash form the gallery between exit super heater & hanger tubes of convective super heater.
Removing fly ash from second pass.
Removing fly ash from the gallery between platen super heater and cold reheat headers in pent house
Removing fly ash from the galleries in left & right of the pent house, between water tubes & skin cashing.
Removing fly ash from the gallery between cold reheat and hot reheat header in pent house.
Cleaning of riser tube economizer water wall & connecting tubes of super heaters by means of wire brush and old clothes.
Alignment and providing proper supports to rods of buck stay furnace economizer & super heater zone from 16 M/L to 48 M/L in boiler.
Rectification of guide pipe & plates of hydraulic seals at all the four sides above bottom ash hopper.
Rectification of hinge supports of wind box of boiler at 19 M/L (L&R).
Rectification of Tie Rods in Pent House of 48 M/L side at boiler.
Servicing & repairing of hanger supports of Main steam, cold reheat,hot reheat, feed line and down corners of boiler form 13 M/L to 54 M/L.
Making coal compartment assly by making coal nozzles with seal plate & adjustable seal nozzle SS tips.
Replacement of worn out and damaged railing of boiler from zero meter to 54 M/L by old & used economizer tubes.
Repairing/replacement of corner attachment of water wall and super heater.
Alignment of buck stay beam (Horizontal & Vertical) from 8 M/L to 48 M/L.
Strengthening & alignment of scanner angles of furnace.
Cleaning & disposal of fly ash and foreign material From Dog House
Cleaning & disposal of fly ash and foreign material Above furnace top and inside Pent House.
Cleaning & disposal of fly ash and foreign material Below drum inside the Pent House.
Servicing/Overhauling of fill pump.
Servicing/Overhauling of Washing Pump
Shifting washing pump from 10th Unit Boiler 16 mtr, corner no.1 to 12th Unit Boiler 16 mtr, corner no.1 & then after completion of work again shifting to 10th Unit.
Fitting of chucker plates/plates/new/old grills with supporting ‘I’ beams/Channels /angles up to 150 mm by replacements.
Replacements of ‘I’ beams/Channels 200/250 mm size of the required length up to 5m long of platform by cutting and welding.
Replacements of ‘I’ Beams of size 300 mm and above of required length up to 5m long of platform by cutting and welding.
Fabrication and Repairing of ladders.
Cleaning of Filter of Scanner Fan
Replacement of scanner Fan Impeller
Round the clock Checking of Boiler, Oil Gun Cleaning/ replacement, Cleaning of coal dust from furnace zone for Unit 9, 10 &11.
Round the clock Checking of Boiler, Oil Gun Cleaning/ replacement, Cleaning of coal dust from furnace zone for Unit 12&13
KIRAN CONSTRUCTION COMPANY
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .