Loading…
Loading…
Tender Value
₹5.0 L
EMD Value
₹15,000
Closing Date
5 Oct 2026, 2:30 pm
Karnataka Forest Department
Hariprasad
Formation of Culvert at Karkala Wildlife Range during 2026-27.
KFD/2026-27/OW/WORK_INDENT42171
KFD/2026-27/OW/WORK_INDENT42171
Open
Other Works
Two Tender Document System(Two Cover)
KFD ACF Kudremukha Wildlife Sub Division Karkala
6 documents required · 6 mandatory
Department Registration Details
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing work
List of works for which tenders already submitted
Banker Details
₹500
₹15,000
8 Sept 2026
8 Sept 2026
7 Oct 2026
3 Oct 2026
Formation of Culvert at Kelaginamane Kanyal Naravi RF
Earth work excavatin for foundation by mechanical means for all works & depth upto 3m. as per drawing and technical specifications, including setting out, shoring, strutting, barricading caution light...
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up...
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation,...
Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment,scarified to a depth of 150 mm, mixed with water at OMC and thencompacted ...
Formation of Culvert at Mattau Andar RF
Earth work excavatin for foundation by mechanical means for all works & depth upto 3m. as per drawing and technical specifications, including setting out, shoring, strutting, barricading caution light...
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up...
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation,...
Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment,scarified to a depth of 150 mm, mixed with water at OMC and thencompacted ...
Formation of Culvert at Berkala Andar RF.
Earth work excavatin for foundation by mechanical means for all works & depth upto 3m. as per drawing and technical specifications, including setting out, shoring, strutting, barricading caution light...
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up...
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation,...
Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment,scarified to a depth of 150 mm, mixed with water at OMC and thencompacted ...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Culvert Karkala.pdf
Tender Document • 2.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .