Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹39.9 L+₹5.6 L (16.2%)Rejected-AOC | L2 | Rejected-AOC Rejected for L2 | |
| 3 | L3₹41.2 L+₹6.8 L (19.9%)Rejected-Finance | L3 | Rejected-Finance Lowest 3 | |
| 4 | L4₹42.7 L+₹8.3 L (24.3%)Rejected-Finance | L4 | Rejected-Finance Lowest 4 | |
| 5 | L5₹42.7 L+₹8.4 L (24.3%)Rejected-Finance | L5 | Rejected-Finance Lowest 5 |
Tender Value
₹43.0 L
EMD Value
₹85,918
Closing Date
8 Nov 2019, 11:00 amClosed
The Executive Engineer, Malda Highway Division
The Executive Engineer, Malda Highway Division, P.W. (Roads) Directorate, Singatala, Malda.
Madhabpurghat bridge at 12.015 km and bridge approach Uttar Dinajpur side at 12.015 km of Chanchal Kharba Churamanghat Road, Construction of toe wall and allied works under Malda Highway Division in the district of Malda.
2019_SH_249351_1
02e/2019-20/EE/MHD/PW(R)D
Open Tender
CIVIL WORKS
Percentage
120 days
Malda
.
3 documents required · 3 mandatory
₹85,918
21 Jan 2020
22 Oct 2019
11 Nov 2019
22 Oct 2019
8 Nov 2019
22 Oct 2019
eProcurement System of Government of West Bengal Created By: JAGANNATH SAMANTA Created Date/Time: 28-Nov-2019 04:21 PM Tender Title: Madhabpurghat bridge at 12.015 km and bridge approach Uttar Dinajpur side at 12.015 km of Chanchal Kharba Churamanghat Road, Construction of toe wall and allied works under Malda Highway Division in the district of Malda. Tender ID: 2019_SH_249351_1
Tender Inviting Authority: EXECUTIVE ENGINEER, MALDA HIGHWAY DIVISION, P.W. (ROADS) DIRECTORATE, MALDA, GOVERNMENT OF WEST BENGAL.
Name of Work: Madhabpurghat bridge at 12.015 km and bridge approach (Uttar Dinajpur side) at 12.015 km of Chanchal-Kharba-Churamanghat Road, construction of toe wall and allied works, under Malda Highway Division, in the district of Malda.
NIT No. 02 of 2019 - 20 of Executive Engineer, Malda Highway Division
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 UNITECH INSULATION 4295881.32 2.35 4396834.53 Fourty Three Lakh Ninty Six Thousand Eight Hundred and Thirty Four
2.00 Mordern Construction 4295881.32 -.57 4271394.80 Fourty Two Lakh Seventy One Thousand Three Hundred and Ninty Four
3.00 Dipankar Das 4295881.32 -19.99 3437134.65 Thirty Four Lakh Thirty Seven Thousand One Hundred and Thirty Four
4.00 Hind Co-op Labour Contract and Constraction Society Ltd. 4295881.32 -.51 4273972.33 Fourty Two Lakh Seventy Three Thousand Nine Hundred and Seventy Two
5.00 SARAOGI CONSTRUCTION 4295881.32 -7.01 3994740.04 Thirty Nine Lakh Ninty Four Thousand Seven Hundred and Fourty
6.00 M/S NABAB CONSTRUCTION 4295881.32 .57 4320367.85 Fourty Three Lakh Twenty Thousand Three Hundred and Sixty Seven
7.00 MILAN HOSSAIN 4295881.32 -4.10 4119750.19 Fourty One Lakh Ninteen Thousand Seven Hundred and Fifty
Lowest Amount Quoted BY: Dipankar Das(3437134.65)
BOQ Summary Details Tender Title: Madhabpurghat bridge at 12.015 km and bridge approach Uttar Dinajpur side at 12.015 km of Chanchal Kharba Churamanghat Road, Construction of toe wall and allied works under Malda Highway Division in the district of Malda. Tender ID: 2019_SH_249351_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 Dipankar Das 3437134.65 L1
2 SARAOGI CONSTRUCTION 3994740.04 L2
3 MILAN HOSSAIN 4119750.19 L3
4 Mordern Construction 4271394.80 L4
5 Hind Co-op Labour Contract and Constraction Society Ltd. 4273972.33 L5
6 M/S NABAB CONSTRUCTION 4320367.85 L6
7 UNITECH INSULATION 4396834.53 L7
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .