Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6,141.48Admitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹6,331.42+₹189.94 (3.09%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹10.9 L
EMD Value
₹21,740
Closing Date
24 Aug 2026, 4:00 pmClosed
Er. Layaqit Ali (Executive Engineer)
OFFICE OF THE EXECUTIVE ENGINEER PWD DIV SURANKOTE
Please Refer to BOQ.
2026_PWDJK_321223_1
e-NIT No.81 of 2026-27 Dated 17-08-2026
Open Tender
Civil Works
Percentage
SKT
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
EXECUTIVE ENGINEER PWD DIVISION SURANKOTE
₹21,740
3 Sept 2026
17 Aug 2026
25 Aug 2026
17 Aug 2026
24 Aug 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Hand packed stone in wire crate including the cost of stone and wire crate complete job. | 1 | Cum | 2,400 | ₹2,400 |
| 2 | Slip Clearence In soils; mixed with moorum/ (Kankar/ shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m | 1 | Cum | 331.15 | ₹331.15 |
| 3 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well asl0 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil : | 1 | Cum | 91.75 | ₹91.75 |
| 4 | Restoration of rain cuts,damage road surface patches by way of supplying & filling RBM in layers not exceeding 20cm in depth rolling each layer with power load roller including carriage from source to site including unloading stacking, laying watering dressing etc complete job. | 1 | Cum | 500 | ₹500 |
| 5 | Providing and laying non-pressure of specified class R.C.C. pipes including collarsispigot jointed with stiff mixture of cement mortar in the proportion of 1 :2 (1 cement:2 fine sand) including testing ofjoints etc. complete. Non-pressure NP-3 class R.C.C. pipes 600 mm dia. R.C.C. pipe | 1 | Rmt | 2,415.8 | ₹2,415.8 |
| 6 | Shifting of Mulba /excessive earth within average lead 1 Km bY M.T. | 1 | Cum | 160.93 | ₹160.93 |
| 7Carriage of material by M.T including loading and unloading and stacking on site complete | |||||
| 7.01 | Carriage of Non-pressure NP-3 class R.C.C. pipes 600 mm dia. R.C.C. pipe by an average distance of 90 km by MT | 1 | Rmt | 431.79 | ₹431.79 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.54 MB
BOQ_1071926.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .