Tender Value
₹44,550
Closing Date
27 Aug 2026, 2:00 pmDue tomorrow
EE ETD-I Kanpur
EE ETD-I Kanpur
Work for Replacement of Damaged equipment 33 KV OEF Feeder and Main Bus Ist AND III Section Isolator at 220 KV Substation RPH under ETD 1 Kanpur
2026_UPTCL_1173512_1
ET-04/ETD-I (K)/2026-27
Open Tender
Electrical Works
Fixed-rate
90 days
EE ETD-I Kanpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
Yes
PNB A/C-0746002100006255
Yes
27 Aug 2026
30 Jul 2026
27 Aug 2026
30 Jul 2026
27 Aug 2026
30 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Details of work as per given below - | |||||
| 1.01 | DISMANTLING OF DAMAGED 36KV VCB AT 33 KV OEF FEEDER WITH THE HELP OF HYDRA / CRANE DURING THE COMPLETE S/D OF 33 KV BUS NO. 3 SAFELY AND CAREFULLY THE JOB ALSO INCLUDES SHIFTING OF DAMAGED VCB FROM SITE TO DESIGNATED PLACE OF RPH S/S KANPUR | 1 | Job | - | - |
| 1.02 | MODIFICATION OF FOUNDATION FOR 36 KV VCB WITH THE HELP OF ELECTRIC CUTTING / WELDING AND ALL OTHER ASSOCIATED WORK TO COMPLETE THE JOB SETISFACTORLY | 1 | Job | - | - |
| 1.03 | ERECTION OF NEW 36 KV VCB ON THE BAY OF 33 KV OEF FEEDER ON MODIFIED VCB FOUNDATION SAFELY AND CAREFULLY WITH THE HELP OF HYDRA/ CRANE AS PER THE PROPER ALIGNMENT, THE JOB ALSO INCLUDING CONNECTION PROPER CHECKING OF TRIPPING / CLOSING, AND PROTECTION TRIPPING, SHIFTING OF VCB FROM S/S STORE TO ERECTION SITE AT 220 KV RPH KANPUR AND ALL OTHER ASSOCIATED WORKS TO COMPLETE THE JOB SATISFACTORILY IN ALL RESPECTS. | 1 | No | - | - |
| 1.04 | DISMANTLING OF FULLY DAMAGED R,Y & B-PHASE 36 KV CT 33 KV OEF FEEDER AFTER OPENING OF ALL CABLE CONNECTIONS, BOTH SIDE JUMPERS AND CUTTING OF EARTHING STRIPS. | 3 | Job | - | - |
| 1.05 | ERECTION OF NEW 36 KV CT ON 33 KV OEF FEEDER SAFELY AND CAREFULLY . THE JOB ALSO INCLUDS SHIFTING OF CT FROM S/S STORE TO ERECTION SITE AT 220 KV RPH KANPUR AND ALL OTHER ASSOCIATED WORKS TO COMPLETE THE JOB SATISFACTORILY IN ALL RESPECTS. | 3 | No | - | - |
| 1.06 | SHIFTING, LOADING OF 36KV NEW CT (04 NOS.) AT CENTRAL STORE PANKI ON SUITABLE PRIVATE CARRIER SAFELY AND CAREFULLY DISTANCE APPROX. 25KMS AND CARRIAGE UPTO 220 S/S RPH AND UNLOADING THE SAME AT ERRECTION SITE OF 33KV OEF FEEDER | 1 | AU | - | - |
| 1.07 | REPLACEMENT OF 33 KV MAIN BUS I & III SECTION ISOLATOR 2000 Amp. & 36 KV LINE SIDE ISOLATOR OF 33 KV OEF FEEDER AT 220 KV S/S RPH KANPUR THE JOB INCLUDES REPLACEMENT OF DAMAGED ISOLATOR BY NEW, AND PROPER ADJUSTING AND ALINGMENT FOR SMOOTH OPERATION PROPERLY AND ALL OTHER ASSOCIATED WORK TO COMPLETE THE JOB SATISFACTORLY | 2 | Job | - | - |
| 1.08 | JUMPERING WORK OF 33 KV MAIN BUS I & III SECTION ISOLATOR 2000 Amp. AND 33 KV OEF FEEDER BUS SIDE & LINE SIDE ISOLATOR AT 220 KV S/S RPH KANPUR (ZEBRA, PANTHER, TRANTULLA) | 1 | Job | - | - |
| 1.09 | ERECTION OF CT JUNCTION BOX THE JOB ALSO INCLUDES CONNECTING EARTHING STRIPS FROM TWO SIDES BY MS FLAT SIZE 50X6 MM WITH THE HELP OF ELECTRIC WELDING WORK / SUITABLE SIZE OF COPPER BONDS | 2 | Job | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
Tendernotice_2.pdf
PDF • 1.01 MB
BOQ_2203957.xls
BOQ • 0.27 MB
EXTN.pdf
PDF • 0.74 MB
EXLETTER04.pdf
PDF • 0.90 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].