Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical TECHNICALLY RESPONSIVE |
| 2 | Accepted-Technical | Accepted-Technical TECHNICALLY RESPONSIVE |
| 3 | Accepted-Technical | Accepted-Technical TECHNICALLY RESPONSIVE |
| 4 | Accepted-Technical | Accepted-Technical TECHNICALLY RESPONSIVE |
| 5 | Accepted-Technical | Accepted-Technical TECHNICALLY RESPONSIVE |
Tender Value
₹37.5 L
EMD Value
₹75,000
Closing Date
18 Aug 2026, 3:00 pmClosed
Commissioner
Tiruppur City Municipal Corporation
Construction of Additional Kitchen centre for Perunthalaivar Kamarajar Breakfast Scheme at Vijayapuram in Ward No.47 in Tiruppur City Municipal Corporation
2026_MAWS_690279_3
E1/1867/2026
Open Tender
Civil Works - Buildings
Works
Tiruppur City Municipal Corporation
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹75,000
Tiruppur City Municipal Corporation
27 Aug 2026
3 Aug 2026
18 Aug 2026
3 Aug 2026
18 Aug 2026
3 Aug 2026
7 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling the existing Brick / Stone masonry in cement mortar walls including removing the debris from the site and stacking useful material at work site for reuse etc., complete complying with standard specification. | 17.25 | 1 M³ | - | - |
| 2 | Earth work excavation for foundation by manual means for RR/Brick and Other step type footings for Load bearing structures in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 8.1 | 1 M³ | - | - |
| 3 | R.R.Masonry in Cement mortar 1:5 for Foundation and Basement (New stone) including simultaneously pointing above ground level with the same mortar, Cost of Mortar Plasticizer used etc.,complete complying with standard specification and as directed by the Departmental Officers. | 4.05 | 1 M³ | - | - |
| 4 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 262.55 | 1 M³ | - | - |
| 5 | Cement Concrete 1:3:6 (One Cement, Three crushed stone sand and Six broken stone jelly) using 40mm size hard broken stone jelly excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete and as directed by the departmental officers. - Mixing by mechanical means | 28.98 | 1 M³ | - | - |
| 6 | Supplying and erecting centering for plane surfaces such as RCC Floor/Roof Beam, Lintels, Cantilever Beams, Bed Blocks etc., with necessary supports and strutting above 3.60m upto 4.90m height in all floors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over Steel adjustable Span of Size 2m x 2m (expandable upto 3.60m) and Silver Oak Joists of Size 10 x 5 cm spaced at 50cm to 60cm c/c and supported by Steel Adjustable Telescopic Props of Size 2.40 x 3.0m (expandable upto 4.90m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick) Spaced at not more than 50 to 60cm c/c and with Cross bracings provided at two levels at a spacing of 1.80m etc complete complying with standard specifications. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid). | 11.96 | 1 M² | - | - |
| 7 | Providing and laying in position, standardised concrete Mix M-20 Grade using In-situ Concrete batching plant/ Ready Mix Concrete (RMC) adopting weigh batch method in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 Cu.m) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 Cu.m) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including Conveyance of concrete from batching plant to Work site, Electricity charges and other works & labour cost involved for concrete production, laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials).
For Foundation and Basement | 11.96 | 1 M³ | - | - |
| 8 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire)
Upto Plinth / Basement level | 20.67 | 1 Qtl | - | - |
| 9 | Brick work in following Cement Mortar using best quality Burnt Clay Brick of size 9” x 4 1/2” x 3” with class designation of 10 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge.
In Cement Mortar 1:5 (For Foundation and Basement) | 29.53 | 1 M³ | - | - |
| 10 | Plastering the surface of walls with Cement Mortar 1:3 (One cement and Three plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc., complete complying with standard specification and as directed by the departmental officers. | 279.83 | 1 M² | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
BID03.pdf
Tender Documents • 0.65 MB
BOQ_829831.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .