Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.0 CrQualified | L1 | Qualified MSE, MII | |
| 2 | L2₹13.9 Cr+₹90.8 L (7.01%)Qualified C 4 II ND FLOOR MALVIYA NAGAR NEW DELHI DELHI 110017 | SOUTH DELHI | DELHI | 110017 | L2 | Qualified MII | |
| 3 | L3₹14.0 Cr+₹1.1 Cr (8.41%)Qualified 501 ANDHERI EAST SAMARPAN COMPLEX NEW LINK ROAD VILLAGE TOWN CHAKALA CITY MUMBAI MUMBAI MAHARASHTRA 400099 INDIA | MUMBAI SUBURBAN | MAHARASHTRA | 400099 | L3 | Qualified MSE, MII | |
| 4 | L4₹14.8 Cr+₹1.9 Cr (14.5%)Qualified HADAPSAR INDUSTRIAL ESTATE HADAPSAR INDUSTRIAL ESTATE HADAPSAR POST OFFICE HADAPSAR PUNE MAHARASHTRA 411013 | PUNE | MAHARASHTRA | 411013 | L4 | Qualified MII | |
| 5 | L5₹15.3 Cr+₹2.3 Cr (18.1%)Qualified 35 MR UJJWAL DIDWANIA 35 OKHLA INDUSTRIAL ESTATE PHASE NEW DELHI 110020 971 NEW DELHI DELHI 110020 | SOUTH EAST DELHI | DELHI | 110020 | L5 | Qualified MII |
Tender Value
Refer Docs
EMD Value
₹20 L
Closing Date
19 Apr 2024, 4:00 pmClosed
SUPPLY OF 250 SCMH AND 400 SCMH BOOSTER
6272211
GEM/2024/B/4825092
Two Packet Bid
ASSAM 250 SCMH ELECTRIC MOTOR DRIVEN HYDRALIC BOOSTER COMPRESSOR PACKAGE,ASSAM LCV unloading post w
182 days
Assam; Kamrup Metro
Total value wise evaluation
BOQ
8 documents required · 8 mandatory
3 yrs
₹3
₹20 L
26 Apr 2024
29 Mar 2024
19 Apr 2024
| Item No | Item Title | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|
| 1 | ASSAM 250 SCMH ELECTRIC MOTOR DRIVEN HYDRALIC BOOSTER COMPRESSOR PACKAGE | 7 | Nos | buycon1.negdcl | 182 |
| 2 | ASSAM LCV unloading post with Coriolis Mass Flow meter 4inch Dial size | 7 | Nos | buycon1.negdcl | 182 |
| 3 | ASSAM Erection and Commissioning | 7 | Nos | buycon1.negdcl | 182 |
| 4 | ASSAM Operation charges for 1st year ie during Warranty period | 3,833 | No of shifts | buycon1.negdcl | 182 |
| 5 | ASSAM Operation charges for 2nd year ie after Warranty period | 6,388 | No of shifts | buycon1.negdcl | 182 |
| 6 | ASSAM Operation charges for 3rd year ie after Warranty period | 6,388 | No of shifts | buycon1.negdcl | 182 |
| 7 | ASSAM Operation charges for 4th year ie after Warranty period | 6,388 | No of shifts | buycon1.negdcl | 182 |
| 8 | ASSAM Operation charges for 5th year ie after Warranty period | 6,388 | No of shifts | buycon1.negdcl | 182 |
| 9 | ASSAM Comprehensive Maintenance charges for 1st year ie after the Warranty period | 84 | Machine Months | buycon1.negdcl | 182 |
| 10 | ASSAM Comprehensive Maintenance charges for 2nd year ie after the completion of 1st year | 84 | Machine Months | buycon1.negdcl | 182 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_6272211.pdf
GEM_BID
technical_2024-03-29-14-20-40_dd48fdb54bde98ff23b5a5106453c43b.pdf
BOQ
boq_2024-03-29-14-20-40_48f3631854b04fbad4e4888a93531c32.csv
BOQ
Commercial_8227fa5a-60e1-46d7-9b0c1711705784185_buycon1.negdcl.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .