Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.6 LAccepted-Finance HARI OM BHAWAN CIRCULAR ROAD UPPER KAITHU SHIMLA | ₹5.6 L | L1 | Accepted-Finance Being L1 |
| 2 | L2₹5.9 LRejected-Finance HIMACHAL PRADESH HP | CHAMBA | HIMACHAL PRADESH | 176207 | ₹5.9 L | L2 | Rejected-Finance Being L2 |
| 3 | L3₹6.2 LRejected-Finance TEHSIL BHORANJ VILLAGE SAMMU BHORANJ ROAD DISTT HAMIRPUR HP 176045 | HAMIRPUR | HIMACHAL PRADESH | 176045 | ₹6.2 L | L3 | Rejected-Finance Being L3 |
Tender Value
₹8.0 L
EMD Value
₹16,000
Closing Date
5 May 2026, 2:00 pmClosed
XEN Electrical Division No. 1 Shimla
The Executive Engineer Electrical Division No-I, HPPWD, Kasumpti, Shimla-9
RO of Fire Fighting in Vidhan sabha Shimla H.P for the year 2026-2027 w,e.f 02.05.2026 to 01.05.2027
2026_PWD_135170_7
Electrical Division-I dated 27.04.2026
Open Tender
Electrical Works
365 days
SHIMLA
As per bidding document
12 documents required · 12 mandatory
₹350
₹16,000
22 Jun 2026
27 Apr 2026
6 May 2026
27 Apr 2026
5 May 2026
27 Apr 2026
Running and operation of Fire Fighting system complex and theout side complex as per the time period anddecription below.
This includes deployment of electricians/technician/pump operator/fireman/Pump-operator-cum-helper for running and operation of fire fighting and fire alarm system round the clock uptil the time period of the contract.
This alos includes the minor repairs, maintenance of fire Equipments,Operation & Testing of fire fighting system i.e Motor Engine,Pump,House pipe,stand post Hydrant,Sluice valves,Public address system and distribution of water supply, ring main and risers etc. complete in all respects as desred by the Engineer-in-charge.
This includes minor repairs,such as replacement of MCB Glasses, Panel Cards,Rubber Gasket,Bearing for motor pumps,Fuses links,Gland Dori , cleaning agents, soap, detergents,cloth & emery paper,Oil & Grease for moving parts,maintain of Log-book, etc.as amd when required.
R/O of Fire Fighting Vidhan sabha Shimla for the year 2026-26 (w.ef..02.05.2026 to01.05.2027).complete as described above.
Electricions/pump operation/Technicaion
Fireman/pump-operator-cum-helper.
Terms & Condition :-
The contractor shall have to deploy at least one no .trained Electricians/Technician/Pump Operator/fireman/pump-operator-cum-helper in the shift manner for the job.The number of such shifts shall not be less than 3.00(Three) in one day i.e 24 hours.The person shall have to be familiar about the system and equipments installed in the building.The contractor shall be fully equipped with necessary testing and safety equipments and shall follow all the safety measures strictly.
This contract shall cover the annual i.e 12 months maintenance,running,operation and testing of the fire fighting and fire alarm system as per the scope of the work contained in the main abstract.
This will also include the minor repair,such as replacement of MCP Glasses,Panel Cards,Rubber Gasket,Bearing for motor pumps,Fuses links,Gland Dory etc.as and when required.
Competent service engineer/technician will be required to attend break down calls as and when intimated within the least possible time but not more then 24 hours in any case, there is no limit of break down call.The sole responsibility shall be of the firm to keep the whole system in running condition round the clock.
The contractor will ensure that control system is attended/ maintained round the clock by his competent staff to ensure timely action in case of fire hazards.Any accident or damage during maintenance/operation will be the responsibility of the contractor and the Employer will not entertain any claim,compensation,and penality.on this account or on account of non observation of any other requirement of law relevant to his work.
The work shall be carried out as per direction and up to the satisfaction of Engineer-in-Charge.
The contractor shall have to submit the detail of person employed to the department with the address/ID proof.
The Contractor shall have to ensure the emtry of only authorized persons into the building/control room.He shall ensure the safety of all the system equipments and material in the control room.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.36 MB
DeclarationNEW.pdf
Additional Documents • 0.01 MB
SBD_7FF.pdf
Tender Documents • 2.86 MB
BOQ_200172.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid