Loading…
Loading…
Tender Value
₹12.4 L
EMD Value
₹24,713
Closing Date
26 Jan 2026, 4:00 pmClosed
JR, CPS, Visva-Bharati
Visva-Bharati, Santiniketan, Bolpur
Construction of Fencing with Grill Gate for North Side of Pous Mela Ground, Santiniketan.
2025_VB_884945_2
CPS/964/2025-26
Global Tenders
Civil Works
90 days
Visva-Bharati
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Accounts Officer
₹24,713
9 Jan 2026
9 Jan 2026
27 Jan 2026
9 Jan 2026
26 Jan 2026
9 Jan 2026
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. - Depth of excavation not exceeding 1500 mm
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) - With earth obtained form excavation of foundation
Brick work with 1st class bricks in cement mortar (1:6) - In foundation and plinth
125 mm thick brick work with 1st class bricks in cement mortar (1:4) - In ground floor
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, as per relevant IS codes. - Pakur variety - In ground floor
Cement concrete with graded stone ballast (40 mm size excluding shuttering) - In ground floor - Pakur Variety - 1:3:6 proportion
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. - Tor steel / mild steel (JSW/JSPL/Shyam/ SRMB/BMASL/ Electro Steel/SSL) - In foundation, basement and upto roof of ground floor / upto 4m
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) - (When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed for every 4 m or part thereof) - 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In- Charge. - In ground floor
Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.
M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-in- charge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS:816-1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814-2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. - Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof.
For structural members of specified sections weighing less than 22.5Kg./m.
M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs. - Grill weighing above 16 Kg./sq.mtr and above - In ground floor
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints incl. throating, nosing & drip course, scaffolding/staging where necessary (ground floor) [excluding cost of chipping over concrete surface] - In ground floor - With 6:1 cement mortar
20 mm. thick plaster
15 mm. thick plaster
Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured(matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. - One Coat - In ground floor
Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturer's specification and as per direction of EIC to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer. - Premium 100% Acrylic emulsion (Weathershield/ Weathercoat/ Snowcryl XT/Apex) - In ground floor (Two coats)
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : - On steel or other metal surface - With super gloss (hi-gloss) - 2 coats (with any shade except white)
Painting with ready mixed red lead paint of approved make and brand: - One coat
Supplying, fitting, fixing, Chain link fencing of approved quality with R.C.C posts wooden posts or iron posts by means of galvanised "C" clips to grid of horizontal strands of galvanised high tensile spring steel wire of 12 S.W.G which have to be tensioned and fixed to the vertical posts by means of galvanised special clips, bolts and nuts etc. - 65 mm x 65 mm x 8 g - (The rate is exclusive of the cost of posts)
Supplying fitting galvanasied reinforced barbed tape (2.6mm to 2.5mm core wire over 0.50 GI sheet punch between 20mm gaps) in fencing (holes already made in the body of the post) or fixed by staplels tightening and fixing the wire in taut condition with straightenign bolts including the cost of cutting and lapping of joints in the R barbed tape as necessary but excluding the cost of galvanized stapes straining bolts and binding wires whwere necessary.
Labour Welfare Cess & GST , as applicable, will be added extra
Please Enable Macros to View BoQ information
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.99 MB
Tendernotice_2.pdf
PDF • 0.60 MB
BOQ_938973.xls
BOQ • 0.28 MB
BIDNOTICE.pdf
Tender Documents • 0.58 MB
Download all tender documents and submit your bid