Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.2 L+₹331.71 (0.29%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹1.3 L+₹15,801.45 (13.6%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹1.3 L+₹16,932.28 (14.6%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-GST UPLOADED OUTDATED |
Tender Value
₹1.5 L
EMD Value
₹3,000
Closing Date
7 Sept 2026, 4:00 pmClosed
Executive Engineer RnB Division Langate
RnB Division Langate
Construction of Wing Wall to Culvert at Renin Pazipora
2026_PWDJK_322870_4
30/3065-74/2026-27/RnB/Langate Dated 31/08/2026
Open Tender
Civil Works
Percentage
10 days
Langate
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
MH 0059
₹3,000
9 Sept 2026
31 Aug 2026
8 Sept 2026
31 Aug 2026
7 Sept 2026
31 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in all kinds of soil by mechinical means in trenches for foundation, drains, pipes, cables etc. (not exceeding 1.5 Mtr. In width) and for shafts, wells, cesspits and the like not exceeding 10 Sqm on plan depth up to 1.5 Mtr; including disposal of excavated earth as per the directions of engineer incharge complete job. | 9.17 | Cum | 256.85 | ₹2,355.31 |
| 2 | Supply & laying of dry stone soling including hand packing and ramming including all leads lifts cost & carriages of materials involved upto site of work complete. (NON- SOR) | 1.65 | Cum | 1,000 | ₹1,650 |
| 3 | Providing & laying in position specified grade of cement concrete, including the cost of centering, shuttering, finishing. All work up to plinth level in 1: 4: 8 (1 cement: 4 coarse sand: 8 graded stone aggregate) 40mm nominal size Crushed, including all leds, lifts cost & avg carriages of materials upto site fo work complete. | 0.56 | Cum | 0.9 | ₹0.5 |
| 4 | Providing & laying in position specified grade of cement concrete, including the cost of centering, shuttering, finishing, curing. All work upto plinth level in 1: 2: 4 (1 cement: 2 coarse sand: 4 graded stone aggregate) 20mm nominal size Crushed, including all carriages of materials upto site fo work complete.
(SOR NO 4.4.3) | 15.12 | Cum | 6,941.25 | ₹1,04,951.7 |
| 5 | Centering and shuttering including strutting and propping etc and removal of form work walls (any thickness) incl attached pilasters, buttresses, plinth and string course etc. | 38.47 | Sqm | 628.95 | ₹24,195.71 |
| 6 | Centering and shuttering including strutting and propping etc and removal of form work for in foundation, footing bases of columns etc complete | 3.72 | Sqm | 286.35 | ₹1,065.22 |
| 7 | Edges of slabs and breaks in floors and walls | 15.24 | Rm | 262.2 | ₹3,995.93 |
| 8 | Supply and Filling of Nallah Muck/ 2nd class Stones in Layers behind R wall incl. all carriages (NON SOR) | 5.69 | Cum | 1,000 | ₹5,690 |
| 9 | Providing and fixing of 3"PVC pipes for weaping holes. | 15 | Rm | 250 | ₹3,750 |
stage.html
html • 0.02 MB
finance_1084894.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_1084894.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .