Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical All documents |
| 2 | Accepted-Technical | Accepted-Technical All documents |
| 3 | Accepted-Technical | Accepted-Technical All documents |
| 4 | Accepted-Technical | Accepted-Technical All documents |
| 5 | Accepted-Technical | Accepted-Technical All documents |
Tender Value
₹14.3 L
EMD Value
₹28,620
Closing Date
11 Jul 2026, 4:00 pmClosed
Ex. Engineer CDC SMC Srinagar
Regal Lane Lal Chowk Srinagar
Construction of RCC pipe drain Including manholes at Habak crossing near Kashmir University
2026_HAUDD_314478_8
e_NIT_NO_11_CDC_of_2026_27
Open Tender
Civil Works
Percentage
45 days
Srinagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹750
FA/ CAO SMC,
₹28,620
14 Jul 2026
3 Jul 2026
13 Jul 2026
4 Jul 2026
11 Jul 2026
4 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Dismantling and Sacrifying of road surface including stacking of serviceable material within 50Mtr lead Bound Macadam Road | - | Sqm | - | - |
| 2.01 | Earth work in excavation by manual means trenches for foundations drains, pipes and cables (not exceeding 1.5m.in width) and for shafts, wells cesspits and the like not exceeding 10 Sqm on plan, including dressing of side and ramming of bottoms lift upto 1.5 m including getting out excavated earth and disposal of surplus excavated earth by directed All kinds of Soil | 1 | Cum | - | - |
| 2.02 | Earth work in excavation by mechanical means trenches for foundations drains, pipes and cables (not exceeding 1.5m.in width) and for shafts, wells cesspits and the like not exceeding 10 Sqm on plan, including dressing of side and ramming of bottoms lift upto 1.5 m including getting out excavated earth and disposal of surplus excavated earth by directed All kinds of Soil | 1 | Cum | - | - |
| 2.03 | Extra for every additional lift of 1.5m or part there off in all kind of soil | - | Cum | - | - |
| 2.04 | Extra Quantity of work excavated in muddy condition (the extra percentage rate is applicable in respect of each item but limited Quantity of work excavated in these difficult conditions | - | Cum | 1 | - |
| 3.01 | Close timbering has including strutting sharing and packing cavities (wherever required) complete a)- depth not exceeding 1.5m | - | Sqm | - | - |
| 3.02 | Close timbering has including strutting sharing and packing cavities (wherever required) complete a)- Exceeding 1.5m but not 3m | - | Sqm | 1 | - |
| 3.03 | Close timbering has including strutting sharing and packing cavities (wherever required) complete a)- Exceeding 3m but not 3.5m | - | Sqm | - | - |
| 4Providing and laying of stone soling in trenches for drain including manholes. | |||||
| 5 | Providing & laying in position Cement concrete of specified grade excluding the cost of centring & shuttering All work upto Plinth level in:- 1:4:8 (1cement:4coarse sand: 8graded stone aggregate 40mm nominal size) Crushed | - | Cum | 1 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
BOQ_1018304.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .