Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAccepted-AOC | ₹2.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.2 Cr+₹3.5 L (1.63%)Rejected-Finance CIVIL LINE THANA KOTWALI DISTRICT BASTI | GONDA | UTTAR PRADESH | 271305 | ₹2.2 Cr+₹3.5 L (1.63%) | L2 | Rejected-Finance L2 |
| 3 | L3₹2.2 Cr+₹6.8 L (3.17%)Rejected-Finance 0 BAGHI NAUGARH NAUGARH CHANDAULI UTTAR PRADESH 232111 | CHANDAULI | UTTAR PRADESH | 232111 | ₹2.2 Cr+₹6.8 L (3.17%) | L3 | Rejected-Finance L3 |
| 4 | L4₹2.2 Cr+₹7.3 L (3.42%)Rejected-Finance VILL POST BHANPUR DISTT BASTI | BHANPUR | BASTI | UTTAR PRADESH | ₹2.2 Cr+₹7.3 L (3.42%) | L4 | Rejected-Finance L4 |
| 5 | L5₹2.3 Cr+₹13.6 L (6.37%)Rejected-Finance GRAM TINANHARI POST NATHNAGAR THANA MAHULI DISTRICT SANT KABIR NAGAR | AMROHA | UTTAR PRADESH | 244102 | ₹2.3 Cr+₹13.6 L (6.37%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/S BHAGWATI TRADERS L2 | Devendra Nath Mishra L1 | M/S ANAND CONSTRUCTION COMPANY L6 | AKANKSHA ASSOCIATES L3 | SHIVANAND SHUKLA L5 | GARIMA INFRASTRUCTURE L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in digging in trench for laying apron with propal disposal | 7,245 | Cum. | 51 ₹3,69,495 | 50 ₹3,62,250 | 50 ₹3,62,250 | 20 ₹1,44,900 Lowest | 60 ₹4,34,700 | 50 ₹3,62,250 |
| 2.00Supplying and Laying G.I.wire Crate size 3.00x2.00x0.45,3.00x1.00x0.45 and 2.00x1.00x0.45 for M.S.Boulder in launching Apron including cost of all carriage,loading,unloading ,labour and T&P etc.but excluding cost of Boulder. | |||||||||
| 3.00Size | |||||||||
| 4.00 | 3.00x2.00x0.45 | 777 | No. | 3,601 ₹27,97,977 | 4,100 ₹31,85,700 | 4,200 ₹32,63,400 | 3,100 ₹24,08,700 Lowest | 3,800 ₹29,52,600 | 3,698.22 ₹28,73,516.94 |
| 5.00 | 3.00x1.00x0.45 | 56 | No. | 1,951 ₹1,09,256 Lowest | 2,100 ₹1,17,600 | 2,100 ₹1,17,600 | 2,999 ₹1,67,944 | 3,200 ₹1,79,200 | 1,975.08 ₹1,10,604.48 |
| 6.00 | 2.00x1.00x0.45 | 233 | No. | 1,329.4 ₹3,09,750.2 Lowest | 1,500 ₹3,49,500 | 1,400 ₹3,26,200 | 2,850 ₹6,64,050 | 3,000 ₹6,99,000 | 1,345.55 ₹3,13,513.15 |
| 7.00 | Supply,carriage and laying of Geo textile sheet below M.S.Boulder pitching with cost,carriage,loading,unloading etc. | 1,780 | Sqm | 107.1 ₹1,90,638 | 90 ₹1,60,200 | 70 ₹1,24,600 Lowest | 111 ₹1,97,580 | 120 ₹2,13,600 | 108.36 ₹1,92,880.8 |
| 8.00Supplying and Laying G.I.wire Crate size 3.00x2.00x0.30,3.00x1.00x0.30 and 2.00x1.00x0.30 for M.S.Boulder in 0.30 M thick Slope pitching with cost of carriage,loading,unloading and including cost of all carriage,loading,unloading ,labour and T&P etc.but excluding cost of Boulder. | |||||||||
| 9.00Size | |||||||||
| 10.00 | 3.00x2.00x0.30 | 195 | No. | 3,181.1 ₹6,20,314.5 | 3,500 ₹6,82,500 | 3,500 ₹6,82,500 | 2,800 ₹5,46,000 Lowest | 3,500 ₹6,82,500 | 3,218.55 ₹6,27,617.25 |
Tender Value
Refer Docs
EMD Value
₹5.2 L
Closing Date
7 Apr 2026, 2:00 pmClosed
Superintending Engineer
Superintending Engineer, Gandak Flood Circle, Basti
Construction of Km. 4.400 to Km. 4.700 in Between 04 no. Dampners in 280 m length for Protection of Village Maujpur on Gaura-Saiphabad bund on left bank of River Ghaghra (Saryu) in Distt. Basti.
2026_UPIDC_1122380_35
04/SE/2025-26
Open Tender
Civil Works
Item Wise
90 days
Basti
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,940
₹5.2 L
Yes
14 Jul 2026
2 Apr 2026
7 Apr 2026
2 Apr 2026
7 Apr 2026
2 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in digging in trench for laying apron with propal disposal | - | Cum. | - | - |
| 2 | Supplying and Laying G.I.wire Crate size 3.00x2.00x0.45,3.00x1.00x0.45 and 2.00x1.00x0.45 for M.S.Boulder in launching Apron including cost of all carriage,loading,unloading ,labour and T&P etc.but excluding cost of Boulder. | - | - | - | - |
| 3 | Size | - | - | - | - |
| 4 | 3.00x2.00x0.45 | - | No. | - | - |
| 5 | 3.00x1.00x0.45 | - | No. | - | - |
| 6 | 2.00x1.00x0.45 | - | No. | - | - |
| 7 | Supply,carriage and laying of Geo textile sheet below M.S.Boulder pitching with cost,carriage,loading,unloading etc. | - | Sqm | - | - |
| 8 | Supplying and Laying G.I.wire Crate size 3.00x2.00x0.30,3.00x1.00x0.30 and 2.00x1.00x0.30 for M.S.Boulder in 0.30 M thick Slope pitching with cost of carriage,loading,unloading and including cost of all carriage,loading,unloading ,labour and T&P etc.but excluding cost of Boulder. | - | - | - | - |
| 9 | Size | - | - | - | - |
| 10 | 3.00x2.00x0.30 | - | No. | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.70 MB
BOQ_2114047.xls
BOQ • 0.32 MB
Lot_05.pdf
Tender Documents • 2.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .