Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.2 LAccepted-AOC | ₹25.2 L Quoted ₹29.7 L | L1 | Accepted-AOC AOC |
| 2 | L1₹29.7 LRejected-Finance 180 A VIKAS NAGAR KANPUR | KANPUR | KANPUR | UTTAR PRADESH | ₹29.7 L | L1 | Rejected-Finance L1 |
| 3 | L1₹29.7 LRejected-Finance | ₹29.7 L | L1 | Rejected-Finance L1 |
| 4 | L2₹33.2 L+₹3.4 L (11.5%)Rejected-Finance H NO 413 VILLAGE SULKHANI P O BUGANA 125121 | HISAR | HARYANA | 125121 | ₹33.2 L+₹3.4 L (11.5%) | L2 | Rejected-Finance L2 |
Tender Value
₹35 L
EMD Value
₹3.5 L
Closing Date
10 Apr 2026, 3:00 pmClosed
CHIEF ENGINEER, KMC
Motijheel
Demolition and Construction of Community Center Sekhpur Ward-12 Zone02
2026_NNKAN_1132849_1
Tn/11/AA-2/Awasthapana/25-26
Open Tender
Civil Works
Fixed-rate
60 days
zone 2
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,773
₹3.5 L
22 Jun 2026
3 Apr 2026
10 Apr 2026
3 Apr 2026
10 Apr 2026
3 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | dismentling RCC or reinficed brick work damaged etc all comp | 0.2 | cum | - | - |
| 2 | dismentling of old damaged brick work etc all comp | 0.35 | cum | - | - |
| 3 | E/W in Excavation in trenches for foundation pipe cable etc in ordinary soil (loan clay or sand ) including 1.5left and 50m and dressing of side and ramming of bottom and disposal of surplus axcavated earth as directed by the engineer ic/within a lead of 60 m etc all comp. | - | cum | - | - |
| 4 | supplying and filling in plinth with Sand Under floors etc all comp. | - | cum | - | - |
| 5 | providing and laying in cement conc Concrete 1:4:8(1 Cement4 fine sand and 8 gauge stone Ballast)and curing comp including cost of form work in foundation and floors etc all comp.CH 5 PWD (4.1.8) | 1 | cum | - | - |
| 6 | centering & shuttering inc lfoundation footing bases columns etc all comp (DSR/PWD 5.9.1) | 0.6 | sqm | - | - |
| 7 | centering & shuttering inc suspended floors roof etc all comp (DSR/PWD 5.9.3) | - | sqm | - | - |
| 8 | centering & shuttering inc lintels beams etc all comp (DSR/PWD 5.9.5) | 0.2 | sqm | - | - |
| 9 | hire charge for M.S. iron / wood ply shuttring with ballies for support and wooden 10cm sq batta , phanti , gutka scafolding etc all comp | - | sqm | - | - |
| 10 | p/l in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering,finishing and renforcement 1:1.5:3 (1 cement :1.5coarse sand :3 graded stone aggregate 20mm size etc all comp (ch-5, sn-14, ref- 5.1.2) | 0.84 | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.89 MB
100stamp.pdf
Tender Documents • 0.30 MB
BOQ_2114535.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .