Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹15,445
Closing Date
12 Jul 2022, 2:00 pmClosed
Superintending Engineer
TNEB/Nagercoil
Works contract for execution of Imp estimate for Strengthening ACSR 7/2.59 into ACSR 7/3.35 in Verivilai SS III 100KVA, Conductor LT line 7/2.11 into 7/2.59 and insertion of 8 mtr pole and 9 mtr pole in CI Pudhukadai section under Kuzhithurai Dn
2022_EB_237545_1
KKEDC/ETW-09/22-23, Dt 24.06.2022
Open Tender
Electrical Works
Works
90 days
O/o theSuperintending Engineer/KKEDC/Nagercoil
As specified in tender
3 documents required · 3 mandatory
₹0
₹15,445
21 Jul 2022
27 Jun 2022
13 Jul 2022
28 Jun 2022
12 Jul 2022
28 Jun 2022
28 Jun 2022 - 11 Jul 2022
Loading & Unloading of 9 mt psc pole
Transporting of 9 mt psc pole road side to pole pit upto 2km(2 x 230)
Excavation of pole pit on rocky ground in 9 mt psc pole
Erection of 9 mt. PSC pole
Loading & Unloading of 8 mt psc pole
Transporting of 8 mt psc pole road side to pole pit upto 2km(2 x 180)
Excavation of pole pit on rocky ground in 8 mt psc pole
Erection of 8 mt. PSC pole
Fixing of V X arm and Tapping Channel
Fixing of 3Q X arm
Fixing of SQ X arm
Fixing of HT L Clamp
Pole Earthing
Fixing of insulater fittings Ht<
Dismantling & Re- erection of V X arm
Dismantling & Re- erection of 3Q X arm
Dismantling & Re- erection of SQ X arm
Dismantling & Refixing of HT L Clamp
Erection of stay set on rocky ground
Dismantling & Re-erection of stay set on rocky ground
Dismantling & Re-Fixing of street light
Redoing of SC connection
Pinpoint to Cut Point of Lt line
Pinpoint to Cut Point of Ht line
Stringing of Ht line 7/3.35
Dismantling of HT line 7/3.35
Stringing of Ht line 7/4.09
Dismantling of HT line 7/4.09
Stringing of Ht line 7/2.59
Dismantling of HT line 7/2.59
Stringing of Ht & Lt line 7/3.35
Dismantling & Re- Stringing of HT& LT line 7/3.35
Dismantling & Re- Strinding of LT line 7/2.59
Loading & Unloading Transporting of 9mt. Squre pole, Erection of Distn, Tr, Str as per complete Board Standard,in single pole structure
Loading ,unloading ,Transporting and Erection of Distn Transformer
Loading & Unloading of materials board store to office and office to work sport
Drilling of slotted holes
Tree Branch clearance
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .