Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr | L1 | Accepted-AOC Being L1 |
| 2 | L2₹1.4 Cr+₹7,500 (0.05%)Rejected-Finance | ₹1.4 Cr+₹7,500 (0.05%) | L2 | Rejected-Finance Other than L1. |
| 3 | L3₹1.5 Cr+₹8.2 L (5.69%)Rejected-Finance RAILWAY COLONY NOWGAM SRINAGAR JAMMU AND KASHMIR 190015 | BUDGAM | JAMMU AND KASHMIR | 190015 | ₹1.5 Cr+₹8.2 L (5.69%) | L3 | Rejected-Finance Other than L1. |
| 4 | L4₹1.6 Cr+₹11.8 L (8.20%)Rejected-Finance | ₹1.6 Cr+₹11.8 L (8.20%) | L4 | Rejected-Finance Other than L1. |
| 5 | L5₹1.6 Cr+₹13.2 L (9.16%)Rejected-Finance | ₹1.6 Cr+₹13.2 L (9.16%) | L5 | Rejected-Finance Other than L1. |
Tender Value
₹1.4 Cr
EMD Value
₹2.2 L
Closing Date
28 Oct 2024, 6:00 pmClosed
CWE, HQ 134 Works Engineers
HQ 134 Works Engineers PIN - 914134 C/o 56 APO
PROVN OF TRG SHED AT HAWS, SONAMARG UNDER GE 970 EWS
2024_MES_667615_2
134WE-30(T)/2024-25
Open Tender
Civil Works - Others
Lump-sum
550 days
GE 970 EWS
As per tender documents
11 documents required · 11 mandatory
₹1,000
GE 970 EWS
₹2.2 L
Yes
14 Nov 2024
14 Sept 2024
30 Oct 2024
14 Sept 2024
28 Oct 2024
15 Oct 2024
15 Sept 2024 - 28 Sept 2024
Amount
Notes :- (i) Please refer Schedule 'A' Notes given on serial page Nos 14 to 25 of CA.
LUMPSUM / OTHER PRE-PRICED PROVISIONAL SCH OF WORKS.
Lumpsum price worked out by the contractor for BUILDING WORKS (DESIGN AND BUILD) as listed in Schedule 'A' Part-I brought forward from Serial Page No. 26 of CA.
Lumpsum price worked out by the contractor for INTERNAL ELECTRIFICATION listed in Schedule 'A' Part-II (Section-I) brought forward from Serial Page NoS 27 & 28 of CA.
Lumpsum price worked out by the contractor for EXTERNAL ELECTRIC SUPPLY listed in Schedule 'A' Part-III brought forward from Serial Page Nos 30 & 31 of CA.
Lumpsum price worked out by the contractor for AREA DRAINAGE listed in Schedule 'A' Part-IV brought forward from Serial Page Nos 32 & 33 of CA.
Lumpsum price worked out by the contractor for EXCAVATION & EARTHWORK FOR SCH 'A' PART-II (Section I & II), Part-III & PART-IV, SITE CLEARANCE AND DEVELOPMENT listed in Schedule 'A' Part-V brought forward from Serial Page Nos 34 & 35 of CA.
Schedule 'A' Part-II (Section-II) (Internal Electrification)
S&F new geneation energy saving, environment friendly long life LED bldg security light fitting of 24/25 Watt made up of pressure die cast aluminium housing with high efficient LED with IP-66 and impact resistance of IK07 and including 43mm dia mounting bracket bend or weld to shape and length as required, complete all as specified and directed.
S&F LED luminaire 600x600mm, 35/36 Watt, 220 Volt AC recessed type with high efficiency PMMA diffuser soft glare free light complete with driver, holders & LED lamp suitable for roof ceiling including connecting up with driver three core flexible copper conductor cases of suitable size, complete all as specified and directed.
M/S Rather and Sons (BID ID -3144741)
AHMED CONSTRUCTIONS AND INFRA PVT LTD (BID ID -3145198)
M/s Muzaffar Ahmad Mir (BID ID -3141747)
G N Constructions (BID ID -3152355)
SOFI CONSTRUCTIONS (BID ID -3145103)
M/S SYED NOORULLAH RIZVI (BID ID -3143277)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .