Loading…
Loading…
Tender ID
Tender Value
₹24.2 L
EMD Value
₹48,440
Closing Date
30 Mar 2026, 4:00 pmClosed
Executive Engineer SND IInd
Darish Kadal
Construction of Storm water drain at Imam Zainul Abideen Colony Zainakote Srinagar Phase Ist
2026_HAUDD_306262_2
NIT NO 42 OF 2025-26 SNDII
Open Tender
Civil Works
Percentage
25 days
Zainakote
Please refer Tender documents.
6 documents required · 6 mandatory
₹750
Executive Engineer snd 2nd
₹48,440
18 Mar 2026
16 Mar 2026
31 Mar 2026
16 Mar 2026
30 Mar 2026
16 Mar 2026
Making connection of drain or sewer line with existing manhole including breaking into and making good the walls, floors with cement concrete 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) cement plastered on both sides with cement mortar 1:3 ( 1 cement : 3 coarse sand) finished with a floating coat of neat cement and making necessary channels for the drain etc. complete. For pipes 250 to 300mm diameter.
Dismantling manually/ mechanically including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: Bituminous road.ithin 50 mtrs lead as per direction of Engineer-in-charge.
Dismantling tile work in floors and roofs laid in cement monar including sacking material within 50 meters lead.
Demolishing cement concrete manully/ by mechanically means including disposal of material within 50 meters lead as per direction of Engineer-incharge . 1:3:6 or richer mix (I/c equivalent design mix)
Earth work in Bulk excavation by manually means over areas ( exceeding 30 cm in depth 1.5 m in width as well as 10m 2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m,as directed.All kinds of soil
Providing & Laying of Stone Soling duly hand packed on horizantal floor including hand ramming watering and levelling to the surface.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size (Crushed)
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement 2 coarse sand : 4 graded stone aggregate 20 mm nominal size (Crushed)
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level with 1:2:4(1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level, Thermo-Mechanically Treated bars of grabe Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal work of form work Retaining Walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc A. Manholes Walls Internal
B. Suspended floors,
C.Edges of slabs and breaks in floors and walls above 20 cm depth
Providing, laying ,Fixing in position precast R.C.C. manhole cover and frame (HD - 20) Circular shape 560mm internal diameter.
Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc.complete.Non-pressure NP-3 class (Medium duty) R.C.C. pipes 300mm
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each depositedlayer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Carriage of materials by mechinical means A. for stone soling from an average lead of 15 Kms.
B. For sand from an average lead of 15 Kms
C. For 20 mm aggregate average of 15 Kms.
D.For 40 mm aggregate average of 18 Kms.
E. 300MM DIA PIPES
Carriage of materials by mechinical means A. for stone soling from an average lead of 15 M.
B. For sand from an average lead of 15 Kms
C. For 20 mm aggregate average of 15 Kms.
D.For 40 mm aggregate average of 18 Kms.
E. 300MM DIA PIPES
Restoration of Minor PHE connection
Provision for Geotagged Photographs
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.25 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
BOQ_994417.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .