| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Technically Responsive |
| 2 | Accepted-Technical | Accepted-Technical Technically Responsive |
| 3 | Rejected-Technical | Rejected-Technical Technically Non-Responsive |
Tender Value
₹6.6 Cr
EMD Value
₹13.1 L
Closing Date
26 Mar 2026, 2:00 pmClosed
Chief Engineer, WRD, Assam
O/o the Chief Engineer, WRD, Assam, AWC Basistha, Ghy 29
Construction of embankment on L/B of river Mora-Pagladia from Pub-Barpit Bridge to Tribeni-Ghat including construction of sluice at Tribeni-Ghat.
2026_DoWR_50903_2
NALBARI/2025-26/SOPD G/III
Open Tender
Civil Works
Works
180 days
Nalbari
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹13.1 L
Yes
27 Aug 2026
16 Mar 2026
26 Mar 2026
16 Mar 2026
26 Mar 2026
21 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Medium Jungles: Clearing medium jungles and trees up to 15 cm. girth including cutting, uprooting roots and stumps, removing them from the site of the work, etc. complete as directed. (When 30% to 60 % of the area is covered by shrubs, trees etc.) | 2,025 | sqm | 17.31 | ₹35,052.75 |
| 2 | Felling trees including uprooting roots and stumps up to 50 cm. below ground, cutting into pieces and removing the same from the site of work etc. complete as directed.
Trees above 0.50 m and up to 1 m girth: | 158 | each | 248.08 | ₹39,196.64 |
| 3 | Cutting bamboo, uprooting roots & stumps including removing them from the site of work, etc.complete as directed. | 1,331.25 | sqm | 673.18 | ₹8,96,170.87 |
| 4 | Uprooting bamboo clumps where bamboo already removed including removing stumps to a minimum distance of 30 m etc., complete as directed. | 1,170 | sqm | 346.28 | ₹4,05,147.6 |
| 5 | Earth work in embankment by tractor trailer carriage by mechanical means with locally available ordinary/normal soil excluding sandy and rocky soil free from roots & vegetation and filling in uniform layers not exceeding 25 cm thick including ploughing or roughening or benching the seats, removing all debries, breaking clods up to 4 cm cube, dressing as per design section and compaction with three wheel static roller of 80-100 kN capacity in layers not exceeding 30 cm in thickness and core cutter soil test at every layer and every 500 m distance, etc. complete as directed.For initial Lead up to 1.00 Km for all lifts. | 61,515.35 | Cum | 277.53 | ₹1,70,72,355.09 |
| 6 | Turfing with grass sods of largest possible rectangles of 12 cm. minimum thickness placed closely including dressing earth pegging with Jati bamboo split, watering till the grass grows for a lead up to 90 m and all lifts, etc. complete as directed. | 29,474.41 | sqm | 30.18 | ₹8,89,537.69 |
| 7 | Supply of geo-textile Tube (Mega containers) with minimum properties as mentioned below
• Polymer = PP of 400 GSM or above
• Tube Circumference = 10 m + 5% (m)
• Fill Port (diameter) = 30 to 45 CM
• Tensile Strength (MD) ≥ 100 kN/m
• Tensile Strength (CD) ≥ 100 kN/m
• Elongation – MD ≤ 25%
• AOS ≤ 0.180 mm
• Permittivity ≥ 0.40 S-1
• Length = 25 m | 93 | tube | 1,08,222.11 | ₹1,00,64,656.23 |
| 8 | Filling of geo-tubes (25m long and 10m circumference) with sand/silt of volume 176 cum by using mud pump not below the fill height of 1.60m as per drawing and technical specifications, binding the tube with 9mm nylon rope to jati bamboo pegs of length 2m placed @ 5m c/c along both sides of the tube to keep the tube in position during filling. as specified and directed including all loading, unloading and handling charges and local carriage upto a distance of 250M, pumping slurry using mud pump from a distance upto 250m, etc. including setting up of the tube laying platform, complete as directed. | 93 | each | 39,784.7 | ₹36,99,977.1 |
| 9 | Construction of whole bamboo single palisading with matured Bhaluka bamboo posts 7.5 cm to 10 cm dia.,15 cm clear apart 1.50 m to 1.80 m above ground and 1.00 m to 1.20 m below ground with Bhaluka bamboo inclined struts placed at 1.5 m a part tied with threerows of horizontal half Jati bamboo kamies etc.complete as directed.(Using Bhaluka Bamboo at the rate of 10.14 nos./Rm & Jati Bamboo at the rate of 2.40 nos. | 880 | Rm | 879.18 | ₹7,73,678.4 |
| 10 | Serviceable empty cement bags. | 15,714 | each | 10.17 | ₹1,59,811.38 |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
tribeni_ghat_bid.pdf
Tender Documents • 0.58 MB
BOQ_82437.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .