Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.8 LAccepted-AOC 303 GHS 888 SECTOR 20 PANCHKULA 134116 HARYANA | PANCHKULA | PANCHKULA | HARYANA | 134116 | L1 | Accepted-AOC Being L1 and reasonable | |
| 2 | L2₹18.6 L+₹3.6 L (23.8%)Rejected-Finance | L2 | Rejected-Finance Being L2 | |
| 3 | L3₹24.0 L+₹8.9 L (59.1%)Rejected-Finance 154 GANDHI MARKET AMBALA CANTT HARYANA 133001 | AMBALA CANTT | AMBALA | HARYANA | 133001 | L3 | Rejected-Finance Being L3 | |
| 4 | Rejected-Technical | - | Rejected-Technical SSD not deposited.Not available in WLR QE Mar 2022 by HQ CE WC, Earnest money not uploaded |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
22 Sept 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE Patiala
HQ CWE, Bldg No 26, New Lal Bagh, Patiala - 147001
REPAIR MAINTENANCE OF HV LV ELECTRICAL SYSTEM AT NEW CANTT PATIALA UNDER GE NORTH PATIALA
2022_MES_548211_1
8322/PAT/T-21/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
Patiala
As per cover 1
6 documents required · 6 mandatory
₹500
Yes
GE North Patiala
₹50,000
Yes
19 Oct 2022
27 Aug 2022
24 Sept 2022
27 Aug 2022
22 Sept 2022
13 Sept 2022
27 Aug 2022 - 5 Sept 2022
Amount
Providing labour transport and T&P for locating the fault in HT/LT line in OH/UG Line/cable in by visual inspection recce of faulty area and repairs to the fault by means of replacement of Unservicible Jumpers / Fuse wires / Burnt lugs / MCCB etc. inclusive of, restreching of broken ACCR counductors / Earth wire or taking out service connections and reconnecting the same after rectification of fault all as directed by Engineer in Charge. Note : (i) Materials requried for fault repairs will be measured under relevant items included in BOQ. (ii) Contractor will depute the dedicated team, he will completely responsible for all the safety aspects of his team. No dispute regarding safety of person would be entertain later on. If any mishappening occures during rectifaction of fault in HT/LT lines contractor will be fully liable to bear all the expenses of indls. Special Notes:- (for 66 KV Grid, Sub stn No.3 & Sub stn No.9) (a) Contractor will provide all set of T & P, communication device (Mobile Phone) to deployed persons, electrcian team for each sub station required for repair of HT/LT Electrical switch gear system including safety equipment such as All type of T&Ps (Bamboo ladders, screw drivers, wire/cable cutters with blades, multi meters, cutting plairs, torch lights etc) for routine maintenance and protection of the trademan incl safety equipment such as Hand gloves, Rubber boots, Sefety belt and helmets etc. (b) On intimation of any type of repair/maintenance work of HT/LT switch gear incomer as well as out going feeder the contractor is responsible to locate the fault by the dedicated team comprising tradesman helpers required numbers as per the gravity /nature of the work involved to restore the power supply and communicate with SBA on duty and getting permit card for working on HT lines and deposit the permit card after rectification of fault, all the activities shall be carried out within reasonable time as given by the Engineer-in-Charge. (c) Contractor will provide necessary complaint slip, complaint boook & permit book, contractor will direct the instructions to indls for lodgging the complaints duly marked the location, time and date for earlier rectifications. (d) Contactor will be liable to rectify the fault within 4 hrs from intimation of the same through e.mail / SMS. In case of failure to rectify the fault within the 4 hours from the time of intimation, contractor shall be liable for a penality of Rs. 50.00/hours subject to maximum of Rs 500/- per complaint.. (e) Contractor should also provide a dedicated supervisor for collection of complaints from SBA, JE, USER etc. He would be held responsible, in case complaints are not collected timely
Material and labour for replacement of HT fuse wire of capacity 5 Amps on two/four pole structure by dedicated team well known working on HT lines by using all means of safety gears/T&P after getting job card and permit slip of shut down all as directed and specified by Engr in Charge.
Material and labour for replacement of HT fuse wire of capacity 10 Amps on two/four pole structure by dedicated team well known working on HT lines by using all means of safety gears/T&P after getting job card and permit slip of shut down all as directed and specified by Engr in Charge.
Material and labour for replacement of HT fuse wire of capacity 25 Amps on two/four pole structure by dedicated team well known working on HT lines by using all means of safety gears/T&P after getting job card and permit slip of shut down all as directed and specified by Engr in Charge.
Material and labour for replacement of HT fuse wire of capacity 32 Amps on two/four pole structure by dedicated team well known working on HT lines by using all means of safety gears/T&P after getting job card and permit slip of shut down all as directed and specified by Engr in Charge.
Material and labour for replacement of HT fuse wire of capacity 40 Amps on two/four pole structure by dedicated team well known working on HT lines by using all means of safety gears/T&P after getting job card and permit slip of shut down all as directed and specified by Engr in Charge.
Material and labour for replacement of HT Disc insulator 11kV on single/two/four pole structure by dedicated team well known working on HT lines by using all means of safety gears/T&P after getting job card and permit slip of shut down all as directed and specified by JE/Engr in Charge.
Material and labour for replacement of HT Pin insulator 11kV on single/two/four pole structure by dedicated team well known working on HT lines by using all means of safety gears/T&P after getting job card and permit slip of shut down all as directed and specified by JE/Engr in Charge.
Material and labour for replacement of multi-jointed ACSR jumpers of HT over head lines with and incl XLPE/PVC insulated 11000 volts multi stranded aluminium conductor single core cable of size 120 sqmm as per colour code in sequence Red ,yellow ,blue and black for neutral incl fixing with ACSR conductors with suitable size PG (Parellel Groove) clamp complete all as specified and directed .(Length of one jumper not exceeding more than 3.0 mtrs .
Material and labour for replacement of multi-jointed ACSR jumpers of HT over head lines with and incl XLPE/PVC insulated 11000 volts multi stranded aluminium conductor single core cable of size 240 sqmm as per colour code in sequence Red ,yellow ,blue and black for neutral incl fixing with ACSR conductors with suitable size PG (Parellel Groove) clamp complete all as specified and directed .(Length of one jumper not exceeding more than 3.0 mtrs .
Material and labour for replacement of multi-jointed ACSR jumpers of LT over head lines with and incl XLPE/PVC insulated 1100 volts multi stranded aluminium conductor single core cable of size 120 sqmm as per colour code in sequence Red ,yellow ,blue and black for neutral incl fixing with ACSR conductors with suitable size PG (Parellel Groove) clamp complete all as specified and directed .(Length of one jumper not exceeding more than 3.0 mtrs .
Material and labour for replacement of multi-jointed ACSR jumpers of LT over head lines with and incl XLPE/PVC insulated 1100 volts multi stranded aluminium conductor single core cable of size 240 sqmm as per colour code in sequence Red ,yellow ,blue and black for neutral incl fixing with ACSR conductors with suitable size PG (Parellel Groove) clamp complete all as specified and directed .(Length of one jumper not exceeding more than 3.0 mtrs .
Supply and Fix cable lugs aluminium heavy duty type working voltage 1100 Volts suitable for cable up to 10 sqmm including necessary crimping with crimping tool complete all as specified and directed .
Supply and Fix cable lugs aluminium heavy duty type working voltage 1100 Volts suitable for cable up to 16 sqmm including necessary crimping with crimping tool complete all as specified and directed .
Supply and Fix cable lugs aluminium heavy duty type working voltage 1100 Volts suitable for cable up to 25 sqmm including necessary crimping with crimping tool complete all as specified and directed .
Supply and Fix cable lugs aluminium heavy duty type working voltage 1100 Volts suitable for cable up to 35 sqmm including necessary crimping with crimping tool complete all as specified and directed .
Supply and Fix cable lugs aluminium heavy duty type working voltage 1100 Volts suitable for cable up to 50 sqmm including necessary crimping with crimping tool complete all as specified and directed .
Supply and Fix cable lugs aluminium heavy duty type working voltage 1100 Volts suitable for cable up to 70 sqmm including necessary crimping with crimping tool complete all as specified and directed .
Supply and Fix cable lugs aluminium heavy duty type working voltage 1100 Volts suitable for cable up to 95 sqmm including necessary crimping with crimping tool complete all as specified and directed .
Supply and Fix cable lugs aluminium heavy duty type working voltage 1100 Volts suitable for cable up to 120 sqmm including necessary crimping with crimping tool complete all as specified and directed .
Supply and Fix cable lugs aluminium heavy duty type working voltage 1100 Volts suitable for cable up to 150 sqmm including necessary crimping with crimping tool complete all as specified and directed .
Supply and Fix cable lugs aluminium heavy duty type working voltage 1100 Volts suitable for cable up to 185 sqmm including necessary crimping with crimping tool complete all as specified and directed .
Supply and Fix cable lugs aluminium heavy duty type working voltage 1100 Volts suitable for cable up to 240 sqmm including necessary crimping with crimping tool complete all as specified and directed .
Supply and Fix cable lugs aluminium heavy duty type working voltage 1100 Volts suitable for cable up to 300 sqmm including necessary crimping with crimping tool complete all as specified and directed .
Supply and Fix cable lugs aluminium heavy duty type working voltage 1100 Volts suitable for cable up to 400 sqmm including necessary crimping with crimping tool complete all as specified and directed .
Connecting /disconnecting of air-conditioner in married officers quarters, OTM, offrs Mess from the existing over head lines all as directed and specified by Engr in Charge.(Cables and materials for connection will be provided by occupant /user of the accn)
Material and labour for bush/vegitation/roots cutting below two pole/ four pole structure approx area of yard 20 sqmtrs all as specified and directed by Engr-in-Charge.
Supply and fix in replacement MCCB with adjustable thermal and magentic setting type Release Range 63 Amps 4 Pole breaking capacity at 415 volt AC 50 Hz, 16 kA complete all as specified and directed.
Supply and fix in replacement MCCB with adjustable thermal and magentic setting type Release Range 100 Amps 4 Pole breaking capacity at 415 volt AC 50 Hz, 16 kA complete all as specified and directed.
Supply and fix in replacement MCCB with adjustable thermal and magentic setting type Release Range 160 Amps 4 Pole breaking capacity at 415 volt AC 50 Hz 36 kA complete all as specified and directed.
Supply and fix in replacement MCCB with adjustable thermal and magentic setting type Release Range 200 Amps 4 Pole breaking capacity at 415 volt AC 50 Hz 36 kA complete all as specified and directed.
Supply and fix in replacement MCCB with adjustable thermal and magentic setting type Release Range 250 Amps 4 Pole breaking capacity at 415 volt AC 50 Hz 36 kA complete all as specified and directed.
Supply and fix in replacement MCCB with adjustable thermal and magentic setting type Release Range 400 Amps 4 Pole breaking capacity at 415 volt AC 50 Hz 36 kA complete all as specified and directed.
Material and labour for providing necessary following stationary require to lodge the complaint, as per requirement and as per existing sample for a minimum period of 9 Months from the date of commencement of contract to 66 KV Grid, sub stn No.9 and sub stn No.3:- (i) Complaint Register/books as per sample. (ii) Complaint Slip/job card as per sample. (iii) Permit book as per sample. (iii) Other materials ie glue stick,pen, pencil, carbon paper and stainless steel scale 1'.
Material and labour for providing necessary following tools and plants to the employed person/team for attending day to day complaints for the period of commencement and completion of the contract:- (i) HV(11000Volts) digital insulation tester (ii) LV(1100V) digital insulation tester (iii) Digital Clamp meter up to 1100 v and 1000Amps (iv) Search light, rain coat (v) Cutting pliers (vi) Screw Driver set, box spanner/wretched spanner (vii) Allen key set (viii) 11000V grade safety gloves, Rubber boots, Sefety belt and helmets (ix) Earthing rod (x) Bamboo ladder for desired height. (xi) PVC tape roll(HV/LV) Note:- Theses above itemes are the property of contractor and return back to the contractor after completion of contract.
AR CONSTRUCTIONS
Esha Engineers
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .