| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.2 LAccepted-AOC | 1 | Accepted-AOC Lowest 1 | |
| 2 | 2₹8.7 L+₹93,864.50 (12.1%)Rejected-AOC | 2 | Rejected-AOC Lowest 2 | |
| 3 | 3₹8.8 L+₹99,172.05 (12.7%)Rejected-AOC | 3 | Rejected-AOC Lowest 3 | |
| 4 | 4₹9.6 L+₹1.8 L (23.2%)Rejected-AOC | 4 | Rejected-AOC Lowest 4 | |
| 5 | 5₹9.7 L+₹1.9 L (25.0%)Rejected-AOC | 5 | Rejected-AOC Lowest 5 |
| Sl No | Description | Qty | Unit | SURIYA ENGINEERING CONTRACTORS L5 | ARP Engineering Contractor L3 | CMR ENGINEERING WORKS L2 | M.SARAVANAN CONTRACTOR L4 | THANGAM .R L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling existing RCC Pavement as directed by the Engineer incharge as required place including cost of all labour charges, lift, etc., complete | 1.65 | 1 m² (One Square Meter) | 3,747 ₹6,182.55 | 3,379 ₹5,575.35 | 3,100 ₹5,115 | 3,680 ₹6,072 | 2,850 ₹4,702.5 Lowest |
| 2.00 | Earth work excavation for foundation with initial lead of 10m & initial lift of 2m and disposing the surplus earth away from site to the place upto a lead of 2km as directed by the Engineer in charge including all labour charges, lead, lift, T&Ps etc., complete. | 4.1 | 1 m³ (One Cubic Meter) | 234 ₹959.4 | 211 ₹865.1 | 210 ₹861 | 230 ₹943 | 200 ₹820 Lowest |
| 3.00 | Providing P.C.C. 1:4:8 using 40mm HBG metal for foundation concrete as directed by the Engineer in charge including cost of all materials, labour charges, curing, T&P, leads, lifts etc complete. | 9.2 | 1 m³ (One Cubic Meter) | 4,683 ₹43,083.6 | 4,223 ₹38,851.6 Lowest | 4,900 ₹45,080 | 4,600 ₹42,320 | 4,400 ₹40,480 |
| 4.00Providing RCC 1:1.5:3 mix using 20mm HBG stone Downgraded jelly for raft & column, as directed by the Engineer at the site including cost of all materials, labour charges, shuttering charges and making suitable arrangements for fixing of MS gate to alignment, curing, all lead, lift, etc complete. | ||||||||
| 4.01 | Raft | 0.04 | 1 m³ (One Cubic Meter) | 12,693 ₹507.72 | 11,446 ₹457.84 | 12,000 ₹480 | 12,473 ₹498.92 | 9,200 ₹368 Lowest |
| 4.02 | Column | 0.34 | 1 m³ (One Cubic Meter) | 19,938 ₹6,778.92 | 17,979 ₹6,112.86 | 20,000 ₹6,800 | 19,600 ₹6,664 | 13,400 ₹4,556 Lowest |
| 5.00 | Supplying Fabricating and placing in position of M.S/RTS Steel reinforcement rods for all RCC Works as per directed by the Engineer at the site including all cutting , binding ,tying and placing in position of fabricated rods, cost of steel, binding wire, labour charges, lead, lift, tools & plants etc complete. | 0.04 | 1 MT (One Metric Tone) | 77,772 ₹3,110.88 | 70,130 ₹2,805.2 Lowest | 81,000 ₹3,240 | 76,425 ₹3,057 | 89,000 ₹3,560 |
| 6.00 | Providing PCC 1:1.5:3 mix using 20mm HBG stone Downgraded jelly for Pedestals & Toe beam, as directed by the Engineer at the site including cost of all materials, labour charges, shuttering charges, curing, all lead, lift, etc complete. | 91.2 | 1 m³ (One Cubic Meter) | 7,871 ₹7,17,835.2 | 7,098 ₹6,47,337.6 | 7,100 ₹6,47,520 | 7,735 ₹7,05,432 | 5,850 ₹5,33,520 Lowest |
| 7.00 | Providing brick work in CM 1:4 using chamber burnt Class II clay bricks of size 9”x 41/2”x3’’ with minimum compressive strength of 50kg/cm² as directed by the Engineer in charge including cost of all materials, labour charges, curing, Lead, Lift, T&P etc., complete. | 3 | 1 m³ (One Cubic Meter) | 5,498 ₹16,494 | 4,958 ₹14,874 | 4,500 ₹13,500 Lowest | 5,400 ₹16,200 | 5,750 ₹17,250 |
| 8.00 | Plastering in CM 1:5, 12mm thick for interior surfaces of all including cost of all materials, Labour charges, curing, Lead, Lift, T&P etc., complete | 173 | 1 m² (One Square Meter) | 236 ₹40,828 | 212 ₹36,676 | 210 ₹36,330 Lowest | 232 ₹40,136 | 250 ₹43,250 |
Tender Value
Refer Docs
EMD Value
₹9,400
Closing Date
12 Aug 2025, 2:00 pmClosed
Chief Engineer / MTPS I
Office of the CE / MTPS I / Mettur Dam
MTPS I - Civil Circle Repair works to be carried out in ESP area Unit - IV on completion of R and M works by BHEL at MTPS I
2025_EB_586872_1
CE / MTPS-I / SE/ CIVIL / OT.NO.27 / 2025-26
Open Tender
Civil Works
Works
60 days
Mettur Thermal Power Station I / Mettur Dam
As per Tender Specification
2 documents required · 2 mandatory
₹0
₹9,400
Yes
17 Nov 2025
29 Jul 2025
13 Aug 2025
29 Jul 2025
12 Aug 2025
29 Jul 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .