| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.1 CrAccepted-AOC | ₹11.1 Cr | L1 | Accepted-AOC SURESH CHANDRA AGRAWAL CONTRACTOR L1
Agreement No. 01/SAC//20-21 dated 09-11-2020 |
| 2 | L2₹11.3 CrRejected-Finance | ₹11.3 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹11.3 CrRejected-Finance KHILCHIPUR | ₹11.3 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹12.2 CrRejected-Finance | ₹12.2 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹12.5 CrRejected-Finance | ₹12.5 Cr | L5 | Rejected-Finance L5 |
Tender Value
₹12.1 Cr
EMD Value
₹10 L
Closing Date
6 Aug 2020, 5:30 pmClosed
Chief Engineer
Chief Engineer Indira Sagar Project (Canals) Sanawad Distt. Khargone (M.P.)
Execution of Work for Construction of Ghat at Chichot kuti Chhipaner District Harda on Bank of Narmada River etc. As per details scope of work.
2020_NVDA_97925_1
1 /G/2020-21
Open Tender
Civil Works - Others
720 days
Harda
Please refer Tender documents.
5 documents required · 5 mandatory
₹30,000
Payable To
₹10 L
Sanawad
26 Nov 2020
14 Jul 2020
10 Aug 2020
14 Jul 2020
6 Aug 2020
14 Jul 2020
24 Jul 2020
Amount
Execution of Work for Construction of Ghat at Chichot kuti Chhipaner District Harda including provision for retaining wall, Steps and landing in RCC M 20. Pile / Open foundation, anchoring provision for necessary bank protection work, dismantling of existing Ghat where ever necessary and as directed by Engineer–in-Charge. Planning, survey and investigation, structural and architectural design and drawings, preparation the cases for obtaining all statutory clearance, supplying and fixing of all miscellaneous accessories and all other miscellaneous work requires to compete entire work including operation & maintenance of complete work for 36 months.
Execution of Work for Construction of Ghat at Chichot kuti Chhipaner District Harda including provision for retaining wall, Steps and landing in RCC M 20. Pile / Open foundation, anchoring provision for necessary bank protection work, dismantling of existing Ghat where ever necessary and as directed by Engineer–in-Charge. Planning, survey and investigation, structural and architectural design and drawings, preparation the cases for obtaining all statutory clearance, supplying and fixing of all miscellaneous accessories and all other miscellaneous work requires to compete entire work including operation & maintenance of complete work for 36 months.
BHAVANI CONSTRUCTION
Kartik Enterprises
JANAK N. PANCHAL
MOHAN LAL CONSTRUCTION
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid