Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-AOC NOT SPECIFIED | ₹1.5 L | L1 | Accepted-AOC ok |
| 2 | L2₹1.5 LRejected-AOC NOT SPECIFIED | ₹1.5 L | L2 | Rejected-AOC ok |
Tender Value
₹1.5 L
EMD Value
₹3,080
Closing Date
5 Mar 2026, 11:00 amClosed
Nidhi bhardwaj
Horticulture Hissar
Annual Mtc. Estimate of all Horticulture works of plantation developed under Urban Forest at Urban Estate, Hisar for the year 2025-2026.
2026_HBC_505446_1
202654F69A91 1C7B 4340 A3CE E73681A00915262HSV
Open Tender
Civil Works
30 days
Hisar
3 documents required · 3 mandatory
₹250
₹3,080
Yes
16 Mar 2026
26 Feb 2026
5 Mar 2026
26 Feb 2026
5 Mar 2026
26 Feb 2026
26.15.1 Maintenance of tree including fertilization, application of insecticide, watering, weeding, training, pruning, Maintenance of tree for one year for the 1st three years of age including weeding, hoeing , plant protection , watering from Deptt. source , application of 10 ml chlorpyriphos four times, 0.0289 cum FYM each,50 gm urea and 50 g DAP twice ,replacement of casualty ,disposal of debris and other activities.etc.
26.19.1 Mtc. of shrub plants for one year (One Month) including weeding, hoeing, plant protection, watering from department source, application of 10ml chloropyriphos four times in a year, 0.0289 Cum FYM each, 20gm urea and 20gm DAP twice, replacement of casuality etc. with the same species and same age of plant. (Individual shrub)
26.53 Watering of trees, shrubs, ground covers etc. through tractor tanker of 5000 litre capacity including cost of water with all leads and lifts and including cost of water, fuel ,filling of tanker, watering at site with all leads and lifts as per direction of officer - in-charge.(for 1 No. Tree 30 litres water per plant 27 no . irrigations per year , shrub 20 litres/ per plant 27 no irrigations per year , lawn 2.5 cm layer or 25 litre/sqm 50 no irrigations per year , ground cover / flower bed / rose bed 2.5 cm layer or 25 litre/sqm 40 no. irrigations per year , hedge for 2.5 cm layer or 25 litre/sqm 40 no. irrigations per year , Pot plant 3 litre water daily 250 irrigations per year.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_584170.xls
BOQ • 0.28 MB
AD0153145.pdf
Additional Documents • 8.34 MB
Download all tender documents and submit your bid