Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹11 L
EMD Value
₹11,000
Closing Date
17 Nov 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development OfficerVpthiruppathur
Block Development OfficerVpthiruppathur
DEEPENINGANDDESILTINGRECONSTRUCTIONOFSLUICE1NORECONSTRUCTIONOFWIEROFMATHAVARAYANPATTIPANCHAYATATTHUVARAMANGALAMKANMOISFNO312
2022_RDTN_262964_1
TPR/MADHAVARAYANPATTIKANMOI
Open Tender
Civil Works
Item Wise
unionofficethiruppathur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹11,000
17 Nov 2022
14 Nov 2022
17 Nov 2022
14 Nov 2022
17 Nov 2022
14 Nov 2022
Amount
Clearing Juli Flora Jungle without Uprooting, Sl no 7 Item 9D
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete Sl no:86 Item no: 1
Tank Bund and Closing Add to relevant T.N.D.S.S no.20.A, rates for new Tank bund and closing Breaches for extra watering and consolidation By power roller including Hire Charges Sl.no;71 Item no:13
Reconstruction of weir No 1
Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,
Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,SS 20b for foundation
Sand filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 mix usin 40 mm HBG metal inculding cost and coveyance of all materials to site including labour for mixing laying,curing etc complete.
Supplying,laying, jointing and fixing in position of RCC hume pipes of NP3 class of 900mm dia with suitable collars etc complete
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., Below Gl
Cement concrete 1:2:4 mix usin 20 mm HBG metal inculding cost and coveyance of all materials to site including labour for mixing laying,curing etc complete. With Vibrating
Cement concrete 1:2:4 mix usin 20 mm HBG metal inculding cost and coveyance of all materials to site including labour for mixing laying,curing etc complete. With out Vibrating
Cement concrete 1:2:4 mix usin 20 mm HBG metal inculding cost and coveyance of all materials to site including labour for mixing laying,curing etc complete. With Vibrating
Refilling with excavated earth other than sand including all charges etc complete
Reconstruction of weir
Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,SS 20b
Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls Brick / Stone Masonry in cement mortar walls below 3m high ( Sch.Item. No 14- P.No 21)
Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls Dismantling Plain Cement Concrete ( Sch.Item. No 37- P.No 22)
Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,SS 20b for foundation
Sand filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 mix usin 40 mm HBG metal inculding cost and coveyance of all materials to site including labour for mixing laying,curing etc complete.
Cement concrete 1:3:6 mix usin 40 mm HBG metal inculding cost and coveyance of all materials to site including labour for mixing laying,curing etc complete.
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., Below Gl
Cement concrete 1:2:4 mix usin 20 mm HBG metal inculding cost and coveyance of all materials to site including labour for mixing laying,curing etc complete. With Vibrating
Supplying&fabrication of steel including all labor charges etc complete
Refilling with excavated earth other than sand including all charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
RD CONSTRUCTIONS
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .