| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹42.2 L+₹1.2 L (3.01%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹40.9 L
EMD Value
₹32,000
Closing Date
23 Feb 2026, 3:00 pmClosed
O o Divisional Engineer H, CMDP Division 1 Alandur
Divisional Engineer H, CMDP Division 1 Alandur Chennai
Construction of single cell Box Culvert 2 x2 at Km 15 420 of East Coast Road at Palavakkam village in the main work of Widening the East Coast Road ECR to six lane from Km 14 550 15 700 at Palavakkam village.
2026_HWAY_656822_1
Tender notice no 32 2025-26 CMDP Div 1 JDO dt 09.02.2026
Open Tender
Civil Works - Highways
Percentage
60 days
Pallavakkam
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹32,000
Yes
22 May 2026
13 Feb 2026
24 Feb 2026
13 Feb 2026
23 Feb 2026
13 Feb 2026
Earthwork excavation in all classes of ORDINARY SOIL except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipment’s and all incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF BOX CULVERT as per section 300 of MORTH specification (V Revision) and Is 1200:1992 Part 1 (IV Revision)
Plain Cement Concrete M15 (Nominal Mix) using 40mm ISS HBG metal including Cost and Conveyance of all materials to site and cost of Cement at site including soft water, labour charges for mixing, transporting, laying compacting, curing concrete, Hire charges for Tools and plants and incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specification for LEVELLING COURSE BELOW FOUNDATION.
Vibrated Reinforced Cement Concrete M30 using graded metal including cost of shuttering and conveyance of all materials to site and cost of cement at site including cost of soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for boxes of size 2.00x 2.00 x 1.00 m with 300mm vertical walls 350mm top & 380mm bottom slabs including cost of loading and unloading the boxes at site and erection of bottom slabs and boxes at site as per specification.
Vibrated Reinforced Cement concrete in M 30 using ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for form work, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete as per relevant standard specification for CELL BOX
Supply and fabrication of Fe -500 D CRS steel required for all RCC items of works involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision for spacing bars, cover blocks and all other incidental charges etc,complete as per MORT&H Rev. V specifications No.1009,1600
Providing, laying, spreading and compacting graded stone aggregates for Granular Sub Base, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5
Providing and laying Tack Coat over Dry Lean Cement Concrete surface using 3.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5
Providing and laying Bituminous Concrete to 50mm thick using 0.22 cum of 26.5-13.20mm, 0.24 cum of 13.20-2.36mm and 0.26cum of 2.36 & below IRC HBG metal with 62.40 kgs of VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP clause 507 of MORTH.
Hire charges for providing and maintaining of Barricades of minimum 2.00 m length and 1.5m height, in the working locations of drain using ISMC 75 transom and verticals with min w.t of 7.14 kg / m in addition with L angle support of 50 x 50 x 5 mm size and covered with 3 mm thick M.S sheet of Size 2m x 1.20m including nailing to the floor, cost of fabrication, transportation, lifting, and placing, with reflective stickers of required size and placing the barricades without hindrance to the traffic, including shifting of barricades and the e barricading shall remain in the same location for minimum period of 21 days or till completion of work on the particular location. (All the barricading material shall be disposed and taken away from the site by the contractor. No additional payment shall be made for extended period of contract) etc complete.
Calculation of SubTotal, GST and Total Amount carried out by system automatically
Basic cost of value put to tender as per estimate
Add GST at 18%
Total Value put to Tender
Quoted value
Final Quoted Value
Add GST at 18% of Final Quoted Value
Total Value of Contract Including 18% of GST
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.24 MB
BOQ_787683.xls
BOQ • 0.35 MB
PriceBid.pdf
Tender Documents • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .