Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹1344.9 Cr
EMD Value
₹26.9 Cr
Closing Date
29 Jan 2027, 11:00 am
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Yes (up to 4 members)
Yes (up to 4 members)
Two Packet System
EPC [ Single Stage ]
Yes
30/11/2026 15:00
Lowest to Highest
180 days
Expenditure
Capital (Works)
PRD/CON/ER
15 conditions · 3 needing a document upload
The Bidder shall have a minimum Net Worth5(the "Financial Capacity") of 5% of the Estimated cost of this tender at the close of the preceding Financial Year. The tenderer shall not have total amount of dispute in their pending litigation more than Fifty percent (50%) of the tenderers Net Worth. The tenderer shall be examined for all pending litigation from all contracts completed or all ongoing contracts. The tenderer shall provide detailed information of all such pending litigations in the prescribed proforma given in Appendix-VIII. The details of all pending litigation shall comprise of all such Arbitration cases and also all pending Court cases irrespective of whether these litigations have been initiated by the tenderer against their Employer/ Authority/ Client or by the Client/ Employer/ Authority against the tenderer. The amount of disputes shall also comprise of all the claim amount and also all counter-claim amount in such Arbitration/ Court cases.
Technical Capacity- For demonstrating Technical Capacity and experience (the "Technical Capacity"), the Bidder shall, during the last 5 (five) previous financial years and the current financial year up to the Base month (not to be read with para-2.1.13). (i) Have received payments for construction of Eligible Project(s), or has executed construction works by itself in a PPP project, such that the sum total thereof, as further adjusted in accordance with clause 2.2.2.4 (i ) & (ii), is more than 2.5 (two and half) times the Estimated Project Cost (the "Threshold Technical Capacity"). Provided that at least one fourth of the Threshold Technical Capacity shall be from the Eligible Projects in Category 1 and/or Category 3 specified in Clause 2.2.2.4 (i) & (ii) (ii) Completed (executed) or Substantially completed$ (executed) at least one Eligible Project of Railway Sector as mentioned in clause 2.2.2.4/iii of value of not less than [50%] of the Estimated Project Cost of this tender. However, in case of Consortium/Joint Venture, the other members of Consortium/Joint Venture (who are not considered for satisfying this technical Capacity under this clause) also must have Completed (Executed) or Substantially completed$ at least one Eligible Project of Railway Sector as mentioned in clause 2.2.2.4/iii of value of not less than [10%] of the Estimated Project Cost of this tender.
(iii) (a) Completed (executed) or substantially completed$ (executed) at least one similar works of value of not less than [20%(Twenty percent)] of the estimated project cost. OR (b) Completed (executed) or substantially completed$ (executed) at least two similar works of value not less than [10% (Ten percent)] of the estimated project cost. Illustration for ,,received payments for not less than 75 (seventy-five) per cent: For contract wherein there is provision for part payment on ,,procurement of goods and equipment on basis of indemnity bond/Bank Guarantee. In all such contract, ,,received payments for not less than 75 (seventy-five) per cent value of present Contract Value payment means not less than 75% payment received under ,,procurement of goods and equipment as well as not than 75% ,execution/installation/commissioning. payment received under For avoidance of doubt, in above cl. 2.2.2.1(i), (ii) & (iii), the amount of payment received for eligible projects or amount of payments received against PPP project shall be considered for last past 5 (five) previous financial Years and current financial year up to the base month even if project was started earlier than the said reckoned period. The meaning of executed shall be considered as completed or in progress. etc. [Note:- For composite works of Newlines, Gauge Conversion, Doubling, 3rdline, 4th line with Railway electrification and/or Signaling and telecommunication works- 1. In case scope involves the electrification work as per item No. 3 of Annexure- I of Schedule -B value as mentioned in Annexure-G, the selected bidders can himself execute above Electrification work, only in case he has experience as mentioned in clause 2.2.2.1/ii above to value of estimated electrification work as mentioned in Schedule-G of draft Concession Agreement after taking approval from Authority. Otherwise selected bidder shall execute electrification work involved in project by engaging sub-contractor as per clause 3.2 of draft Concession Agreement having experience of Railway Sector works. The Railway Sector would be deemed to include overhead equipment system of Railway electrification for a railway system, metro system, suburban transit system, high speed railways, substation and transmission lines, and/or 2. In case scope involves the Signaling and Telecommunication work as per item No. 2 of Annexure-I of Schedule-B value as mentioned in Annexure-G, the selected bidders can himself execute above Signaling and Telecommunication work, only in case he has experience as mentioned in clause 2.2.2.1/ii above to value of estimated Signaling and Telecommunication work as mentioned in Schedule-G of draft Concession Agreement after taking approval from Authority. Otherwise selected bidder shall execute Signaling and Telecommunication work involved in project by engaging sub-contractor as per clause 3.2 of draft Concession Agreement having experience of Railway Sector works. The Railway Sector would be deemed to include Signaling and Telecommunication of railway system, metro system, suburban transit system, high speed railways.]
Similar nature for the work is: Any Civil Engineering work as part of New Line/Doubling/Third Line/Quadrupling involving construction of formation and bridges.
36 conditions · 11 needing a document upload
APPENDIX-VII (BID SECURITY)/EMD, (REFER Para 1.2.4 of RFP) The Bidder shall furnish as part of its Bid, a Bid Security, referred to in Clause 1.2.4 here in above through [e-payment Gateway of Authority OR in form of Bank Guarantee from a Bank as per format at Appendix VII].
ANNEXURE III TO APPENDIX IA- (FINACIAL CAPACITY OF THE BIDDER) (Refer clause 2.2.2.2, 2.2.2.8(i), 2.2.2.7(iii) of RFP) The Bidder must establish the minimum Net Worth specified in Clause 2.2.2.2 and provide details as per format at Annex-III of Appendix-IA
APPENDIX IB (LETTER COMPRISING THE FINANCIAL BID, (Para 2.1.4, 2.11 and 3.1.6 of RFP)- The Bid shall be furnished in the format exactly as per Appendix-IA & IB i.e. Technical Bid as per Appendix IA and Financial Bid as per Appendix IB and it shall be signed by the Bidder's authorized signatory. The Bidder shall first upload all the project details as mentioned in Para No. 2.11.1 of RFP document.
Uploading of NEFT FORM - NEFT Form will be uploaded with the tender offer.
Uploading of certificate by local suppliers in regard to meeting the Minimum Local Content requirement to avail benefits under Public Procurement Policy Order-2017 (A) for procurement order of value less than Rs. 10 crores: self certificate in accordance with Para- 9(a) of Public Procurement(Preference to Make inIndia) Order 2017. (B) For Procurement Order of value more than Rs. 10 crores, the certificate from Statutory auditor/cost auditor/practicing CA as the case may be in accordance withPara-9(b) of Public Procurement (Preference to Make in India)Order 2017.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Bid Security is to be paid in favour of Financial Adviser and Chief Accounts Officer/Con/ER, 14 Strand Road, 3rd floor, Kolkata700001. For more details on Bid security please refer RFP.
All documents in support of fulfilment of eligibility criteria as detailed in RFP to be submitted online at the time of tender bidding.
Tenderers shall note that the submission of other supporting documents namely Constitution of firm/JV firm, Work in hand, Arbitration/Court cases, Tools and Plants, Technical Personnel/Man Power and Association of railway Officers, at the time of on line bidding of tender, is important and they shall ensure the same. However Railways may seek clarifications/details/documents in this regard.
STUDY OF DRAWINGS AND LOCAL CONDITIONS: The drawings for the works can be seen in the office of the Chief Administrative Officer, Construction, Eastern Railway, Kolkata700001 or in the office of the concerned field Deputy Chief Engineer / Construction /II/Bhagalpur, Eastern Railway. It should be noted that these drawings are meant for general guidance only and Railway may suitably modify them during the execution of work according to the circumstances without making the Railways liable for any claims on account of such changes. If there is any variation between the description in the tender and the detailed plans, the Authority Engineer will operate the correct description and his decision is final and binding on the tenderer/ Contractor. The Tenderer/Contractor is required to inspect the sites of works and acquaint himself with the site conditions, availability of approaches for transporting of men and materials, space and other factors relating to the works, availability of labour, electricity and water, etc., before quoting his rates. The extent of lead and lift involved in the execution of works and any difficulties involved in the execution of work should also be examined before formulating the rates for complete items of works described in the schedule. The Tender submitted will be deemed to have been made after such inspection.
CORRIGENDUM NOTICE ON IREPS: [I]Railway may modify the tender document by issuing online corrigendum through "www.ireps.gov.in" 15 days prior to the tender closing date. For the purpose of CORRIGENDUM in the tender, NIT period is splitted as under: (a) ADVERTISEMENT PERIOD: The time during which all information pertaining to tender shall be available but offers cannot be submitted (b) OFFER SUBMISSION PERIOD: 15 days prior to closing of tender, during which tenderers can submit their offer.
Applicable for the tenders with eligibility criteria: The offer of Bidder(s) who do not enclose Work Experience Certificate & Financial eligibility Certificate with requisite details, and supporting documents along with their Tender to establish their credentials shall be summarily rejected, even though they are working contractors or contractors on approved list.
The offer shall be evaluated only on the basis of the certificates/documents submitted along with the tender offer.
Any Certificate /Documents offered / submitted / received after the tender opening shall not be given any credit and shall not be considered.
Railway reserves the right to verify the authenticity of the documents/information furnished.
Tenderer(s) shall note that conditional/alternate offer will not be considered and will summarily be rejected, even though such condition makes them as the lowest tenderer.
Before submitting the offer, Bidders are advised to carefully read the RFP document, EPC agreement and other documents attached with the NIT. In case of any discrepancy / contradiction between NIT with RFP Document then RFP Document will prevail.
The Pre-bid meetings will be held in Hybrid mode i.e. in person and Video Conference (VC) on 30.11.2026 at 15:00 Hrs. The link of pre-bid meeting for joining through Video Conference (VC) is: https://calendar.app.google/KGYxDnRLZf2UMfs87
KML file for the Alignment can be accessed on following link: https://drive.google.com/file/d/1Lo5hc7iFv6ICetpbfPkccCYIuAPyZ3jJ/view?usp=sharing
Bhagalpur-Dumka Doubling Project: Execution of Civil, P-Way, Electrification, Signal and Telecom Works for Construction of Doubling between Bhagalpur Jn. (Excl.) and Dumka Jn. (Excl.) from Km 1.600 to Km 114.500 in connection with Bhagalpur-Dumka-Rampurhat Doubling Project of Eastern Railway
EPC-05-CAO-C-ER-2026~ER
EPC-05-CAO-C-ER-2026
Open
Works - General
910 Days
Kolkata, West Bengal
₹0
₹26.9 Cr
30 Sept 2026
30 Sept 2026
15 Jan 2027
30 Nov 2026
332 items across 8 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 11,03,97,23,183 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
E.IHUTdrg.pdf
ATTACHMENT
STATIONBUILDINGDrawingSample.pdf
ATTACHMENT
STNBLDGDRGForHALTStation.pdf
ATTACHMENT
ATWeld_Manual-2022.pdf
ATTACHMENT
ConcreteBridgeCode_compressed.pdf
ATTACHMENT
FBWManual-Reprint2022-IncorporateduptoCS4.pdf
ATTACHMENT
FoundationSubstructureCode.pdf
ATTACHMENT
INDIANRAILWAYSTRACKMACHINEMANUALINCORPORATEDUPTOACS10.pdf
ATTACHMENT
IRPWM2024CorrectedUpToACS-1126-02-2026.pdf
ATTACHMENT
IRSTMManual2ndedition-1.pdf
ATTACHMENT
MANUALFORULTRASONICTESTINGOFRAILSANDWELDS.pdf
ATTACHMENT
PileWellfoundation_Manual.pdf
ATTACHMENT
SBCIncorporatedUptoACS24.pdf
ATTACHMENT
seismic_code_incorporated_acs_2.pdf
ATTACHMENT
SUBSTRUCTUREANDFOUNDATIONCODE..pdf
ATTACHMENT
WeldedBridgeCode.pdf
ATTACHMENT
singedlettertoallrailway.pdf
ATTACHMENT
SPlayout1.pdf
ATTACHMENT
SpecificationofElectricalGeneralBGPDumka__signed1.pdf
ATTACHMENT
SSPLayout2.pdf
ATTACHMENT
1.CableCorragePlan_MBB.PDF
ATTACHMENT
2.RCCDUCTS-RevisedDrawingswithLAngleinplaceofCChannel30-06-2025_compressed.pdf
ATTACHMENT
3.TC-108CableRouteMarker.pdf
ATTACHMENT
4.TC129.pdf
ATTACHMENT
5.TC-110connectivityUFSBIBPAC.pdf
ATTACHMENT
6.TechnicalCircularNo.113ER.pdf
ATTACHMENT
7..Technicalcircular112STcablelaying.pdf
ATTACHMENT
8..Technicalcircular124RequirementofOFCcablesformodernsignalling.pdf
ATTACHMENT
9.ER-Technicalcircular107quadjoints.pdf
ATTACHMENT
10..PolicyforVitalFunctionalBitsofEI.superseedssl.no.155.pdf
ATTACHMENT
11.ImplementationofSMPSBASEDINTEGRATEDPOWERSUPPLYIPSasperthelatestRDSOGuidelinedated230625.pdf
ATTACHMENT
12.PCSTEQualityChecklistAtoZ30-09-2024Signed.pdf
ATTACHMENT
13.PlacementofLVboxesdt6.5.25.pdf
ATTACHMENT
14.SizeProvisionofDualVDUforEI-PolicyDirectivesPCSTE.pdf
ATTACHMENT
15.ProvisionofkavachreadyinterfacesinEI_compressed.pdf
ATTACHMENT
16.RevisionofTypicaldiagramEarthElectrodewithletterdt28.3.25typ0097.pdf
ATTACHMENT
17.SerialNumberMarkingofGluedJointinTrackBondingPlans..pdf
ATTACHMENT
18.Compulsorytestingofcables_compressed1.pdf
ATTACHMENT
19.RelayRoomDoorclosurethroughDataloggerRlyBdslettersDated16.10.18.pdf
ATTACHMENT
20.STBuildingsPolicyMerged.pdf
ATTACHMENT
21.RCCDUCTS-RevisedDrawingswithLAngleinplaceofCChannel30-06-2025_compressed.pdf
ATTACHMENT
22.TypicalPowersupplydiagramofVDUforEIInstallation_compressed1.pdf
ATTACHMENT
23.REVISEDBUILDINGPLANL.C.GATES_24.01.25.pdf
ATTACHMENT
24.NewEarthPipeDrawingGIPipeTYP0097dt28.3.25.pdf
ATTACHMENT
25.MandatorypriorapprovalforundertakingNI.pdf
ATTACHMENT
26.Dataloggerlogicforgenerationofsingleexceptionforonesystemfailureindual.pdf
ATTACHMENT
27.STS_E_TAN_7010_Ver2dated06062026withlettersigned.pdf
ATTACHMENT
28.TAN3012VER518.6.2026_compressed.pdf
ATTACHMENT
29..T.C.118UseofFRPbasedTLJBinsteadofMetalTLJBdated8.8.24.pdf
ATTACHMENT
30.TC101UseofUniversalPlugintypetractivearmatureAClampprovingrelayM-Cfor110vACLEDSignalLampsRoute.pdf
ATTACHMENT
31.TechnicalCircular124AModifiedregardingPolicyoflayingofOFCcablesforSTworks.pdf
ATTACHMENT
32.VerificationCheckingSTDrg.-IRSTELO.pdf
ATTACHMENT
34.2026-04-28-TechnicalAdvisoryNote3007ver2.pdf
ATTACHMENT
EPCSTScopeofwork.pdf
ATTACHMENT
ScopeofOHEworkBGPDumkaSigned.pdf
ATTACHMENT
30-2011BRNO.PLAQUE.pdf
ATTACHMENT
140-2012Retainingwall.pdf
ATTACHMENT
157-2013FM.pdf
ATTACHMENT
287-2010OHT.pdf
ATTACHMENT
288-2010OHT.pdf
ATTACHMENT
573-2015OHEMASTFORRCCBOXBR.pdf
ATTACHMENT
573-2015OHEMASTFORRCCBOXBR_1.pdf
ATTACHMENT
795-2011INSPECTIONPF.pdf
ATTACHMENT
809-2012WINGWALL.pdf
ATTACHMENT
938-2016_1FOBRAMP.pdf
ATTACHMENT
938-2016_2IFOBRAMP.pdf
ATTACHMENT
1410SIGNAGEGUIDELINES.pdf
ATTACHMENT
262410455.pdf
ATTACHMENT
A-191-2019BUFFER.pdf
ATTACHMENT
A-239-2001GentsUrinalatStn..pdf
ATTACHMENT
A-325-2000UTSBOOKINGCOUNTER.pdf
ATTACHMENT
A-356-2007DRINKINGWATERTAP.pdf
ATTACHMENT
A-357-2007SEPTICTANK.pdf
ATTACHMENT
A-500-2001BOUNDARYWALLPRECAST.pdf
ATTACHMENT
BS-41R111.pdf
ATTACHMENT
C-224-2004DRAINAGEATSTATION.pdf
ATTACHMENT
C-508-2016ALT-1COPINGOVERR.WALL.pdf
ATTACHMENT
CAOCONDRGNO54-20121.pdf
ATTACHMENT
CopyofTypicalsketchTrolleyrefugeonformation.pdf
ATTACHMENT
D-281-1991SandHump.pdf
ATTACHMENT
D-369-2004TIEBARFENCING.pdf
ATTACHMENT
DivyangjanAmenitiesRBletter26.08.2025.pdf
ATTACHMENT
GANGHUT_compressed.pdf
ATTACHMENT
GER-50Revision-2Transitionsystem..pdf
ATTACHMENT
HeightgaugeforROB.pdf
ATTACHMENT
IRS_Bridge_Rule_updateduptoACS_53.pdf
ATTACHMENT
IRS_B1_updateduptoACS-13.pdf
ATTACHMENT
IRST19.pdf
ATTACHMENT
PolicyforInspectionofP.waymaterials.pdf
ATTACHMENT
ProjectmonitoringbyusingAGReferredUASDroneletterdt.25.08.2023.pdf
ATTACHMENT
RailhandlingguidelinesCT35Feb2023.pdf
ATTACHMENT
RailwayRulesforOpening.pdf
ATTACHMENT
RDSO2020GEIRS-00041-111.pdf
ATTACHMENT
RDSO2020GEIRS-0004112-222.pdf
ATTACHMENT
ScopeofElectricalGenlworkBGPdumkasinged_.pdf
ATTACHMENT
seismic_code_incorporated_acs_2_1.pdf
ATTACHMENT
SpecificationsforTrackBallastuptoACS-1.pdf
ATTACHMENT
STANDARDSIGNAGESATSTATIONSONINDIANRAILWAYSApril2023.pdf
ATTACHMENT
ThirdPartyInspection-Process.pdf
ATTACHMENT
TracksideIndicatorBoardsAndSignages.pdf
ATTACHMENT
TypicalBallastprofiledrawing1.pdf
ATTACHMENT
TypicalsketchTrolleyrefugeonformation.pdf
ATTACHMENT
USFDManual1.pdf
ATTACHMENT
Utilitiesatplatformdrg.pdf
ATTACHMENT
WeldedBridgeCode_1.pdf
ATTACHMENT
WKS-G-1BLDGFINISHINGGUIDELINES.pdf
ATTACHMENT
BRIDGENO_153_25T_SPAN_18.3MCOMPOSITEGIRDER_28.09.2026.pdf
ATTACHMENT
BRIDGENO-75_2X30.5MOWG25.09.20261.pdf
ATTACHMENT
BRIDGENO-131_5X30.5MOWG28.09.20261.pdf
ATTACHMENT
L.C.NO.N-16C-newbridge61A03.09.20262.pdf
ATTACHMENT
L.C.NO.N-31C.pdf
ATTACHMENT
ROBINDICATIVEGADATLC-36.pdf
ATTACHMENT
TYPNewLHSinPlaceofLC.pdf
ATTACHMENT
TYP.LHSExtension.pdf
ATTACHMENT
TYP.MajorBridgeNo.6.pdf
ATTACHMENT
TYP.MajorBridgeNo.30.pdf
ATTACHMENT
TYP.SKETCHOFBRSPAN12.20mCG.pdf
ATTACHMENT
TYPICALBOXROBDATE-24-09-20261.pdf
ATTACHMENT
TYPICALBOXRUB.pdf
ATTACHMENT
TypicalSketch1X18.3mCOMPOSITEGIRDER.pdf
ATTACHMENT
TYPICALSKETCHFOR30.5mOWGcomposite.pdf
ATTACHMENT
TYPICALSKETCHOF2X6.10mPSCSLAB.pdf
ATTACHMENT
TYPICALSKETCHOF9.15mSPAN.pdf
ATTACHMENT
L-SHEET-1FROMKM-0.000TO5.000.pdf
ATTACHMENT
L-SHEET-2FROMKM-5.000TO10.000.pdf
ATTACHMENT
L-SHEET-3FROMKM-10.000TO15.000.pdf
ATTACHMENT
L-SHEET-4FROMKM-15.000TO20.000.pdf
ATTACHMENT
L-SHEET-5FROMKM-20.000TO25.000.pdf
ATTACHMENT
L-SHEET-6FROMKM-25.000TO30.000.pdf
ATTACHMENT
L-SHEET-7FROMKM-30.000TO35.000.pdf
ATTACHMENT
L-SHEET-8FROMKM-35.000TO40.000.pdf
ATTACHMENT
L-SHEET-9FROMKM-40.000TO45.000.pdf
ATTACHMENT
L-SHEET-10FROMKM-45.000TO50.000.pdf
ATTACHMENT
L-SHEET-11FROMKM-50.000TO55.000.pdf
ATTACHMENT
L-SHEET-12FROMKM-55.000TO60.000.pdf
ATTACHMENT
L-Sheet-13FROMKM-60.000TO65.000.pdf
ATTACHMENT
L-Sheet-14FROMKM-65.000TO70.000.pdf
ATTACHMENT
L-SHEET-15FROMKM-70.000TO75.000.pdf
ATTACHMENT
L-SHEET-16FROMKM-75.000TO80.000.pdf
ATTACHMENT
L-Sheet-17FROMKM-80.000TO85.000.pdf
ATTACHMENT
L-Sheet-18FROMKM-85.000TO90.000.pdf
ATTACHMENT
L-Sheet-19FROMKM-90.000TO95.000.pdf
ATTACHMENT
L-Sheet-20FROMKM-95.000TO100.000.pdf
ATTACHMENT
L-Sheet-21FROMKM-100.000TO105.000.pdf
ATTACHMENT
L-Sheet-22FROMKM-105.000TO110.000.pdf
ATTACHMENT
L-Sheet-23FROMKM-110.000TO115.000_compressed.pdf
ATTACHMENT
1.TentativeESPofKoiliKhutahaHalt.pdf
ATTACHMENT
2.TentativeESPofGonudham.pdf
ATTACHMENT
3.TentativeESPofHatpurainiHalt.pdf
ATTACHMENT
4.TentativeESPofJagdishpurHalt.pdf
ATTACHMENT
5.TentativeESPofTikani.pdf
ATTACHMENT
6.TentativeESPofSanjha.pdf
ATTACHMENT
7.TentativeESPofBela.pdf
ATTACHMENT
8.TentativeESPofDhauni.pdf
ATTACHMENT
9.TentativeESPofPiparadihHalt.pdf
ATTACHMENT
10.TentativeESPofPunsiaHalt.pdf
ATTACHMENT
11.TentativeESPofBARAHAT.pdf
ATTACHMENT
12.TentativeESPofPANJWARAROAD.pdf
ATTACHMENT
13.TentativeESPofMandarVidyapithHalt.pdf
ATTACHMENT
14.TentativeESPofMANDARHILL.pdf
ATTACHMENT
15.TentativeESPofPandetolaHalt.pdf
ATTACHMENT
16.TentativeESPofDanre.pdf
ATTACHMENT
17.TentativeESPofKUMRADOLIBP.pdf
ATTACHMENT
18.TentativeESPofKURMAHAT.pdf
ATTACHMENT
19.TentativeESPofNONIHATBHATURIA.pdf
ATTACHMENT
20.TentativeESPofBARAPLASI.pdf
ATTACHMENT
21.TentativeESPofNEWMADANPUR.pdf
ATTACHMENT
DRAFT-SIPOFDHAUNI.pdf
ATTACHMENT
DRAFTSIPOFTIKANI.pdf
ATTACHMENT
DRAFTSIPOFBARAHAT.pdf
ATTACHMENT
DRAFTSIPOFMANDARHILL.pdf
ATTACHMENT
DRAFTSIPOFPANJWARA.pdf
ATTACHMENT
OHEguidelinessignedandapproved_compressed.pdf
ATTACHMENT
Singed2x25kvemploymentschedule18sheetswith5_spanreduction_compressed1.pdf
ATTACHMENT
GER-50Revision-2202411_compressed1.pdf
ATTACHMENT
145-1999TrollyRefuseOHEMastFoundation1_compressed3.pdf
ATTACHMENT
RFPFinal-Bhagalpur-Dumka.pdf
ATTACHMENT
BGP-DUMKAEPCDocUMENTDRAFT.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .