Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 CrAdmitted-Finance A 99 SECTOR 4 AIROLI NAVI MUMBAI 400708 | NAVI MUMBAI | THANE | MAHARASHTRA | 400708 | ₹2.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.2 Cr+₹30.3 L (10.4%)Admitted-Finance 11TH FLOOR ECO CENTRE BUSINESS TOWER P NO 4 EM BLOCK SECTOR V KOLKATA 91 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | ₹3.2 Cr+₹30.3 L (10.4%) | L2 | Admitted-Finance |
| 3 | L3₹3.4 Cr+₹47.3 L (16.2%)Admitted-Finance | ₹3.4 Cr+₹47.3 L (16.2%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically disqualified |
| 5 | Rejected-Technical 10TH FLOOR UNIT 2 TECHNIPLEX 2 VEER SAVARKAR FLYOVER S V ROAD GOREGOAN WEST MUMBAI 400 062 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400062 | - | - | Rejected-Technical Technically disqualified |
| Sl No | Description | Qty | Unit | Aqua Cool Co. Pvt.Ltd. L1 | Bluestar Limited L2 | Indepth solutions L3 |
|---|---|---|---|---|---|---|
| 1.00Summary of SITC with buyback and CMC of 5 years | ||||||
| 1.10 | SITC and buyback | 1 | Nos | 90,10,786 ₹90,10,786 Lowest | 1,06,45,310 ₹1,06,45,310 | 95,86,536.53 ₹95,86,536.53 |
| 1.20 | CMC for 5 years | 1 | Nos | 55,49,986 ₹55,49,986 | 54,29,507 ₹54,29,507 Lowest | 73,38,785.69 ₹73,38,785.69 |
Tender Value
₹2.1 Cr
EMD Value
₹4.2 L
Closing Date
11 Jan 2023, 6:55 pmClosed
CE, TMC on behalf of Director, TMC
Engineering Department, 6th Floor, Service Block, TMH, Parel
Replacement of old Window Split ACs and Cassette AC in TMH Complex
2022_TMC_730390_1
TMC/ENG/MECH/Repl/AC/22-23/37
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
180 days
TMH, Parel
As per tender documents
6 documents required · 6 mandatory
₹0
₹4.2 L
Yes
TMH, Parel
3 May 2023
20 Dec 2022
13 Jan 2023
20 Dec 2022
11 Jan 2023
4 Jan 2023
20 Dec 2022 - 29 Dec 2022
30 Dec 2022
Amount
Summary of SITC with buyback and CMC of 5 years
SITC and buyback
CMC for 5 years
Description of Work / Item(s)
Amount
Cat (A) -Items to be supply and installation
Hi-wall split air conditioners Supply, Installation, testing and commissioning of Air-cooled Hi-wall split air conditioners including 3 mtr standard copper piping, cabling, drain piping -100% Copper coil condenser & evaporator,3Star rating-1 TR
Supply, Installation, testing and commissioning of Air-cooled Hi-wall split air conditioners including 3 mtr standard copper piping, cabling, drain piping -100% Copper coil condenser & evaporator,3Star rating-1.5TR
Supply, Installation, testing and commissioning of Air-cooled Hi-wall split air conditionersincluding 3 mtr standard copper piping, cabling, drain piping-100% Copper coil condenser & evaporator,3Star rating-2TR
Window air conditioners Supply, Installation, testing and commissioning of Window air conditioners including standard cabling & drain piping-100% Copper coil condenser & evaporator,3Star rating-1.5TR
Supply, Installation, testing and commissioning of Window air conditioners standard cabling & drain piping-100% Copper coil condenser & evaporator,3Star rating-2TR
Supply, Installation, testing and commissioning of Cassete air conditioners--100% Copper coil condenser & evaporator-4TR
Supply, Installation, testing and commissioning of Tower air conditioners-100% Copper coil condenser & evaporator,4TR
Removing of WAC,Split AC & Cassete AC of various capacity from 1 TR to 4TR(Window AC-1TR-1No,1.5TR-59 Nos, Split AC-1TR-4No,1.5TR-28Nos,2TR-86Nos,Casstte AC 3TR-12Nos,4TR-3Nos)
Supply and installation of Refrigerent copper piping with 13mm "O" class factory backed nitrile rubber with aluminium foil from outdoor unit to indoor unit complete with insulation- 5/8
Supply and installation of Refrigerent copper piping with 13mm "O" class factory backed nitrile rubber with aluminium foil from outdoor unit to indoor unit complete with insulation -1/4
Supply and installation of Refrigerent copper piping with with 13mm "O" class factory backed nitrile rubber with aluminium foil from outdoor unit to indoor unit complete with insulation-3/4
Supply and installation of Refrigerent copper piping with with 13mm "O" class factory backed nitrile rubber with aluminium foil from outdoor unit to indoor unit complete with insulation -3/8
Supply and installation of Cable Supply and installation of Flexible Cable 4CX2.5mm2,CU
Supply and installation of Drain Line-25mm With Insulation
Supply and installation of Drain Line-32mm With Insulation
Supply and installation of L type MS Stand(1 set=2 nos)
Supply and installation of Floor Mounting stand(3ftx1.5ft)
Supply and installation of MS stand for split AC outdoor unit made up of M.S.channel,Catwalk-4ftx2ft
Cat (B) - Buy Back Items
Buy-Back (ie minus)Amount of SPLIT AC-1TR
Buy-Back (ie minus) Amount of SPLIT AC-1.5TR
Buy-Back (ie minus) Amount of SPLIT AC-2TR
Buy-Back (ie minus) Amount of Window AC-1TR
Buy-Back (ie minus) Amount of Window AC-1.5TR
Buy-Back (ie minus) Amount of CASSETE AC-3TR
Buy-Back (ie minus) Amount of CASSETE AC-4TR
Description of Work / Item(s)
Amount
CMC for 5 years
Comprehensive maintenance contract (1st Year) 1.5TR Window ACS
Comprehensive maintenance contract (1st Year) 2.0TR Window ACS
Comprehensive maintenance contract (1st Year) 1.0TR Split AC
Comprehensive maintenance contract (1st Year) 1.5TR Split ACS
Comprehensive maintenance contract (1st Year) 2.0TR Split ACS
Comprehensive maintenance contract (1st Year) 4.0TR Cassette ACS.
Comprehensive maintenance contract (1st Year) 4.0TR Tower ACS
Comprehensive maintenance contract (2nd Year) 1.5TR Window ACS
Comprehensive maintenance contract (2nd Year) 2.0TR Window ACS
Comprehensive maintenance contract (2nd Year) 1.0TR Split AC
Comprehensive maintenance contract (2nd Year) 1.5TR Split ACS
Comprehensive maintenance contract (2nd Year) 2.0TR Split ACS
Comprehensive maintenance contract (2nd Year) 4.0TR Cassette ACS.
Comprehensive maintenance contract (2nd Year) 4.0TR Tower ACS
Comprehensive maintenance contract (3rd Year) 1.5TR Window ACS
Comprehensive maintenance contract (3rd Year) 2.0TR Window ACS
Comprehensive maintenance contract (3rd Year) 1.0TR Split AC
Comprehensive maintenance contract (3rd Year) 1.5TR Split ACS
Comprehensive maintenance contract (3rd Year) 2.0TR Split ACS
Comprehensive maintenance contract (3rd Year) 4.0TR Cassette ACS.
Comprehensive maintenance contract (3rd Year) 4.0TR Tower ACS
Comprehensive maintenance contract (4th Year) 1.5TR Window ACS
Comprehensive maintenance contract (4th Year) 2.0TR Window ACS
Comprehensive maintenance contract (4th Year) 1.0TR Split AC
Comprehensive maintenance contract (4th Year) 1.5TR Split ACS
Comprehensive maintenance contract (4th Year) 2.0TR Split ACS
Comprehensive maintenance contract (4th Year) 4.0TR Cassette ACS.
Comprehensive maintenance contract (4th Year) 4.0TR Tower ACS
Comprehensive maintenance contract (5th Year) 1.5TR Window ACS
Comprehensive maintenance contract (5th Year) 2.0TR Window ACS
Comprehensive maintenance contract (5th Year) 1.0TR Split AC
Comprehensive maintenance contract (5th Year) 1.5TR Split ACS
Comprehensive maintenance contract (5th Year) 2.0TR Split ACS
Comprehensive maintenance contract (5th Year) 4.0TR Cassette ACS.
Comprehensive maintenance contract (5th Year) 4.0TR Tower ACS
Bluestar Limited
Indepth solutions
Indepth solutions
Bluestar Limited
Aqua Cool Co. Pvt.Ltd.
Indepth solutions
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.10 MB
techspecs.pdf
Tender Documents • 0.41 MB
BOQ_768092.xls
BOQ • 0.35 MB
techdocumentchecklist.xls
Tender Documents • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .