| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 LAdmitted-Finance | -37.00% | ₹1.2 L | L1 | Admitted-Finance |
| 2 | L2₹1.3 L+₹5,876.54 (4.73%)Admitted-Finance | -34.02% | ₹1.3 L+₹5,876.54 (4.73%) | L2 | Admitted-Finance |
| 3 | L3₹1.5 L+₹23,648.06 (19.0%)Admitted-Finance | -25.00% | ₹1.5 L+₹23,648.06 (19.0%) | L3 | Admitted-Finance |
| 4 | L4₹1.5 L+₹23,845.13 (19.2%)Admitted-Finance NA | -24.90% | ₹1.5 L+₹23,845.13 (19.2%) | L4 | Admitted-Finance |
| 5 | L5₹1.5 L+₹25,618.73 (20.6%)Admitted-Finance | -24.00% | ₹1.5 L+₹25,618.73 (20.6%) | L5 | Admitted-Finance |
Tender Value
₹2.0 L
EMD Value
₹3,940
Closing Date
31 Aug 2026, 6:00 pmClosed
Executive Engineer, REW Jammu
Office of the Executive Engineer, REW Jammu
Construction of Lane with tile work moh. Rakesh Kumar near Yash Pal Shop and Lane near Rampal s/o Mani Ram at w no 5, Pyt. Dhok khalsa, Block Bhalwal Brahmana under PRI Distt. capex budget for the year 2026-27 (Block Level)
2026_RDPR_322054_20
e-NIT No. 487 REWJ of 2026-27 dated 24-08-2026
Open Tender
Civil Works
Percentage
30 days
Jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹3,940
11 Sept 2026
24 Aug 2026
1 Sept 2026
24 Aug 2026
31 Aug 2026
24 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed: All kinds of soil : | 3.6 | cum | 479.3 | ₹1,725.48 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 8 | cum | 4,826.5 | ₹38,612 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 4.98 | cum | 5,733.6 | ₹28,553.33 |
| 4 | supply of stone | 1.62 | cum | 800 | ₹1,296 |
| 5 | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine
with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge. | 144.4 | sqm | 816.15 | ₹1,17,852.06 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for: | 12 | sqm | 286.35 | ₹3,436.2 |
| 7 | Carriages of material by MT Sand 7 km | 3.72 | cum | 232.06 | ₹863.26 |
| 8 | Carriages of material by MT Agg 7 km | 7.45 | cum | 232.06 | ₹1,728.85 |
| 9 | Add for CIB | 1 | no | 3,000 | ₹3,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
BOQ_1077412.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .