Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹78,500.78Admitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹89,073.94+₹10,573.17 (13.5%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹89,772.17+₹11,271.40 (14.4%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹98,749.39+₹20,248.61 (25.8%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹99,746
EMD Value
₹2,992
Closing Date
29 May 2026, 6:00 pmClosed
EX ENGINEER REW KULGAM
EX ENGINEER REW KULGAM
CONSTRUCTION OF XING AND DESILTING AT IRRIGATION CHANNEL AT NAIDPORA NEAR GRAVEYARD AT TARIGAM
2026_RDPR_310621_1
e- NIT No. 03 OF REWK/RETD/2026-27 Dated 22-05-2026
Open Tender
Civil Works
Percentage
30 days
KULGAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹250
EX ENGINEER REW KULGAM
₹2,992
4 Jun 2026
22 May 2026
30 May 2026
22 May 2026
29 May 2026
22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site clearance by way of cutting down of trees, bushes ,removal of tree trunks etc incl. disp.of rubbish | 6 | no | - | - |
| 2 | Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) . Wet | 14.4 | Cum | 1 | ₹14.39 |
| 3 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil. | 7.92 | Cum | - | - |
| 4 | P / L dry stone solling handpacked in foundations and with 20% Plums including all carriages. | 2.16 | cum | - | - |
| 5 | Providing & laying in position cement concrete of specified grade excluding the cost of centring and shuttering all work upto plinth level(1:2:4 coarse sand 20 mm nominal size stone agg.) including carraige loading unloading. | 5.28 | cum | - | - |
| 6 | Providing & laying in position reinforced cement concrete of specified grade excluding the cost of centring and shuttering all work upto plinth level(1:2:4 coarse sand 20 mm nominal size stone agg.) including carraige loading unloading. | 2.6 | cum | - | - |
| 7 | Reinforcement for RCC work incld straightning, cutting, bending, placing in position & binding all complete (Thermo-mechanically treated bars) | 207.9 | Kg | 1 | ₹207.69 |
| 8 | Centring and shuttering incld. Strutting, proping etc & removal of form work . Foundations, footings, bases of columns etc. for mass concrete. | 13.2 | Sqm | - | - |
| 9 | Centring and shuttering incld. Strutting, proping etc & removal of form work . Slab | 4.95 | Sqm | - | - |
| 10 | Photograph /signboard charges(2.5X2.5)size | 1 | job | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
BOQ_1004634.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .