Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 1 BHIKAIJI CAMA PLACE ENGINEERS INDIA BHAVAN NEW DELHI 110066 INDIA | NEW DELHI | NEW DELHI | DELHI | 110066 | Admitted-Finance |
| 3 | Admitted-Finance D 36 SECTOR 6 NOIDA GAUTAM BUDDHA NAGAR UTTAR PRADESH 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Rejected-Technical A 21 BEHIND LIONS CLUB SCHOOL III PHASE THIRU VI KA INDUSTRIAL ESTATE GUINDY CHENNAI 600 032 | CHENNAI | TAMIL NADU | 600001 | Rejected-Technical Technically not Acceptable |
Tender Value
Refer Docs
Closing Date
18 Jan 2021, 2:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DGM (PJ CONTARCTS)
Deputy General Manager (PJ-Contracts) Indian Oil Corporation Limited (Pipelines Division) A-1, Udyog Marg, Sector-1, NOIDA (UP) 201 301, INDIA
EIA and RA study for SMPL-AUG crude oil pipeline to meet additional crude oil requirement for Koyali refinery project
2020_PLHO_129354_1
PLCC/SMPL-AUG/SURVEY/MON/20088
Limited
Services
Works
480 days
In state of India
As per tender terms and conditons
4 documents required · 4 mandatory
Exempted
8 Feb 2021
31 Dec 2020
19 Jan 2021
31 Dec 2020
18 Jan 2021
7 Jan 2021
120 days
Amount
EIA & RA study SMPL Aug J 18 SV section
Carrying out Environment Impact Assessment (EIA) & Risk Analysis (RA) study to assess probable impact on environment/risk due to the project & suggest required mitigation measures, If any, for obtaining the required clearances from State Pollution Control Board/ MoEF&CC, GoI for the project of "Augmentation of Salaya-Mathura Crude Oil Pipeline System to meet additional crude oil requirement for Koyali Refinery-SV Section" in adherence to the EIA Notification, 2006 & subsequent amendments (Draft EIA notification 2020) made by MoEF &CC, Govt. of India. Carrying out Environment Impact Assessment (EIA) study to establish present environmental parameters in & around the pipeline station facilities in 15 km radius under the subject project of "Augmentation of Salaya-Mathura Crude Oil Pipeline System to meet additional crude oil requirement for Koyali Refinery". Identifying & evaluating potential environmental impacts that are consequent to the project facilities, carrying out consequence analysis of release of hydro-carbon to water-bodies etc. and recommend necessary mitigation measures, prepare EIA report covering all the relevant data on air, water, noise, land-use, temperature, available facilities, surrounding industries, place of historical importance, marine life, flora & fauna, water bodies, coastal areas, occupation, health, etc. of neighboring people etc. in accordance with the regulations of the concerned State PCB's, Notification of MoEF&CC, GoI as mentioned above and prepare an Environment Management Plan(EMP). Identification of Eco-sensitive area falling under the project, if any, shall also be included under this study. Carrying out Risk Analysis (RA) study for the proposed facilities envisaged under the project of "Augmentation of Salaya-Mathura Crude Oil Pipeline System to meet additional crude oil requirement for Koyali Refinery" taking into account the proposed facilities and existing facilities in its surroundings, study done should identify the potential hazards, assess the impact of all probable accidental hazards and mitigation measures to reduce hazards of all the facilities, prepare RA report with mitigation measures & Disaster Management Plan(DMP). Risk analysis study shall comprise of, but not limited to: -Identification of risks by HAZOP/FETI approaches -Hazard analysis/damage model studies for the facilities, radiation effects etc. -Maximum Credible Accident Analysis bringing out type of fire hazards from the facilities, past accident analysis, risk factors, societal risk, Domino effects etc. -Observation of risk assessment study / recommendations. -Preparation & submission of ON SITE EMERGENCY PLAN / DISASTER MANAGEMENT PLAN (DMP) for the subject pipeline, based on Risk Analysis and assessment.
EIA & RA study SMPL Aug J 18 VK section
Carrying out Environment Impact Assessment (EIA) & Risk Analysis (RA) study to assess probable impact on environment/risk due to the project & suggest required mitigation measures, If any, for obtaining the required clearances from State Pollution Control Board/ MoEF&CC, GoI for the project of "Augmentation of Salaya-Mathura Crude Oil Pipeline System to meet additional crude oil requirement for Koyali Refinery-VK Section" in adherence to the EIA Notification, 2006 & subsequent amendments (Draft EIA notification 2020) made by MoEF &CC, Govt. of India. Carrying out Environment Impact Assessment (EIA) study to establish present environmental parameters in & around the pipeline station facilities in 15 km radius under the subject project of "Augmentation of Salaya-Mathura Crude Oil Pipeline System to meet additional crude oil requirement for Koyali Refinery". Identifying & evaluating potential environmental impacts that are consequent to the project facilities, carrying out consequence analysis of release of hydro-carbon to water-bodies etc. and recommend necessary mitigation measures, prepare EIA report covering all the relevant data on air, water, noise, land-use, temperature, available facilities, surrounding industries, place of historical importance, marine life, flora & fauna, water bodies, coastal areas, occupation, health, etc. of neighboring people etc. in accordance with the regulations of the concerned State PCB's, Notification of MoEF&CC, GoI as mentioned above and prepare an Environment Management Plan(EMP). Identification of Eco-sensitive area falling under the project, if any, shall also be included under this study. Carrying out Risk Analysis (RA) study for the proposed facilities envisaged under the project of "Augmentation of Salaya-Mathura Crude Oil Pipeline System to meet additional crude oil requirement for Koyali Refinery" taking into account the proposed facilities and existing facilities in its surroundings, study done should identify the potential hazards, assess the impact of all probable accidental hazards and mitigation measures to reduce hazards of all the facilities, prepare RA report with mitigation measures & Disaster Management Plan(DMP). Risk analysis study shall comprise of, but not limited to: -Identification of risks by HAZOP/FETI approaches -Hazard analysis/damage model studies for the facilities, radiation effects etc. -Maximum Credible Accident Analysis bringing out type of fire hazards from the facilities, past accident analysis, risk factors, societal risk, Domino effects etc. -Observation of risk assessment study / recommendations. -Preparation & submission of ON SITE EMERGENCY PLAN / DISASTER MANAGEMENT PLAN (DMP) for the subject pipeline, based on Risk Analysis and assessment.
Mantec Consultants Pvt. Ltd.
Engineers India Limited
Eco Chem Sales and Service
Mantec Consultants Pvt. Ltd.
Engineers India Limited
Eco Chem Sales and Service
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .