| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹37.4 L+₹12,323.37 (0.33%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹37.7 L
EMD Value
₹37,664
Closing Date
7 Mar 2024, 4:00 pmClosed
BDO VP
BDO Vikravandi
TNVPM/AGAMT-2/VIK/PAKAGE -2 No of Work 8
2024_RDTN_433671_1
TNVPM/AGAMT-2/VIK/PAKAGE -2
Open Tender
Civil Works
Works
90 days
work
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹37,664
Yes
12 Aug 2024
2 Mar 2024
7 Mar 2024
2 Mar 2024
7 Mar 2024
2 Mar 2024
Amount
Providing cement concrete pavement @AVR Nagr in Ayyuragaram Panchayat (40)m
Earth wok excavation for foundation in classes of soils except hard rock requiring blasting with initial lead and lift etc., including leveling the site etc,complete with standard specificationin hard stiff clay black cotton soil hard fred earth
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc c
Supplying and erecting shuttering including complying with standard speficiation including all labour charges etc.complete.
Cement Concrete : 1:2:4 with broken stone jusing 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete
Supply and fixing bitumen pad for exp joint
Name board charges
Photographic chrges
Quality control charge 0.50%
Providing cement concrete pavement @Puthu kulam street in Ayyuragaram Panchayat (19)m
Earth wok excavation for foundation in classes of soils except hard rock requiring blasting with initial lead and lift etc., including leveling the site etc,complete with standard specificationin hard stiff clay black cotton soil hard fred earth
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc c
Supplying and erecting shuttering including complying with standard speficiation including all labour charges etc.complete.
Cement Concrete : 1:2:4 with broken stone jusing 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete
Supply and fixing bitumen pad for exp joint
Name board charges
Photographic chrges
Quality control charge 0.50%
Providing cement concrete pavement @Chinthamani kozhipannai street in Ayyuragaram Panchayat (80)m
Earth wok excavation for foundation in classes of soils except hard rock requiring blasting with initial lead and lift etc., including leveling the site etc,complete with standard specificationin hard stiff clay black cotton soil hard fred earth
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc c
Supplying and erecting shuttering including complying with standard speficiation including all labour charges etc.complete.
Cement Concrete : 1:2:4 with broken stone jusing 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete
Supply and fixing bitumen pad for exp joint
Name board charges
Photographic chrges
Quality control charge 0.50%
Providing cement concrete pavement @Chinthamani Rilway Gate street in Ayyuragaram Panchayat (57.50)m
Earth wok excavation for foundation in classes of soils except hard rock requiring blasting with initial lead and lift etc., including leveling the site etc,complete with standard specificationin hard stiff clay black cotton soil hard fred earth
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc c
Supplying and erecting shuttering including complying with standard speficiation including all labour charges etc.complete.
Cement Concrete : 1:2:4 with broken stone jusing 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete
Supply and fixing bitumen pad for exp joint
Name board charges
Photographic chrges
Quality control charge 0.50%
Providing cement concrete pavement @Chinthamani Rilway Gate street in Ayyuragaram Panchayat (57.50)m
Earth wok excavation for foundation in classes of soils except hard rock requiring blasting with initial lead and lift etc., including leveling the site etc,complete with standard specificationin hard stiff clay black cotton soil hard fred earth
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc c
Supplying and erecting shuttering including complying with standard speficiation including all labour charges etc.complete.
Cement Concrete : 1:2:4 with broken stone jusing 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete
Supply and fixing bitumen pad for exp joint
Name board charges
Photographic chrges
Quality control charge 0.50%
Construction of Culvert @ Near Thoppu street in Ayyuragaram Panchayat 1.50m vent
Earth wok excavation for foundation in classes of soils except hard rock requiring blasting with initial lead and lift etc., including leveling the site etc,complete with standard specificationin hard stiff clay black cotton soil hard fred earth
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc c
Supplying and erecting shuttering including complying with standard speficiation including all labour charges etc.complete.
Below Sill
Above Sill
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Cement Concrete : 1:2:4 with broken stone jusing 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works.
Reinforced cement concrete 1:1 1/2:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Name board charges
Photographic chrges
Quality control charge 0.50%
Construction of Culvert @ Near Tchinthamani in Ayyuragaram Panchayat 1.50m vent
Earth wok excavation for foundation in classes of soils except hard rock requiring blasting with initial lead and lift etc., including leveling the site etc,complete with standard specificationin hard stiff clay black cotton soil hard fred earth
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc c
Supplying and erecting shuttering including complying with standard speficiation including all labour charges etc.complete.
Below Sill
Above Sill
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Cement Concrete : 1:2:4 with broken stone jusing 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works.
Reinforced cement concrete 1:1 1/2:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Name board charges
Photographic chrges
Quality control charge 0.50%
Construction of Threashing Floor at Near colony periya kalam in Kayathur Panchayat (14X14)M
Earth work excavation and depositing on bank with intial lead and lift in all clasuses of soil such as Hard Gravely soil, Gravely soil except Hard Rock requiring Blasting etc complete as per SS20B for narrow foundation
Filling in Foundation and Basement with Filling Sand in layers not more than 15 cm thick , well ramed and consolidated complying with standard specification
Cement Concrete 1:4:8 mix using 40mm ISS HBG stone jelly for Foundation and flooring including cost,conveveyance of all materials and labour charges to laid in layers not more than 15cm thick, well rammed etc, complete with standard specification
Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers. Rate for 10m2 for the following items (RCC floor slab, roff slab, Rectangular / Square, Tee/ Ell beams, Lintels, StairCase Waist Slablanding slab landing beam Canopy etc in all floors with all cross Bracings using mild steel sheets of size 90cm x 60cm and 10BG stiffened withmild steel angles of size 25mmx3mm for boarding laid over country wood joists of size 10cmx6.50cm spaced at about 90cm centre to centre and supported by Casurina props of 10cm to 13cm dia spaced at 75cm centre etc, complete
Cement Concrete 1 : 3 : 6 , mix using 40mm ISS HBG stone jelly for Walls including cost,conveveyance of all materials and labour charges to laid in layers not more than 15cm thick, well rammed etc, complete with standard specification
Cement Concrete 1 : 2 : 4 , mix using 40mm ISS HBG stone jelly for Walls including cost,conveveyance of all materials and labour charges to laid in layers not more than 15cm thick, well rammed etc, complete with standard specification
Cost and supply of 50mm dia B class G I pipe for shed structural members including cost and conveyance etc complete
Labour charges for fabrication and fixing in postion as directed by the departmental officers etc, complete.
Roofing with Galvanised iron corrugated sheets (including 15 cm. Lapping) 0.8mm thick 80 Nos.of 20mmX6mm G.Ibolts and nuts and limpet washers; 20 Nos. of hook bolts and nuts (of size required)and washers or screws, if wooden batterns
Cost of Bitumen Pad
Quality control charge 0.50%
Providing Name Board
Photo Graphic Charges
Conatruction of Food grain building at asoor in Ayyuragaram panchayat
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Filling in the basement with the Gravel including cost and conveyance to the site and all labour charges for filling as per standard specifications
Supplying and filling in foundation and basement with good sand in layers not more 15 cm thick including ramming, watering and compacting etc.complete complying to standard specification
Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed.
Brick work in CM 1:5 mix using country bricks ground moulded of size 23 x 11 x 7 Cm for the following including curing etc., complete complying with standard specifications.
Reinforced Cement concrete 1: 1.5 : 3 mix using 20 mm ISS Hbg metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Supplying and Fabricating and placing in position MS Steel or ribbed tor steel for all reinforced cement concrete works as per the design given including cost of steel and blinding wire all floors etc., complete complying with standard specification.
Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers. Rate for 10m2 for the following items (RCC floor slab, roff slab, Rectangular / Square, Tee/ Ell beams, Lintels,
below
Above
Roof Slab
Plastering in Cement Mortor 1 : 3 mix to 20 mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Weathering Course with Brick Jelly Lime Concrete using 20 mm brickjelly with Lime of 32 : 12.5 ratio including cost conveyance of all materials and labour charges etc complete
Finishing the Top of Roof with one course of Pressed Tiles of size 23 cm x 23 cm x 2 cm laid in cement mortor 1 : 3 mix and Pointing with the same mortor mixed with water proof compound including cost conveyance of all materials and labour charges etc complete
Ceiling Plastering with cement mortar 1:3 mix to 10 mm thick for R.C.C. Items including cost and conveyance of all materials to site and all labour charges etc complete
Plastering with CM 1:5, 12mm thick over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Distembering Two Coats with Primer coat and Two Coat with OIL BOUND DISTEMBER over cement plastered surface including all charges etc complete
Painting Two Coats with approved Exterior Emulsion over the Plastered surface over one coat of cement paint including cost of all materials and labour charges etc complete
Supplying and Erecting Pull and Push Type Rolling Shutter with ISI make of approved size and section using 18 GI sheet. The shutter shall be painted with one coat of red oxide primer and the rate is inclusive of hood covers, transportation charges etc
Provision for Name Board
Provision for Photographic charges
Quality control
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
IYANAR
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_515477.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .