| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.4 LAdmitted-Finance | -24.10% | ₹11.4 L | L1 | Admitted-Finance |
| 2 | L2₹13.5 L+₹2.1 L (18.6%)Admitted-Finance | -9.99% | ₹13.5 L+₹2.1 L (18.6%) | L2 | Admitted-Finance |
| 3 | L3₹14.7 L+₹3.4 L (29.6%)Admitted-Finance | -1.66% | ₹14.7 L+₹3.4 L (29.6%) | L3 | Admitted-Finance |
| 4 | L4₹14.8 L+₹3.4 L (30.3%)Admitted-Finance | -1.08% | ₹14.8 L+₹3.4 L (30.3%) | L4 | Admitted-Finance |
Tender Value
₹15.0 L
EMD Value
₹1.5 L
Closing Date
3 Aug 2026, 3:00 pmClosed
chief engineer
chief engineer
Construction of pathway for sanjay gandhi park mission compound at ward no. 55
2026_NNSAH_1170422_1
6206 B
Open Tender
Civil Works
Percentage
30 days
saharanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,298
₹1.5 L
9 Sept 2026
20 Jul 2026
4 Aug 2026
20 Jul 2026
3 Aug 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in ordinary soil with lift 1.5m & lead upto 30m etc including all work complete | 25.02 | cum | 90 | ₹2,251.8 |
| 2 | Concrete with 4 cm gauge brick ballast fine sand and cement in proportion are 1:6:12 in foundation and under floors, including supply of all materials, labour. T&P etc. required for proper completion the work | 50.67 | m3 | 2,985 | ₹1,51,249.95 |
| 3 | Cast in situ cement concrete m-20kerb construction of cc 115 and 165mm respectivly on m 150 foundation in all complete work | 556 | rmt | 417.8 | ₹2,32,296.8 |
| 4 | Cement Concrete with 2 cm gauge approved graded stoneee grit, coarse sand and cement in the proportion of 4:2:1, including supply of all materials, labour, tools & plants etc required for proper completion of the work As per direction of E/I. | 50.66 | m3 | 5,750 | ₹2,91,312.25 |
| 5 | Providing and laying factory made chamfered edge cement concrete paver block in footpath, parks, lawn, drive in all complete work | 690.12 | m2 | 761.37 | ₹5,25,436.66 |
| 6 | Local Sand | 200.16 | m3 | 300 | ₹60,048 |
| 7 | M-150 class brick work in 1:4 cement and fine sand mortar in all complete(S.I. No. 306) | 1 | cum | 4,520 | ₹4,520 |
| 8 | 12mm thick plaster 1:4 cement and Fine sand mortar in all complete (SI. no. 584) | 10 | m3 | 160 | ₹1,600 |
| 9 | Add 18%GST | 1 | No | 2,28,370.54 | ₹2,28,370.54 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 11.28 MB
BOQ_2196236.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .