| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹96,917.24Accepted-AOC | ₹96,917.24 | L1 | Accepted-AOC l1 |
| 2 | L2₹97,480.50Rejected-Finance | ₹97,480.50 | L2 | Rejected-Finance l2 |
| Sl No | Description | Qty | Unit | Premananth S L2 | Lakshmanan T L1 |
|---|---|---|---|---|---|
| 1.00Construction of Compound wall @ Pulavanoor Keeloor Community Hall Building in Keelakadayam Panchayat,Kadayam Panchayat Union. | |||||
| 2.00 | Earth work excavation in all clauses of soil with initial lead and lift except hard rock requiring blasting as per SS 20B for foundation etc., complete. | 5.14 | cum | 265 ₹1,362.10 | 263 ₹1,351.82 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete. | 1.28 | cum | 5,390 ₹6,899.20 | 5,379 ₹6,885.12 |
| 4.00 | Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site | 1.55 | Qtl | 9,190 ₹14,244.50 | 9,186 ₹14,238.30 |
| 5.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete., | 1.87 | cum | 9,160 ₹17,129.20 | 9,154 ₹17,117.98 |
| 6.00Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. | |||||
| 7.00 | Below GL:- | 6.35 | sqm | 550 ₹3,492.50 | 547 ₹3,473.45 |
| 8.00 | Above GL:- | 5.52 | sqm | 550 ₹3,036 | 547 ₹3,019.44 |
| 9.00 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete., | 3.07 | cum | 6,200 ₹19,034 | 6,111 ₹18,760.77 |
| 10.00 | Plastering with cm 1:5mix using 12mm Thick including cost and conveyance of all materials and all labour charges etc., complete. | 31.66 | sqm | 285 ₹9,023.10 | 284 ₹8,991.44 |
Tender Value
₹1 L
EMD Value
₹1,000
Closing Date
10 Nov 2025, 3:00 pmClosed
BDO(B.Pt), Kadayam.
Block development office, Kadayam
Construction of Compound wall at Pulavanoor Keeloor Community hall building in Keelakadayam Panchayat under Panchayat Union General Fund - 2025 - 26
2025_RDTN_619673_3
BDKDM/567/2025-A3-23.10.2025
Open Tender
Civil Works
KADAYAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1,000
Yes
24 Feb 2026
4 Nov 2025
10 Nov 2025
4 Nov 2025
10 Nov 2025
4 Nov 2025
Amount
Construction of Compound wall @ Pulavanoor Keeloor Community Hall Building in Keelakadayam Panchayat,Kadayam Panchayat Union.
Earth work excavation in all clauses of soil with initial lead and lift except hard rock requiring blasting as per SS 20B for foundation etc., complete.
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete.
Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete.,
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Below GL:-
Above GL:-
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete.,
Plastering with cm 1:5mix using 12mm Thick including cost and conveyance of all materials and all labour charges etc., complete.
Exterior Emulsion Paint two coats using with approved colour including cost and conveyance of all materials to site and all labour charges etc complete.
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Premananth S (BID ID -1507200)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_740919.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
BOQ_740919.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid