Tender Value
Refer Docs
EMD Value
₹76,000
Closing Date
6 Aug 2026, 2:00 pmClosed
S.E. B.S.C.C.C.-2, Mzp
Office of Superintending Engineer, Bansagar Canal Construction Circle-2 Mirzapur
Construction of Fall and VRB on Escape Channel at Right Bank of Km 67.850 of Meja Jirgo Link Canal
2026_UPIDC_1165786_9
02/SE/2026-27
Open Tender
Civil Works
Item Rate
210 days
Mirzapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹76,000
20 Aug 2026
29 Jul 2026
6 Aug 2026
29 Jul 2026
6 Aug 2026
29 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation with hard soil mixed with boulder including all lead and lift ,labour charges,T&P etc.Required and its disposal as per direction of Engineer-in-charge. | 272.03 | Cum | - | - |
| 2 | Excavating Lime stone, sand stone or other soft rock by pick axe but not required blasting including all lead & lift ,and all cost of material ,labour charges, T&P, required for proper completion of work. As per direction of Engineer-in- charge. | 74.96 | Cum | - | - |
| 3 | Dismantling stone work in lime or cement mortar including stacking of dismantled materials as directed by the Engineer-in-charge within a distance of 210 M. | 26.4 | Cum | - | - |
| 4 | Dismantling cement concrete 1:4:8 including stacking of dismantled materials as directed by Engineer-in-charge within a distance of 210 M. | 22.08 | Cum | - | - |
| 5 | Centering and shuttering for concrete Work required for proper completion of work | 72.32 | Sqm | - | - |
| 6 | Providing and Laying P.C.C. 1:3:6 (M-10) in foundation with cement, coarse sand of F.M. more than 2.00 and hard stone Ballast size 20 mm to 40 mm including cost of material, labour, T&P etc. required for proper completion of work. | 92.76 | Cum | - | - |
| 7 | Cement concrete 1:2:4 with stone/Grit size 4.75 to 20 mm and course sand. including all cost of material labour and T&P etc complete. | 47.29 | Cum | - | - |
| 8 | Centering and shuttering for R.C.C work Including Rent Of Suttering material ,labour and T&P required for proper complition of work | 39.27 | Sqm | - | - |
| 9 | Providing and Laying R.C.C. 1:1.5:3 (M-20) with cement, coarse sand of F.M. more than 2.00 and crushed hard stone grit size 4.75 mm to 20 mm including cost of material, labour, T&P etc. required for proper completion of work. | 24.47 | Cum | - | - |
| 10 | Carriage, Cutting, Bending, Binding, and placing steel for reinforcemet with cost of binding wire including cost of all materials, labour, T&P etc. required for proper completion of workincluding provision of welded or bolt joints where necessary. | 1 | MT | - | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
Tender_Document_02_SE_2026_27_Lot_5.pdf
Tender Documents • 4.31 MB
BOQ_2203558.xls
BOQ • 5.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .