| Sl No | Description | Qty | Unit | MANGLAM PLANNERS AND CONSTRUCTION PVT. LTD. L1 | CREATIVE ENTREPRENEURS LLP L2 |
|---|---|---|---|---|---|
| 1.00 | Supply of HDPE Pipe , PE- 80, PNE as per IS-14333-2007 with fittings such as tee, bend, NRV, Flanges etc. including transportation, Loading , unloading, insurance, & manufacture's test certificate etc. all complete as per direction of engineer in charge. supply of HDPE pipe OD 315 MM , PN8, PE 100. | 600 | mtr | 18,75,000 ₹21,00,000 Lowest | 32,70,000 ₹38,58,600 |
| 2.00 | Laying , installation jointing testing & commissioning of HDPE pipe as per IS- 14333 -2007 with fixing such as bend, tee , NRV ( non return valve) , flanges, sluice valve etc. with proper gradientas per requirement by trencheless technology method at an average depth of 3 to 4 metre below ground level. The work also include the escavation of thrust PIT, construction of receiving PIT as per requirement and backfilling after completionof works including mobilization & demobilization of required equipement etc. all complete as per direction of Engineer in charge. Laying , installation, jointing, testing & commissioning of HDPE pipe of OD -315mm as per IS- 14333 -2007 with all fittings, all complete as per direction of engineer in charge. | 600 | mtr | 42,40,200 ₹47,49,024 Lowest | 41,40,000 ₹48,85,200 |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
24 Nov 2020, 3:00 pmClosed
Director
Aiims patna
Supply and underground laying of 315mm diameter HDPE pipe at Aiims patna as per the specification.
2020_AMSPA_591386_1
AIIMS/pat/SE/HDPE/28641
Open Tender
Pipe Laying Works
Works
60 days
Aiims Patna
please refer tender documents
4 documents required · 4 mandatory
₹1,500
Aiims Patna
₹1.3 L
Yes
30 Dec 2020
19 Oct 2020
25 Nov 2020
19 Oct 2020
24 Nov 2020
23 Oct 2020
20 Oct 2020 - 22 Oct 2020
Supply of HDPE Pipe , PE- 80, PNE as per IS-14333-2007 with fittings such as tee, bend, NRV, Flanges etc. including transportation, Loading , unloading, insurance, & manufacture's test certificate etc. all complete as per direction of engineer in charge. supply of HDPE pipe OD 315 MM , PN8, PE 100.
Laying , installation jointing testing & commissioning of HDPE pipe as per IS- 14333 -2007 with fixing such as bend, tee , NRV ( non return valve) , flanges, sluice valve etc. with proper gradientas per requirement by trencheless technology method at an average depth of 3 to 4 metre below ground level. The work also include the escavation of thrust PIT, construction of receiving PIT as per requirement and backfilling after completionof works including mobilization & demobilization of required equipement etc. all complete as per direction of Engineer in charge. Laying , installation, jointing, testing & commissioning of HDPE pipe of OD -315mm as per IS- 14333 -2007 with all fittings, all complete as per direction of engineer in charge.
CREATIVE ENTREPRENEURS LLP
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .