Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.3 LAdmitted-Finance | -35.00% | ₹1.3 L | L1 | Admitted-Finance |
| 2 | L2₹1.6 LAdmitted-Finance | -19.00% | ₹1.6 L | L2 | Admitted-Finance |
| 3 | L3₹1.8 LAdmitted-Finance | -10.00% | ₹1.8 L | L3 | Admitted-Finance |
Tender Value
₹1.9 L
EMD Value
₹3,900
Closing Date
2 Feb 2026, 4:00 pmClosed
XEN REW Kathua
xenrew
Protection work near the H/O atul Sharma and others wno 7
2026_RDPR_301460_2
e-NIT No.326/REW/K of 2025-26 Dated 27/01/2026 2ND CALL
Open Tender
Civil Works
30 days
BILLAWAR
sbd
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹3,900
4 Feb 2026
27 Jan 2026
3 Feb 2026
27 Jan 2026
2 Feb 2026
27 Jan 2026
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: EXECUTIVE ENGINEER REW DIVISION KATHUA
Name of Work;-protection work near the House of Atul sharma and other Ward no. 7 . Pyt. :- Malti Block Billawar District Kathua under Development Scheme (CDS) for the year 2025-26 ESTT AMOUNT 1.95 LACS
Contract NO:- MLACDF 2025-26
Name of the Bidder/ Bidding Firm / Company :
S. No. Item Description Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
Earth work in excavation by manual means in trenches for foundation drains pipes cables etc (not exceeding 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. 8.38 cum 479.3 1000 Excess(+) Full Conversion INR
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering –All work upto plinth level. A)1 : 5 : 10 (1 cement : 5 fine sand : 10 graded nallah stone aggregate 40mm nominal size). 0.89 cum 4826.5 1000 Excess(+) Full Conversion INR
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) using 20% boulders 32.45 cum 4774.46 1000 Excess(+) Full Conversion INR
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m 3.71 cum 218.4 1000 Excess(+) Full Conversion INR
Foundations, footings, bases of columns etc. for mass concrete. 55.29 sqm 286.35 1000 Excess(+) Full Conversion INR
Providig and laying 75mm dia pipes for weep holes including leads and liftscomplete. 10 no. 100 1000 Excess(+) Full Conversion INR
Sand and bajree avg lead of 7 km by MT 37.32 cum 229.1 1000 Excess(+) Full Conversion INR
Stones/Boulders avg lead of 3 Km by MT 6.69 cum 192.35 1000 Excess(+) Full Conversion INR
Add provision for pedestal including fiber name plate as a foundation stone 1 no. 5000 1000 Excess(+) Full Conversion INR
Total in Figures Excess(+) Full Conversion INR
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.95 MB
BOQ_978293.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid