| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.9 CrAccepted-AOC | ₹13.9 Cr Quoted ₹17.6 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹17.9 CrRejected-Finance | ₹17.9 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹17.7 CrRejected-Finance | ₹17.7 Cr | L3 | Rejected-Finance L3 |
Tender Value
₹19.3 Cr
EMD Value
₹30 L
Closing Date
23 Mar 2021, 12:00 pmClosed
SE BANDA CIRCLE PWD BANDA
OFFICE OF THE SE BANDA CIRCLE PWD BANDA
Widening and Strengthing of Atarra-Oran-Chausar Road in Km. 0.000 to 18.800 in District Banda
2021_CEJNS_565824_1
551/35 C Banda Circle/2020 Dt. 15-02-2021
Open Tender
Civil Works
275 days
Banda
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,260
₹30 L
Yes
OFFICE OF THE SE BANDA CIRCLE PWD BANDA
15 Jun 2021
8 Mar 2021
23 Mar 2021
8 Mar 2021
23 Mar 2021
8 Mar 2021
12 Mar 2021
Amount
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
Construction of Granular sub base by providing Close graded material, mixing in a place method at O.M.C. carriage of mixed material to work site, spreading in uniform layer with motor grader on prepared surface and compacting with vibtatory power roller to achive the desired density complete as per MORT&H Specification clause 401.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per MORT&H Specification
Construction of Patri with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.
Providing and applying Prime Coat with Emulsion SS-1 grade bitumen using emlusion pressure dristributor @ 0.70 kg. per sqm. on the prepared bituminous surface cleaned with machenical broom. as per MORT&H Specification
Providing and applying tack coat with V.G. 10 grade bitumen using emlusion pressure dristributor @ 0.35 kg. per sqm. on the prepared bituminous surface cleaned with machenical broom. as per MORT&H Specification
Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder V.G.-30 grade Bitumen @4.5% by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H Specification complete in all respects.
Providing and applying tack coat with V.G. 10 grade bitumen using emlusion pressure dristributor @ 0.30 kg. per sqm. on the prepared bituminous surface cleaned with machenical broom. as per MORT&H Specification
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binderV.G.-30 grade Bitumen @ 5.4% by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H Specification complete in all respects on DBM
Compaction of embankment at site from excavated material graded and compacted to meet requirement of table 300-2.
Deep Drain Earth work in excavation in trenches for foundation in ordnary soil including lift up to 1.5 m, lead upto 30 m and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer-in-charges
Plain cement concrete 1:4:8 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (as per MoRT&H Specification
Providing and laying R.C.C. cement concrete floor with 1 : 2 : 4 ( 1 cement : 2 coarse sand : 4 graded stone grit 20 mm) by laid over base concrete including supply of all material, cuting, labour and T & P etc required for proper completion of the work.
M.S. or Iron in plane work such as in reinforced concrete to required shaps as necessary including bending for completion of work and inlcuidng supply of tor steel its westage bend hooks and authoriesd over labpping shall be ineasued up to floor two level
Construction of 600 mm dia NP-3 Hume pipe culvert Earth work in excavation in trenches for foundation in ordnary soil including lift up to 1.5 m, lead upto 30 m and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer-in-charges
Sand Filling in Foundation trenches as per drawing and as per MoRT&H Specification
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (as per MoRT&H Specification
S & Laying of N.P-3-Hume Pipe 600 mm dia with collars in position with cement and sand mortar in 1:2 withsun including labour and T & P etc. required for proper completion of work as per direction of by the Engineer-in-charge
Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications, Cement Concrete (1:2:4)
Finishing walls with water proof cement paint of approved make and quality on new work with two coats to give an even shade including supply of all materials, labour, tools and plants etc. required for proper completion of work.
Widening of 1000 mm dia NP-3 Hume pipe culvert Earth work in excavation in trenches for foundation in ordnary soil including lift up to 1.5 m, lead upto 30 m and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer-in-charges
Sand Filling in Foundation trenches as per drawing and as per MoRT&H Specification
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (as per MoRT&H Specification
Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications
S/Laying Reinforced cement concrete 1000 mm Dia pipe NP3/ prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets .
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications, Cement Concrete (1:2:4)
Finishing walls with water proof cement paint of approved make and quality on new work with two coats to give an even shade including supply of all materials, labour, tools and plants etc. required for proper completion of work.
Widening of Culverts Single Row 0.90 m Dia Earth work in excavation in trenches for foundation in ordnary soil including lift up to 1.5 m, lead upto 30 m and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer-in-charges
Sand Filling in Foundation trenches as per drawing and as per MoRT&H Specification
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (as per MoRT&H Specification
Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications
S/Laying Reinforced cement concrete 900 mm Dia pipe NP3/ prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets .
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications, Cement Concrete (1:2:4)
Finishing walls with water proof cement paint of approved make and quality on new work with two coats to give an even shade including supply of all materials, labour, tools and plants etc. required for proper completion of work.
Widening of Culverts single Row 0.60 m Dia Earth work in excavation in trenches for foundation in ordnary soil including lift up to 1.5 m, lead upto 30 m and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer-in-charges
Sand Filling in Foundation trenches as per drawing and as per MoRT&H Specification
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (as per MoRT&H Specification
S/Laying Reinforced cement concrete 600 mm Dia pipe NP3/ prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets .
Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications, Cement Concrete (1:2:4)
Finishing walls with water proof cement paint of approved make and quality on new work with two coats to give an even shade including supply of all materials, labour, tools and plants etc. required for proper completion of work.
Consturuction of RCC Slab Culvert 1.50 m Span Earth work in excavation in trenches for foundation in ordnary soil including lift up to 1.5 m, lead upto 30 m and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer-in-charges
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (as per MoRT&H Specification
Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications
Providing and laying reinforced cement concrete 1:1.5:3 in substructure as per drawing and technical specifications
Providing and laying reinforced cement concrete 1:1.5:3 in superstructure as per drawing and technical specifications
M.S. or Iron in plane work such as in reinforced concrete to required shaps as necessary including bending for completion of work and inlcuidng supply of tor steel its westage bend hooks and authoriesd over labpping shall be ineasued up to floor two level
Pointing with Cement Mortar (1:2) 15mm. Thick on brick work in superstructure as per technical specification Clauses
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications
Widening of RCC Slab Culvert 2.00 m Span Earth work in excavation in trenches for foundation in ordnary soil including lift up to 1.5 m, lead upto 30 m and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer-in-charges
Sand Filling in Foundation trenches as per drawing and as per MoRT&H Specification
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (as per MoRT&H Specification
Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications
Providing and laying reinforced cement concrete 1:1.5:3 in superstructure as per drawing and technical specifications
M.S. or Iron in plane work such as in reinforced concrete to required shaps as necessary including bending for completion of work and inlcuidng supply of tor steel its westage bend hooks and authoriesd over labpping shall be ineasued up to floor two level
Cement concrete with 20mm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 4:2:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work.
Pointing with Cement Mortar (1:2) on brick work in superstructure as per technical specification Clauses
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification clauses
Finishing walls with water proof cement paint of approved make and quality on new work with two coats to give an even shade including supply of all materials, labour, tools and plants etc. required for proper completion of work.
Widening of RCC Slab Culvert 2x3.00 m Span Earth work in excavation in trenches for foundation in ordnary soil including lift up to 1.5 m, lead upto 30 m and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer-in-charges
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (as per MoRT&H Specification
Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications
Providing and laying reinforced cement concrete 1:1.5:3 in substructure as per drawing and technical specifications Clause
Providing and laying reinforced cement concrete 1:1.5:3 in superstructure as per drawing and technical specifications Clause
M.S. or Iron in plane work such as in reinforced concrete to required shaps as necessary including bending for completion of work and inlcuidng supply of tor steel its westage bend hooks and authoriesd over labpping shall be ineasued up to floor two level
Pointing with Cement Mortar (1:2) Thick on brick work in superstructure as per technical specification Clauses
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications
Extension of Cause Way Earth work in excavation in trenches for foundation in ordnary soil including lift up to 1.5 m, lead upto 30 m and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer-in-charges
Sand Filling including cost of material, water charges, labour, T&P etc. for proper completion of the work.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (as per MoRT&H Specification
Random course Rubble massonary in 1:4 cement and fine sand mortar in foundation and plinth, including supply of all materials, labour & T&P etc. required for proper completion of the work.
Raised pointing with cement and fine sand of 1.25 fineness modulus mortar on brick work in proportion of 1:2 including supply of all materials, labour and tools and plants etc. required for proper completion of the work
Providing and laying M-20 cement concrete in floor by laid over base concrete including supply of all material, cuting, labour and T&P etc required for proper completion of the work.
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification clauses
Supply and laying of 1000 mm. Dia NP-3 Pipe Reinforced cement concrete pipe NP3/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets .
Repairing Culvert Parapet Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications, RCC Grade M20 (1:2:4)
Finishing walls with water proof cement paint of approved make and quality on new work with two coats to give an even shade including supply of all materials, labour, tools and plants etc. required for proper completion of work.
M/s Ambe Traders
JAI SHAKTI CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf