| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.8 LAccepted-AOC 45 6 BOHNI KANGRU HAMIRPUR DISTRICT HAMIRPUR | L1 | Accepted-AOC Found L1 | |
| 2 | L2₹13.4 L+₹52,515.90 (4.09%)Rejected-Finance VILLAGE GASOTA PO BOHNI TEHSIL DISTRICT HAMIRPUR | L2 | Rejected-Finance Found L2 | |
| 3 | L3₹14.3 L+₹1.4 L (11.1%)Rejected-Finance 0 MATADIN KAKRAHI KAKRAHI BHARTHANA ETAWA ETAWAH UTTAR PRADESH 206242 | ETAWAH | UTTAR PRADESH | 206242 | L3 | Rejected-Finance Found L3 | |
| 4 | Rejected-Technical | - | Rejected-Technical found techno commercally non responsive | |
| 5 | Rejected-Technical R O VILLAGE JANDANA P O JATEHRI TEHSIL BANGANA DISTRICT UNA H P | - | Rejected-Technical found techno commercally non responsive |
Tender Value
₹13.1 L
EMD Value
₹13,100
Closing Date
15 Sept 2026, 11:00 amClosed
Senior Executive Engineer
Senior Executive Engineer O/o Electrical Division HPSEBL Barsar
Estimate for providing Steel roof truss for Electrical Sub Division Building and other civil works at Bhoranj under Electrical Division, HPSEBL, Barsar.
2026_HPSEB_143082_1
HPSEBL/EDBSR/CIVIL/2026-27/12
Open Tender
Civil Works
Percentage
60 days
Bhoranj
Please refer tender documents
4 documents required · 4 mandatory
₹590
₹13,100
28 Sept 2026
10 Sept 2026
15 Sept 2026
10 Sept 2026
15 Sept 2026
10 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling C.I. or asbestos rain water pipe with fittings and clamps including stacking the material within 50 metres lead :150 mm dia pipe | 45 | mtr | 52 | ₹2,340 |
| 2 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 17.74 | Cum | 1,568 | ₹27,816.32 |
| 3 | Providing and laying waterproofing treatment on roofs or slabs by applying cement slurry mixed with water proofing cement compound consisting of applying: after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. | 153.41 | Sqm | 203 | ₹31,142.23 |
| 4 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 40 mm thick with 20 mm nominal size stone aggregate | 153.41 | Sqm | 562 | ₹86,216.42 |
| 5 | Repair to plaster of 12mm to 20 patches of area 2.5 sqm and under, including cutting the patch in proper shape, raking out joints and preparing plastering the wall surface with white cement based polymer modified self curing mortar, including disposal of rubbish, all complete as per the direction of Engineer- In-Charge. | 179.35 | Sqm | 492 | ₹88,240.2 |
| 6 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: 1:2:4 (1 Cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size) | 6.81 | Cum | 10,328 | ₹70,333.68 |
| 7 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. | 3,464.35 | Kg | 167 | ₹5,78,546.45 |
| 8 | Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+ 0.05 %) total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineerin-charge. The sheet shall be fixed using self drilling /self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. | 246.61 | Sqm | 1,108 | ₹2,73,243.88 |
| 9 | Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm (+0.05 %) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/ self tapping screws complete : Ridges plain (500 - 600mm) | 40.4 | Rmt | 426 | ₹17,210.4 |
| 10 | Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm (+0.05 %) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/ self tapping screws complete : Gutter (600 mm over all girth) | 62.03 | Rmt | 1,027 | ₹63,704.81 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.06 MB
Tenderdocument12.pdf
Tender Documents • 1.28 MB
BOQ_212503.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .