Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹8.8 Laccepted-aoc | accepted-aoc |
Tender Value
₹8.8 L
EMD Value
₹22,000
Closing Date
11 Dec 2025, 10:55 pmClosed
Rural Drinking Water and Sanitation Department
Executive engineer
Estimate for Arranging Power Supply to New 1X10 HP Water Supply Installation at (near Daran) Peeranawadi Village under Providing FHTCs to 321 Households in Piranawadi habitation of Piranawadi village, Belagavi Taluka in Belagavi District through Single Village Scheme of Piranawadi Village Belagavi District
RWSSD/2025-26/EL/WORK_INDENT9677
RWSSD/2025-26/EL/WORK_INDENT9677
Open
Electrical
Electronic Documents, First(One Cover)
RWSSD Division Office Belagavi
8 documents required · 8 mandatory
₹500
₹22,000
4 Dec 2025
4 Dec 2025
11 Dec 2025
Estimate for Arranging Power Supply to New 1X10 HP Water Supply Installation at (near Daran) Peeranawadi Village under Providing FHTCs to 321 Households in Piranawadi habitation of Piranawadi village, Belagavi Taluka in Belagavi District through Single Village Scheme of Piranawadi Village Belagavi District
Part A : 11 kv Line : 9 meter PSC poles 200Kg Wl including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work
9 meter PSC poles 200Kg W1 including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
8 Meter psc pole(stud) including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
2-PIN cross arm with N&B including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
Spiral earth electrode including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
Horizontal cross arm with clamps N&B complete Set including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
11 Kv Polymeric pin insulator including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
45 KN Polymeric Disc Insulaters including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
Guy Set With 15 No Insulator including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
Rabbit ACSR Conductor for jumps including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
Conectrecting of guy Set without cement including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
Coping of 9 meter poles including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
Transportstion of poles by head load including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
Digging Poles In Hard Rock 9M including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
Digging of Pits For Guy Sets in Hard soil including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
HT Hight Pice including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
Part B : Transformer Center and switchgear: DP DTC Structure using 9 m RCC Poles including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
11v pin insulator with GI pines. (POLYMERIC) including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
45 KN Disc Insulatour (POLYMERIC) including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
Guy Set Complet including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
Conectreting of guy Set Without Cement including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
HG PUSE material including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
25 kva 11 Kv /433 V3 Phase 50Cys,BEE-4 Star Rated Transformer with Oil including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
Pipe type earthing Materials (single Electode With accs) including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
GI Wire 8SWG including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
Guy Wire 7/10 SWG including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
9kv Metel Oxide Las(Set of 3Nos) including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
LT Protection kit including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
LT Wiring Kit including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
Lt metering box with CTs and necessary wiring for housing ETV Meter including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
LT electronic Tri Vector Meter 5 Amps 0.5/1.0 Accuracy Class including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
11Kv 200A sigle Break Gos including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
Denger Board with clamps & accs including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
AC Devicei.e. barbed wire (10 meters) including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
Concreting & coping of 9 Mtr poles including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
Transporation of 25 Kva ,transformner by head load including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
Transortation of poles by head load including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
Diging Poles In hard Rock 9M including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
Digging of Pits For Guy Sets In Hard Soil including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
Part C :LT Line : 9 Mtr PSC poles including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
Spiral earth electrode including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
4 pin X arm with clamps N&B including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
1.1 KV pin insulator with GI Pins including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
No 8 KV Strain insulator including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
LT Guy Set including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
Concreting of guy Set without cement including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
Weasel ACSR conductor with 1.5 % sag including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
Coping of 9 mtr poles including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work
Transporation of poles by head load including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
Digging Poles In Hard Rock 9M including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
Digging of Pits For Guy Sets in Hard soil including with Labour Charges complete as per specifications and directions of the Engineer-in-charge of the work.
statutaory charges as per actuals ( electronicals inspectorate civic body charges)
supervision charges 5% on cost of estimate
Deposit for 10 HP
3 Phese ENERY METER CHARGES.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
HESCOM 9677 kw-1 Gen OK.docx
Tender Document • 0.21 MB
DocScanner 04-Dec-2025 4-25 pm.pdf
Others - corrigendum notification • 1.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .