Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.8 CrAccepted-AOC | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹17.3 Cr+₹1.5 Cr (9.36%)Rejected-AOC | L2 | Rejected-AOC L2 Bidder | |
| 3 | L3₹20.9 Cr+₹5.1 Cr (32.3%)Rejected-AOC CHINAR COMMERCIAL COMPLEX THE BUND RESIDENCY ROAD SRINAGAR 190 001 | SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 190001 | L3 | Rejected-AOC L3 Bidder | |
| 4 | Not Admitted-Fee/PreQual/Technical OLD DHARM KHANTA NH 68 SANCHORE | SANCHORE | JALORE | RAJASTHAN | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹17.3 Cr
EMD Value
₹34.6 L
Closing Date
17 Mar 2022, 4:00 pmClosed
Chief Engineer, Srinagar Smart City Ltd.
1st Floor Budshah Building Lal Chowk Srinagar.
Improvement And Upgradation Of Roads/Streets Of Shehri-Khas Area Along Left Bank Of River Jhelum Namely Nawa Bazar To Nawa Kadal, Jamalatta, Aalikadal, Pathar Masjid And Zaina Kadal including Electrical Works (Part-C)
2022_SSC_161769_1
E-N.I.T NO. 14-SSCL OF 02-2022 DT. 22-02-2022
Open Tender
Civil Works
Item Rate
180 days
Srinagar
Refer to Standard Bid Document
4 documents required · 4 mandatory
₹10,000
Yes
CEO Srinagar Smart City Ltd.
₹34.6 L
Yes
Office of Chief Engineer, Srinagar Smart City Ltd.
21 Nov 2022
22 Feb 2022
18 Mar 2022
22 Feb 2022
17 Mar 2022
22 Feb 2022
5 Mar 2022
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0Civil Works: | |||||
| 1Demolishing cement concrete manually/by mechanical means including Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:4:8 or leaner mix (i/c equivalent design mix) including all carriages. | |||||
| 2Scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified material within all lifts and lead upto 1 km (by mechanical means)including all carriages. | |||||
| 3Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 meter lead as per direction of Engineer-in-Charge including all carriages. | |||||
| 4Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge including all carriages. | |||||
| 5Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge including all carriages. For all kinds of soils | |||||
| 6Providing and laying in position specified grade of cement concrete excluding the cost of centering and , shuttering , All work up to plinth level 1:1.5:3 (1cement: 1.5 coarse sand : 3 graded stone aggregate (20mm nominal size) including all carriages. | |||||
| 7Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed including all carriages. | |||||
| 8Flooring with Cobble stone of approx. Size 125x125x75 mm (thick) laid on 25 mm average thick cement mortar 1:3 ( 1 cement : 3 Coarse sand) and jointed with grey cement slurry mixed with pigment to match the shade of the stone, laid in approved pattern complete in all respect as per direction of Engineer-in-charge including all carriages. | |||||
| 9Taking out existing kerb stones of all types from footpath/ central verge,including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 meter lead as per direction of Engineer-in-Charge including all carriages. | |||||
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
SBDENIT-14Part-C.pdf
Tender Notice • 3.76 MB
BOQ_370566.xls
BOQ Document • 0.40 MB
92988716.pdf
Tender Document • 0.21 MB
92988718.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .