| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Fulfills the tender criterion. |
| 2 | Accepted-Technical | Accepted-Technical Fulfills the tender criterion. |
| 3 | Rejected-Technical | Rejected-Technical Bidder has not submitted List of Key Personnel Affidavit Under taking of availability minimum cash of 25 PER of contract amount Under taking for bid validity form of letter of application Litigation history of last 5 years as per tender clauses |
| 4 | Rejected-Technical | Rejected-Technical Bidder has not submitted List of Key Personnel Affidavit Under taking of availability minimum cash of 25 PER of contract amount Under taking for bid validity form of letter of application Litigation history of last 5 years as per tender clauses |
Tender Value
Refer Docs
EMD Value
₹5.5 L
Closing Date
3 Feb 2026, 5:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer National Highway Dn Vijayapur
Executive Engineer National Highway Division, Vijayapura
Short Term Maintenance Contract (STMC) for the stretch from Km 80.00 to Km 168.475 of National Highway-548B (Muragundi -Gotur)
2026_MoRTH_892428_1
NIT No.EE/NH/VJP/PB/2025-26/1956
Open Tender
Civil Works - Roads
Percentage
365 days
CHIKODI
Please refer Tender documents.
6 documents required · 6 mandatory
₹11,800
Executive Engineer NH Division, Vijayapura
₹5.5 L
Executive Engineer National Highway Dn Vijayapur
11 Mar 2026
3 Jan 2026
4 Feb 2026
3 Jan 2026
3 Feb 2026
3 Jan 2026
17 Jan 2026
Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material / irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. (Average filling depth 150 mm), including all labour, usage charges of machinery, lead, lifts, loading, unloading transporting etc., complete.
Km 80.00 to Km 140.20 (Excluding 118.45 to 128.45)
Km 118.45 to Km 128.450
Km 140.20 to Km 168.475
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials by (Tractor) and stacking of serviceable material to be used or auctioned, up to a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness including all labour, hire charges of all machineries etc., complete (For new road) - In area of light jungle by Mechanical means.
Km 80.00 to Km 140.20 (Excluding 118.45 to 128.45)
Km 118.45 to Km 128.450
Km 140.20 to Km 168.475
Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm thick. Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2, including cost of all materials, all labour, usage charges of machinery, lead, lifts, loading, unloading stacking,transporting etc., complete exepet lead for bitumen & emulsion. Grading II 13mm (Nominal size) (Initial Repair)
Km 80.00 to Km 140.20 (Excluding 118.45 to 128.45)
Km 118.45 to Km 128.450
Km 140.20 to Km 168.475
Routine Maintenance of road assets and pavement as given below: (i) Clearing and grubbing road land (ii) Repair of potholes/edge/cuts/ruts/ patches (iii) Carrying out cleaning, removing of dust/silt/thrash from carriageway. (iv) Cleaning, clearing and repairing roadside open/unlined/lined/covered drains and cross drainage works (v) maintenance of road signs and delineators
Km 80.00 to Km 140.20 (Excluding 118.45 to 128.45)
For 34.55 Km ( Intermediate lane)
For 15.65 ( 2 lane with paved shoulder)
For 4.55 Km (Intermediate lane)
For 5.45 Km (2 Lane with paved shoulder)
Km 140.20 to Km 168.475
For 7.00 Km (Intermediate lane)
For 19.8 Km (2 Lane without paved shoulder)
For 1.475 Km (2 Lane with paved shoulder)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.17 MB
BIDDOC.pdf
Tender Documents • 0.85 MB
BOQ_938021.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .