Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 CrAccepted-AOC | ₹3.7 Cr Quoted ₹4.8 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹5.2 Cr+₹32.5 L (6.70%)Rejected-AOC BLOCK C32 VIKAS NAGAR VIKAS NAGAR NEW DELHI NEW DELHI WEST WEST DELHI DELHI 110059 | WEST DELHI | DELHI | 110059 | ₹5.2 Cr+₹32.5 L (6.70%) | L2 | Rejected-AOC L2 |
| 3 | L3₹6.6 Cr+₹1.7 Cr (35.5%)Rejected-Finance | ₹6.6 Cr+₹1.7 Cr (35.5%) | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹7.2 L
Closing Date
23 Dec 2024, 3:00 pmClosed
SE (GAP), WS, KMDA
6th Floor, Block-A, Unnayan Bhavan, Salt Lake City, Kolkata-700091
Pollution Abatement Sewerage Infrastructure (Integrated Septage Treatment Plant) at Bansberia Municipal Town, West Bengal, on a Design-Build- Operation-Transfer (DBOT) Model with 05 (Five) year Operation and Maintenance Period under Namami Gange...
2024_KMDA_761599_1
KMDA/WS /GAP/SE(GAP)/NIT - 01/2024 - 25
Open Tender
CIVIL WORKS
Item Rate
365 days
Bansberia
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹7.2 L
OFFICE OF THE SE(GAP), WS, KMDA
24 Mar 2025
3 Oct 2024
26 Dec 2024
3 Oct 2024
23 Dec 2024
3 Oct 2024
29 Oct 2024
Amount
Construction of FSTP (15 KLD) including Survey, Design, Drawing & also including Commissioning & Trial Run
Civil Works
E/M Works (Including power connection charges & security deposit]
Operation & Maintenance for 05 years (excluding power Charges) including all Consumables, Labour, Manpower etc. except energy charges of FSTP(15KLD) [(Total Amount of this shall not be < 25% of The Total Cost of Sl No 1.00 ]
Environmental Mitigation and Monitoring Cost (ESAMP)
Price of Land to be considered for evaluation of the Bid Process only. Layout Plan of FSTP with proper dimensions within the available area of max. 2525 sq. m. as shown in the Bid Document Drawing, to be uploaded in proposed Site Plan Drawing to comply Part - I of the Technical Section of the Bid Sec 3.3 (f) and quoted amount should be same with the proposed site plan area with considering the above market rate.
Guaranteed Energy Consumption cost for FSTP for 05 years NB:-This price of the Guaranteed energy cost to be considered only for evaluation of bid. However the energy consumption cost is to be reimbursed on actual basis after submitting the payment recipt of electricity bill, subject to celing of Guaranteed energy consumption and the extra cost behind the guaranteed energy will be borne by the bidder Details As per Ref :- ITB 3.11 c.
15 KLD FSTP for 05 Years
Pollucon Technologies Ltd (BID ID -5792446)
TEEKAY MANAGEMENTS (BID ID -5765777)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .