Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H2₹26.7 L−₹34,791.82 (1.29%)Accepted-AOC | H2 | Accepted-AOC APROVE | |
| 2 | H1₹27.0 LRejected-AOC | H1 | Rejected-AOC REJECT | |
| 3 | Not Admitted-Fee/PreQual/Technical 8 3 110 EDAPPADI KARUPATTI SALEM | SALEM | SALEM | TAMIL NADU | - | Not Admitted-Fee/PreQual/Technical Others-1. Contractor Renewal for the Year 2025-26,Renewal certificate not Enclosed
2. Tender has been rejected due to non submission of working certificate issued by Assistant Engineer (R.D) Anthiyur Panchayat Union |
| Sl No | Description | Qty | Unit | SRI MUNIAPPAN CONSTRUCTION | PALANIAPPAN AND CO |
|---|---|---|---|---|---|
| 2.00 | Earth work excavationsoil, S.S. 20B up to 0-2m Depth, For Outer ¢ral column | 35.11 | Cum | 9,269.04 ₹9,285.72 | 9,168.63 ₹9,185.13 Lowest |
| 3.00 | For foundation (SDRNot requiring blasting) | 11.52 | Cum | 4,702 ₹4,710.46 | 4,655 ₹4,663.38 Lowest |
| 4.00 | Second depth of 2 m to 3 m, In DMR not requiring blasting For out side column & Centre Column | 8.07 | Cum | 5,669.18 ₹5,679.38 | 5,612.44 ₹5,622.54 Lowest |
| 5.00 | PCC 1:4:8 using 40mm HBG metal including mixing curing etc.,below 1.50 m from GL. | 2.77 | Cum | 15,917.78 ₹15,946.43 | 15,758.59 ₹15,786.96 Lowest |
| 6.00 | RCC 1:1 1/2: 3 using 20mm HBG metal excluding cost of reinforcement and centering but including cost of mixing, laying, finishing, curing etc.Column footing below 1.50 m from GL | 7.59 | Cum | 72,022.57 ₹72,152.21 | 71,302.28 ₹71,430.62 Lowest |
| 7.00 | 0 to 1.50 m below GL | 2.4 | Cum | 22,440.89 ₹22,481.28 | 22,216.46 ₹22,256.45 Lowest |
| 8.00 | 0 to 4.50 m from GL | 3.48 | Cum | 33,030.21 ₹33,089.66 | 32,699.89 ₹32,758.75 Lowest |
| 9.00 | 4.50 m to 7.32 m. from GL | 2.88 | Cum | 28,135.67 ₹28,186.31 | 27,854.29 ₹27,904.43 Lowest |
| 10.00 | For above 7.32m to 10.980 m from GL | 3.18 | Cum | 31,950.16 ₹32,007.67 | 31,630.63 ₹31,687.57 Lowest |
| 11.00 | 10.98m to 14.64m from GL | 15.49 | Cum | 1,59,935.95 ₹1,60,223.83 | 1,58,336.46 ₹1,58,621.47 Lowest |
Tender Value
₹32.1 L
EMD Value
₹32,070
Closing Date
17 Dec 2025, 3:00 pmClosed
BDO BP Anthiyur
Panchayat Union Office Anthiyur
Construction of 60000 lit Capacity OHT 12m Staging height at Sembulichampalayam H/O Brammadesam
2025_RDTN_630368_1
1342/2024/A2
Open Tender
Civil Works
Works
Construction of 60000 lit Capacity OHT 12m Staging
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹32,070
Yes
23 Dec 2025
10 Dec 2025
17 Dec 2025
10 Dec 2025
17 Dec 2025
10 Dec 2025
Earth work excavationsoil, S.S. 20B up to 0-2m Depth, For Outer ¢ral column
For foundation (SDRNot requiring blasting)
Second depth of 2 m to 3 m, In DMR not requiring blasting For out side column & Centre Column
PCC 1:4:8 using 40mm HBG metal including mixing curing etc.,below 1.50 m from GL.
RCC 1:1 1/2: 3 using 20mm HBG metal excluding cost of reinforcement and centering but including cost of mixing, laying, finishing, curing etc.Column footing below 1.50 m from GL
0 to 1.50 m below GL
0 to 4.50 m from GL
4.50 m to 7.32 m. from GL
For above 7.32m to 10.980 m from GL
10.98m to 14.64m from GL
Supply and erecting steel Centering, for sides and soffits of RCC works including strutting and shuttertting Charges etc. complete for the following PLANE SURFACES,Below GL
0-3.30 m Above GL
5.30m To 6.30m Above GL
8.30m -9.30m Above GL
11.30m -12.30m Above GL
Curved Surface - 0 to 3.30 m Above platform
Curved Surface 3.30m to 4.30
Sequare Column
0 to 3.30 m Above GL
Colums above 5.30 m upto 6.30 m
Column above 7.30 m upto 8.30 m
Column above 8.30 m upto 9.30 m
Column above 9.30 m upto 10.30 m
Column above 10.30 m upto 11.21 m
Supply, fabrication, placing in position of steel rods cutting tying etc. complete including cost of reinforcement RTS rods Upto 16 mm
Painting two coats to the exposed surface of SR using cement paint including cost of all meterials and conveyance charge etc.,
Supplying and fixing of Cut stone in RCC 1 : 11/2 :3 Using 20HBS below inlet pipe
Fixing of pipes for OHT connections including civil works
Supply,delivery and fixing in position of MS ladder outside the tank
Supplying and fixing of CI manhole cover with frame of size 0.60 m x 0.60 m
Supplying and fixing of 100 mm dia AC Cowl for ventilators on the roof slab
Refilling the foundation with excavated soil (other than sand)
Providing RCC ladder inside the tank
Provision for Rain Water Harwesting arrangement as per the type design
Providing Labour charges fit Pipe connection
Providing Hand rails
90mm 6kg. PVC Pipe 6 ksc
63mm 6kg. PVC Pipe 6 ksc
65mm G I pipes Pipe
Earth work excavation and deposit on bank with in the lead of 10m and lift of 2 m in all soil classification
Laying and jointing of PVC pipe 90 mm PVC 4 KG
Laying and jointing of 75 mm PVCpipe
Laying and jointing of GI pipe
Refilling of the trunch with excavated earth
Name Board
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
tenderdocuments.pdf
Tender Documents • 1.18 MB
BOQ_753822.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .