Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹27.6 L
EMD Value
₹55,278
Closing Date
9 Dec 2026, 11:00 am
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
DIVISIONAL ENGINEER (ELECT)
OFFICE OF THEDIVISIONAL ENGINEER (E) MINI- MICRO HYDEL DIVISION ADMINISTRATIVE BUILDING, 2ND FLOOR, DOWHILL ROAD, P.O.-KURSEONG, DIST DARJEELING, PIN- 734203. WEST BENGAL
Rehabilitation of the Apron and Guide Wall of the Drop Weir at Intake of Little Rangit Hydel Project under Mini-Micro Hydel Division, WBSEDCL, Kurseong.
2026_WBSED_1049580_1
WBSEDCL/DE(E)/MMHD/CIVIL/ e-Tender/2026-27/10 Dated.19.11.2026
Open Tender
CIVIL WORKS
Percentage
90 days
Little Rangit Hydel Project, Bijanbari
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹55,278
25 Nov 2026
25 Nov 2026
11 Dec 2026
25 Nov 2026
9 Dec 2026
25 Nov 2026
180 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specifications Clause 202 for Rural Roads of MORD. (II) By Mechanical Means a) Cement Concrete | 64 | Cum | 404 | ₹25,856 |
| 2 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring | 64 | Cum | 192.38 | ₹12,312.32 |
| 3 | Bailing or pumping out water from foundation
trenches. (Payment, if permitted, will be made on the quantity of water calculated on the basis of initial and final water calculated on the basis of initial and final water level measured before starting and completion of each days work which necessitates a bailing /pumping of water from the trench. The final level of water to be measured, will depend on the level at which the day's work will be taken up. The rate includes any seepage water that may percolate in the
trench during pumping) | 5,040 | % Cum | 21.25 | ₹1,07,100 |
| 4 | Providing and laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the Interstices without rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth. (Analysed Rate) (b) Without rolling.Analysed | 152 | Sqm | 287.7 | ₹43,730.4 |
| 5 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. | 98 | Cum | 7,238.4 | ₹7,09,363.2 |
| 6 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. a) For works in foundation and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel I. SAIL/ TATA/RINL | 5.03 | M.T | 75,332.4 | ₹3,78,921.97 |
| 7 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. | 190 | Sqm | - | - |
| 8 | Cement concrete with 30 mm down graded shingles excluding shuttering.
N.B. Variety In ground floor (a) 1:3:6 proportion | 20 | Cum | 5,529.6 | ₹1,10,592 |
| 9 | Plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60 % stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any With C:C ( 1:2:4) | 39 | Cum | - | - |
| 10 | Filling properly the empty sausage crates with boulders of any size & shape with hand packing after preparation of bed of placement, placing the crate in position, carriage of boulders from road stacks with a lead upto 150m etc. complete in all respect including stitching the rest of the crate with wire (passage for filling boulders) after filling up the crate with boulders and launching the crate in position if necessary and as directed by the Engineer-in charge. | 120 | Cum | 2,010.55 | ₹2,41,266 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.43 MB
BOQ_2568892.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .