Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.9 LAccepted-AOC WARD NO 4 JAMUNA COLLIERY DISTT ANUPPUR MP | ANUPPUR | MADHYA PRADESH | 484444 | 1 | Accepted-AOC Accepted as L1 bidder and awarded value is including GST. | |
| 2 | Rejected-Technical WARD NO 03 JAMUNA COLLIERY DISTT ANUPPUR MP 484444 | ANUPPUR | MADHYA PRADESH | 484444 | - | Rejected-Technical Rejceted as L5 bidder. | |
| 3 | Rejected-Technical | - | Rejected-Technical Rejceted as L4 bidder. | |
| 4 | Rejected-Technical AT 246 NIRSA P O NIRSA DIST DHANBAD 828205 | DHANBAD | JHARKHAND | 828205 | - | Rejected-Technical Rejceted as L2 bidder. | |
| 5 | Rejected-Technical CAMP Q NO H 54 WARD NO 17 HALLOW BLOCK KOTMA COLLIERY DIST ANUPPUR MP | KOTMA | ANUPPUR | MADHYA PRADESH | - | Rejected-Technical Rejceted as L5 bidder. |
Tender Value
₹11.2 L
EMD Value
₹14,100
Closing Date
25 Dec 2023, 5:00 pmClosed
General Manager(Oprn.), JK Area
Office of The General Manager(Oprn.), JK Area, P.O-Jamuna Colliery, Dist. Anuppur (MP), Pin-484444, SECL, Bilaspur BILASPUR
Dismantling, loading, unloading and stacking of track line from UK Top Seam to 8 Rise Panel of UK Bottom Seam and Shifting of transformer, VCB, Main switch, cable 500 Mtr, lighting cable, lighting transformer. Seam) at Meera Incline
2023_SECL_295947_1
SECL/JK/GM(O)/23-24/eT/30 Date.13.12.2023
Open Tender
Miscellaneous Works
Item Rate
180 days
MEERA INCLINE, KG SUB AREA, JK AREA
AS PER NIT
4 documents required · 4 mandatory
₹14,100
13 Mar 2024
13 Dec 2023
26 Dec 2023
13 Dec 2023
25 Dec 2023
14 Dec 2023
14 Dec 2023 - 18 Dec 2023
Amount
Dismantalling of haulage trackline (Both side Track) of 100 Mtr length (i.e. 100*2=200 Mtr) Rail of 30 LBS in UG)
Loading, Transportation and Unloading of 100 Mtr trackline (i.e. 100 MtrX2=200 Mtr rail of 30 LBS) from Surface /old Workings to site of installation in UG for a lead of 2 KM.
Laying of haulage trackline 100 Mtr length with 30 LBS rail on both side of the track (100 MtrX2) in Underground.
Shifting of TSU & VCB uncoupling with 250 Mtr armoured cables (50/70/90 mm2) Laying therof within the district in UG within lead of 250 Mtr.
Shifting of main switchs (ACB/ME/ML etc.), uncoupling, coupling with 100 Mtr armoured cables (50/70 MM2) Laying therof within the district in UG with lead of 100 Mtr.
Total impact of GST for the purpose of CTC
MANOJ KUMAR SINGH
SINGH CONSTRUCTION AND SUPPLIER
M/S ABDUL KALAM
DWIVEDI TRADERS
Ram Awadh Singh
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .