Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.3 LAccepted-Finance 00 DEHAR VPO DEHAR SUNDER NAGAR MANDI HIMACHAL PRADESH 175030 | MANDI | HIMACHAL PRADESH | 175030 | L1 | Accepted-Finance Accepted | |
| 2 | L2₹9.4 L+₹6,000 (0.65%)Accepted-Finance 308 WARD NO 1 KRISHNA NAGAR DISTT HAMIRPUR HP | HAMIRPUR | HAMIRPUR | HP | L2 | Accepted-Finance Accepted | |
| 3 | L3₹10.6 L+₹1.3 L (14.2%)Accepted-Finance 1386 4 GULLIANA NEW DELHI CENTRAL DELHI 110006 | NEW DELHI | CENTRAL DELHI | DELHI | 110006 | L3 | Accepted-Finance Accepted | |
| 4 | L4₹11.3 L+₹2.0 L (21.3%)Accepted-Finance 6 INDUSTRIAL AREA P O DUGHA TEH DISTT HAMIRPUR H P | L4 | Accepted-Finance Accepted | |
| 5 | L5₹12.3 L+₹3.0 L (32.2%)Accepted-Finance 34MW INDUSTRIAL AREA 1 CHANDIGARH 160002 | CHANDIGARH | CHANDIGARH | 160002 | L5 | Accepted-Finance Accepted |
Tender Value
₹15 L
EMD Value
₹15,000
Closing Date
3 Nov 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Generation Circle HPSEBL Bhabanagar
Repair of 21 Bucket Pelton Runner F including building up of eroded buckets to its normal profile through weld deposition rinding stress reliving and static balancing for the 2x11.25MW Ganvi Power House Stage-1.
2026_HPSEB_146554_1
HPSEBL/SEGB/DB-7/2026-27-09
Open Tender
Electrical Works
Tender cum Auction
30 days
Ganvi
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹15,000
6 Nov 2026
24 Oct 2026
4 Nov 2026
24 Oct 2026
3 Nov 2026
24 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Repair of 21 Bucket Pelton Runner F including building up of eroded buckets to its normal profile through weld deposition, grinding, stress relieving and static balancing for the 2x11.25MW Ganvi HEP in District Shimla of Himachal Pradesh.Repair of 21 Bucket Pelton Runner D including building up of eroded buckets to its normal profile through weld deposition, grinding, stress relieving and static balancing. The runner is suitable for single runner turbine with four jets developing 11.66MW at rated net head of 375 mtrs and design discharge of 3.5 cumecs per unit and suitable for direct coupling to vertical shaft alternator rated at 11.25MW, 0.9 p.f. lag, 11KV having a rated speed of 600 rpm including testing of runner as per relevant standards, Scope of Work defined in Technical Specifications Including Freight & Insurance charge from Ganvi Power House Stage 1 to Works and back (To & fro). | 1 | Job | 12,71,187 | ₹12,71,187 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
SBDRUNNERBHABA_SBDVTPUMPGANVI_SBD GANVI RUNNER_Volume-1_0.Cover Page Volume-I.doc
Additional Documents • 0.05 MB
SBDRUNNERBHABA_SBDVTPUMPGANVI_SBD GANVI RUNNER_Volume-1_1. Vol-I_Section-I_IFB.docx
Additional Documents • 0.04 MB
SBDRUNNERBHABA_SBDVTPUMPGANVI_SBD GANVI RUNNER_Volume-1_2.Vol-I_Section-II_ITB- NC.docx
Additional Documents • 0.10 MB
SBDRUNNERBHABA_SBDVTPUMPGANVI_SBD GANVI RUNNER_Volume-1_3. Vol-I_Section-III_BDS.docx
Additional Documents • 0.03 MB
SBDRUNNERBHABA_SBDVTPUMPGANVI_SBD GANVI RUNNER_Volume-1_3a Vol-I, Section-III PQR.docx
Additional Documents • 0.04 MB
SBDRUNNERBHABA_SBDVTPUMPGANVI_SBD GANVI RUNNER_Volume-1_4. Vol-I_Section-IV_GCC.docx
Additional Documents • 0.15 MB
SBDRUNNERBHABA_SBDVTPUMPGANVI_SBD GANVI RUNNER_Volume-1_5. Vol-I_Section-V_SCC - Corrected.docx
Additional Documents • 0.03 MB
SBDRUNNERBHABA_SBDVTPUMPGANVI_SBD GANVI RUNNER_Volume-1_5a. Annex I to SCC (Vol-I, Section-V).docx
Additional Documents • 0.02 MB
SBDRUNNERBHABA_SBDVTPUMPGANVI_SBD GANVI RUNNER_Volume-1_6. Vol-I_Section VI_Forms.docx
Additional Documents • 0.11 MB
SBDRUNNERBHABA_SBDVTPUMPGANVI_SBD GANVI RUNNER_Volume-1_~$ Vol-I_Section-V_SCC - Corrected.docx
Additional Documents • 0.00 MB
SBDRUNNERBHABA_SBDVTPUMPGANVI_SBD GANVI RUNNER_Volume-1_~$Vol-I_Section-II_ITB- NC.docx
Additional Documents • 0.00 MB
SBDRUNNERBHABA_SBDVTPUMPGANVI_SBD GANVI RUNNER_Volume-II_0. Cover Page Volume-II.doc
Additional Documents • 0.05 MB
SBDRUNNERBHABA_SBDVTPUMPGANVI_SBD GANVI RUNNER_Volume-II_1. Vol-II_Section-I_PMS, QAM & PMA- rotor pole.docx
Additional Documents • 0.05 MB
SBDRUNNERBHABA_SBDVTPUMPGANVI_SBD GANVI RUNNER_Volume-II_2. Vol-II_Sec-II_Bid form.docx
Additional Documents • 0.09 MB
BOQ_218507.xls
BOQ • 0.29 MB
TermsandconditionsR.pdf
Tender Documents • 1.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .