Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC | ₹1.5 Cr | L1 | Accepted-AOC Tender awarded |
| 2 | L2₹1.6 Cr+₹10.1 L (6.49%)Rejected-Finance LANE NO 8 PHASE I IGC SAMBA JAMMU AND KASHMIR 184121 | SAMBA | SAMBA | JAMMU AND KASHMIR | 184121 | ₹1.6 Cr+₹10.1 L (6.49%) | L2 | Rejected-Finance Not lowest |
| 3 | Rejected-Technical | - | - | Rejected-Technical Docus not found in order |
| 4 | Rejected-Technical H O 20 D INDUSTRIAL ESTATE LEH LADAKH 194 101 J K | LEH | LEH | LADAKH | 194101 | - | - | Rejected-Technical Docus not found in order |
Tender Value
Refer Docs
EMD Value
₹2.5 L
Closing Date
24 May 2024, 3:00 pmClosed
epo105engrregt
105 engineer regiment c/o 56 apo
Supplyandeastablishmentoffieldwatersupplyscheme18.8kmsatpartapurladakh
2024_ARMY_652440_1
2962/RFP/24-25/06/OPW
Open Tender
Civil Works - Water Works
Works
60 days
Partapur ladakh
pleasereferrfpdocuments
5 documents required · 5 mandatory
₹0
₹2.5 L
105 Engineer Regiment
31 Aug 2024
6 May 2024
24 May 2024
6 May 2024
24 May 2024
10 May 2024
7 May 2024 - 15 May 2024
9 May 2024
Amount
Supply and Construction of Field Water Supply Scheme
Supply and establishment of filed water supply scheme as per technical specificationmentioned in rfp documents
Supertech Industries
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .