| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.5 LAccepted-AOC | ₹24.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹24.5 LSame as L1Rejected-Finance | ₹24.5 LSame as L1 | L2 | Rejected-Finance L2 |
| 3 | L2₹24.5 LSame as L1Rejected-Finance | ₹24.5 LSame as L1 | L2 | Rejected-Finance L2 |
| 4 | L2₹24.5 LSame as L1Rejected-Finance GHAZIABAD NAGAR NIGAM | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | ₹24.5 LSame as L1 | L2 | Rejected-Finance L2 |
| 5 | L2₹24.5 LSame as L1Rejected-Finance NOT AVAILABLE | ₹24.5 LSame as L1 | L2 | Rejected-Finance L2 |
Tender Value
₹28.8 L
EMD Value
₹86,427
Closing Date
30 Apr 2026, 3:00 pmClosed
CE
Ghaziabad Nagar Nigam
Work of footpath on the inside track of Collectorate complex in Ward-84 RDC.
2026_DOLBU_1136236_60
116/Nirman/2026-27 Date 04.04.2026
Open Tender
Civil Works
Percentage
Ghaziabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,416
₹86,427
18 Jun 2026
13 Apr 2026
30 Apr 2026
13 Apr 2026
30 Apr 2026
13 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplusearth as directed by the Engineer-in- charge upto a distance of 30 M. from the foundation trenches. (Where machine can not
reach/move).PWD SOR 2022 4.1.1 | - | CUM | - | - |
| - | Desposal of refused material/malwa distance up to 8 km etc all complete as the direction of engineer in charge. (AS PER PWD SOR 2020 /231( a). | - | CUM | - | - |
| - | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge.DSR 2023 16.83 | - | SQM | - | - |
| - | S/L of stone ballast 22.4 to 53 mm size with stacking for measurment etc all complete as per the direction of engineer in-charge . AS PER PWD SOR 2020 RMR | - | CUM | - | - |
| - | Supply of screening material with stacking for measurment etc all complete as per the direction of engineer in-charge .AS PER PWD SOR 2020 RMR | - | CUM | - | - |
| - | Consolidation of stone aggregates of 45-63 mm/22.4-53mm size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2/3 as per Technical Specification Clause 405. AS PER PWD SOR 2022 20.2.1 | - | CUM | - | - |
| - | Supply & laying 80 mm thick Precase cement concrete ishape interlocking paver block (Grey color) with top layer of minimum 8 mm thickness having plan dimension 200X(160+120mm) of O.P cement smoothing gloss finish,skid resistant manufacturered from rubber moulds M-30 GRADE AS PER SOR 2022. | - | SQM | - | - |
| - | Supply & laying 80 mm thick Precase cement concrete ishape interlocking paver block (RED color) with top layer of minimum 8 mm thickness having plan dimension 200X(160+120mm) of O.P cement smoothing gloss finish,skid resistant manufacturered from rubber moulds M-30 GRADE AS PER SOR 2022. | - | SQM | - | - |
| - | Laying of Interlocking Tiles of 60 to 80 mm thick including levelling and dressing of surface up to required level and slopes over 30 mm thick bed and filling joints with fine sand including cost of fine sand, labour, T&P etc complete But excluding cost of Tile as directed by Engineer in charge.AS PER PWD | - | SQM | - | - |
| - | Dimantling brick work or stone work in lime or cement mortar and including stacking of materials as directed be the Engineer-in- charge within a distance of 60 meter (200 feet).PWD SOR 2022 17.2.2 | - | CUM | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_2122226.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .