| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.1 Cr+₹2.2 L (2.04%)Rejected-Finance | ₹1.1 Cr+₹2.2 L (2.04%) | L2 | Rejected-Finance Not being L1 |
| 3 | L3₹1.2 Cr+₹15.5 L (14.5%)Rejected-Finance | ₹1.2 Cr+₹15.5 L (14.5%) | L3 | Rejected-Finance Not being L1 |
| 4 | L4₹1.3 Cr+₹19.8 L (18.5%)Rejected-Finance | ₹1.3 Cr+₹19.8 L (18.5%) | L4 | Rejected-Finance Not being L1 |
| 5 | L5₹1.4 Cr+₹37.9 L (35.4%)Rejected-Finance | ₹1.4 Cr+₹37.9 L (35.4%) | L5 | Rejected-Finance Not being L1 |
Tender Value
₹1.1 Cr
EMD Value
₹1.8 L
Closing Date
11 Aug 2022, 6:00 pmClosed
CWE No 2 Secunderabad
CWE No 2 Secunderabad, MES Mudfort Complex
PROVN OF PROJECT BAY AT SDD SECUNDERABAD UNDER GE MCEME SECUNDERABAD
2022_MES_530147_1
81103/E8
Open Tender
Civil Works
Lump-sum
365 days
MCEME SECUNDERABAD
AS PER NIT
7 documents required · 7 mandatory
₹1,000
GE MCEME
₹1.8 L
Yes
22 Sept 2022
11 Jun 2022
18 Aug 2022
11 Jun 2022
11 Aug 2022
20 Jul 2022
Amount
Lump sum price worked out by the Contractor for “BUILDINGS AND STRUCTURES” as listed in Schedule ‘A’ Part-I Representing ___#____ % ___#______ percent *Above / Below the lump sum price of Rs.63,00,000.00 inserted by the MES in Schedule ‘A’ Part-I
Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION” as listed in Schedule ‘A’ Part-II Representing ___#____ % ___#______ percent *Above / Below the lump sum price of Rs. 5,58,822.15 inserted by the MES in Schedule ‘A’ Part-II
Lump sum price worked out by the Contractor for “INTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part-III Representing ___#____ % ___#______ percent *Above / Below the lump sum price of Rs. 14,475.54 inserted by the MES in Schedule ‘A’ Part-III
Lump sum price worked out by the Contractor for “SITE CLEARANCE AND DEVELOPMENT” as listed in Schedule ‘A’ Part-IV Representing ___#____ % ___#______ percent *Above / Below the lump sum price of Rs. 14,836.80 inserted by the MES in Schedule ‘A’ Part-IV
Lump sum price worked out by the Contractor for “SEWAGE DISPOSAL” as listed in Schedule ‘A’ Part-V Representing ___#____ % ___#______ percent *Above / Below the lump sum price of Rs 96,331.41 inserted by the MES in Schedule ‘A’ Part-V
Lump sum price worked out by the Contractor for “AREA DRAINAGE” " as listed in Schedule ‘A’ Part-VI Representing ___#____ % ___#______ percent *Above / Below the lump sum price of Rs.1,53,522.86 inserted by the MES in Schedule ‘A’ Part-VI
Lump sum price worked out by the Contractor for “FOOT PATH” " as listed in Schedule ‘A’ Part-VII Representing ___#____ % ___#______ percent *Above / Below the lump sum price of Rs. 1,28,371.05 inserted by the MES in Schedule ‘A’ Part-VII
Lump sum price worked out by the Contractor for “EXTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part-VIII Representing ___#____ % ___#______ percent *Above / Below the lump sum price of Rs.55,802.32 inserted by the MES in Schedule ‘A’ Part-VIII
Lump sum price worked out by the Contractor for “EXTERNAL ELECTRIFICATION” as listed in Schedule ‘A’ Part-IX Representing ___#____ % ___#______ percent *Above / Below the lump sum price of Rs. 16,03,054.10 inserted by the MES in Schedule ‘A’ Part-IX
Lump sum price worked out by the Contractor for “APRONS” as listed in Schedule ‘A’ Part-V Representing ___#____ % ___#______ percent *Above / Below the lump sum price of Rs 0.00 inserted by the MES in Schedule ‘A’ Part-X
Lump sum price worked out by the Contractor for “PVC CONDUITING FOR LAN/ TELE " as listed in Schedule ‘A’ Part-XI Representing___#____ % ___#______ percent *Above / Below the lump sum price of Rs. 28,313.15 inserted by the MES in Schedule ‘A’ Part-XI
Lump sum price worked out by the Contractor for “COOLING APPLIANCES " as listed in Schedule ‘A’ Part-XII Representing ___#____ % ___#______ percent *Above / Below the lump sum price of Rs. 93,360.78 inserted by the MES in Schedule ‘A’ Part-XII
Lump sum price worked out by the Contractor for “AIR-CONDITIONING” as listed in Schedule ‘A’ Part-XIII Representing ___#____ % ___#______ percent *Above / Below the lump sum price of Rs. 8,33,484.12 inserted by the MES in Schedule ‘A’ Part-XIII
Lump sum price worked out by the Contractor for “RAIN WATER HARVESTING” as listed in Schedule ‘A’ Part-XIV Representing ___#____ % ___#______ percent *Above / Below the lump sum price of Rs. 44,540.56 inserted by the MES in Schedule ‘A’ Part-XIV
Lump sum price worked out by the Contractor for “LIGHTENING PROTECTION” as listed in Schedule ‘A’ Part-XV Representing ___#____ % ___#______ percent *Above / Below the lump sum price of Rs 86,579.70 inserted by the MES in Schedule ‘A’ Part-XV
Note : # - Derived percentage above/ below SSR amount indicated in col 10
Lump sum price worked out by the Contractor for “E/M MISC ITEMS ” as listed below for Schedule ‘A’ Part-XVI
Design Fabricating supply and errecting connecting and testing totally enclosed LT cubicle panel board 3 Phase 4 wire system outdoor double door type, sloped canopy (Hood) on top extended 100mm all arround, separate compartment for each control gear, cable alley, provision of knock out type plates for various sizes of cable up to 50 Sqmm 3.5 core in and out, incoming and out going feeders duly marked on revited plates etc complete CPRI approved factory made fabricated out of 3.15mm thick CRCA sheet duly treated through 7 tank pre treatment process and painted with epoxy powder coated mat finish of SIEMENS GREY structural RAL 7032 shade colour, built in industrial type locking arrangement on front and back ,and pre wired with PVC insulated multi stranded copper conductor for controls and monitors, PVC sleeved aluminium strip for connecting MCCBs ,Panel mounted on Anle iron frame of 50x50x6mm thick duly painted and consisting the folowing: (Isolation transformer outgoing panel board)
Design Fabricating supply and errecting connecting and testing totally enclosed LT cubicle panel board 3 Phase 4 wire system out door double door front and back opening type, sloped canopy (Hood) on top extended 100mm all arround ,separate compartment for each control gear, cable alley, provision of knock out type plates for various sizes of cable up to 120 Sqmm 3.5 core in and out , incoming and out going feeders duly marked on revited plates etc complete CPRI approved factory made fabricated out of 3.15mm thick CRCA sheet duly treated through 7 tank pre treatment process and painted with epoxy powder coated mat finish of SIEMENS GREY structural RAL 7032 shade colour,built in industrial type locking arrangement on front and back ,and pre wired with PVC insulated multi stranded copper conductor for controls and monitors, PVC sleeved aluminium strip for connecting MCCBs ,Panel mounted on Anle iron frame of 50x50x6mm thick duly painted and embeded in PCC 1:3:6 45 CM below ground level and 15 Cm above ground level and consisting the folowing: (Main Bldg Incoming panel board)
Design Fabricating supply and errecting connecting and testing totally enclosed LT cubicle panel board 3 Phase 4 wire system outdoor double door front and back opening type, sloped canopy (Hood) on top extended 100mm all around ,separate compartment for each control gear,cable alley, provision of knock out type plates for various sizes of cable up to 185 Sqmm 3.5 core in and out , incoming and out going feeders duly marked on revited plates etc complete CPRI approved factory made fabricated out of 3.15 mm thick CRCA sheet duly treated through 7 tank pre treatment process and painted with epoxy powder coated mat finish of SIEMENS GREY structural RAL 7032 shade colour,built in industrial type locking arrangement on front and back ,and pre wired with PVC insulated multi stranded copper conductor for controls and monitors, PVC sleeved aluminium strip for connecting MCCBs ,Panel mounted on Angle iron frame of 50x50x6mm thick duly painted and embeded in PCC 1:3:6 45 CM below ground level and 15 Cm above ground level and consisting the following: ( Main Panel Board near Transformer
S & F hot press moulded SMC junction / terminal box of size with internal dimensions of 200 x 140 x 95 mm with hinged door, incl provision of 2 way connector 415 Volts made out of polycarbonate or bakelite and 1 No MCB of 6 Amps with DIN bar, drilling holes for cable connections, connecting incoming and or out going cables by providing suitable of size of cable lugs/glands, fixied on pole by means of clamps made out of MS flat iron of size 25 mm x 3 mm including dismantling of old unserviceable all as specified and as directed. Make: Hensel / Syntex/C&S
Supply and fix time switches astro type (Having longitude and latitude of Indian cities in memory) 250 V single phase of 20 Amp rating with contactor fitted inside steel enclosure.
Supplying, installation, testing and commissioning of fully microprocessor based ,indoor type, compact UPS system 20KVA suitable for three phase AC input voltage range 380 to 440 V, 50 Hz +3% / - 3 % and three phase AC output voltage 415 ± 1% volts & frequency 50 ± 0.5 Hz , inbuilt isolation transformer, necessary VRLA batteries of suitable size having 30 minutes back up time , mounting rack including and suitable size connecting cable (for UPS to Battery and battery to battery) complete all as specified and directed
Supplying, installation, testing and commissioning of fully microprocessor based ,indoor type, compact UPS system 5KVA suitable for single phase AC input voltage range 160 to 260 V, 50 Hz +3% / - 3 % and single phase AC output voltage 230 ± 1% volts & frequency 50 ± 0.5 Hz , inbuilt isolation transformer, necessary VRLA batteries of suitable size having 30 minutes back up time , mounting rack including and suitable size connecting cable (for UPS to Battery and battery to battery) complete all as specified and directed
Supply of outdoor type isolation transformer of 50 KVA capacity, three phase, frequecy 50 Hz metalic body copper wound with standard fittings and accessories. The transformer manufacturer must be ISO 9001, ISO 14001, ISO 45001 certified, 415 volts on primary side & 415 volt on secondary side. The isolation transformer must have electrostatic shield between the primary and secondary winding with following description including first fill of transformer oil. (a) Method of cooling - Dry type/Air cooled (b) Insulation class- Class F (c) Full load losses - Less than 5% (d) No load losses - Less than 2% (f) Earth to Neutral voltage - Less than 01 Volt (g) Cable box on both primary and secondary side (h) Terminal to earth electrostatic shield (j) Earthing terminals two nos all as specified and directed (k) PCC solid block platform of size 1.8 m X 1.8 m X 1.5m (LWH) in cement mortar 1:6 with PCC foundation on 100 mm thick, 1:4:8 type D-2 using 40mm graded stone aggregate, PCC 1:2:4 type B-1 using 20mm graded stone aggregate 20 cm thick coping and plastering to exposed surface of platform
M/S B.SHRAVAN KUMAR
Sri Associates
Dwarka Pershad Radhey Ramanlal
Sukhdevraj Sharma Engineers & Contractors Pvt Ltd
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .