Loading…
Loading…
Tender Value
₹18,865
Closing Date
24 Aug 2026, 12:00 pmDue today
DFO Basohli
Divisional Forest Office Basohli
please refer BOQ
2026_FD_321424_1
19 of 2026-27
Open Tender
Civil Works
Percentage
30 days
Basohli
please refer BOQ and tender Doc
2 documents required · 2 mandatory
₹600
Yes
0406 Forest Revenue
Yes
18 Aug 2026
18 Aug 2026
24 Aug 2026
18 Aug 2026
24 Aug 2026
18 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Planting of Polybag saplings (BUC-2nd Year 2026-27) in Basohli Forest Division. | |||||
| 1.01 | Planting of Polybag saplings (Challa 03/Bsl) :
BUC-PB Pit Planting of poly raised saplings in staggered pits of size 45cm x 45cm x 45cm with one plant in each pit. The work includes cost of digging of pits, sorting out grasses and pabbles out of dugout soil, transportation of saplings from nursery to the plantation site including loading and unloading of plants , site clearance, excavation of soil and planting of saplings/seedlings in the trench, refilling with clean surface soil after planting with provision for water harvesting structure. | 117 | Nos | 1 | ₹116.88 |
| 1.02 | Planting of Polybag saplings (Sailag 03/Bsl) :
BUC-PB Pit Planting of poly raised saplings in staggered pits of size 45cm x 45cm x 45cm with one plant in each pit. The work includes cost of digging of pits, sorting out grasses and pabbles out of dugout soil, transportation of saplings from nursery to the plantation site including loading and unloading of plants , site clearance, excavation of soil and planting of saplings/seedlings in the trench, refilling with clean surface soil after planting with provision for water harvesting structure. | 75 | Nos | 1 | ₹74.93 |
| 1.03 | Planting of Polybag saplings (Dalo 36/Bsl) :
BUC-PB Pit Planting of poly raised saplings in staggered pits of size 45cm x 45cm x 45cm with one plant in each pit. The work includes cost of digging of pits, sorting out grasses and pabbles out of dugout soil, transportation of saplings from nursery to the plantation site including loading and unloading of plants , site clearance, excavation of soil and planting of saplings/seedlings in the trench, refilling with clean surface soil after planting with provision for water harvesting structure. | 135 | Nos | 1 | ₹134.87 |
| 1.04 | Planting of Polybag saplings (Darkodi 36/Bsl) :
BUC-PB Pit Planting of poly raised saplings in staggered pits of size 45cm x 45cm x 45cm with one plant in each pit. The work includes cost of digging of pits, sorting out grasses and pabbles out of dugout soil, transportation of saplings from nursery to the plantation site including loading and unloading of plants , site clearance, excavation of soil and planting of saplings/seedlings in the trench, refilling with clean surface soil after planting with provision for water harvesting structure. | 53 | Nos | 1 | ₹52.95 |
| 1.05 | Planting of Polybag saplings (Banji-i 06/Bsl) :
BUC-PB Pit Planting of poly raised saplings in staggered pits of size 45cm x 45cm x 45cm with one plant in each pit. The work includes cost of digging of pits, sorting out grasses and pabbles out of dugout soil, transportation of saplings from nursery to the plantation site including loading and unloading of plants , site clearance, excavation of soil and planting of saplings/seedlings in the trench, refilling with clean surface soil after planting with provision for water harvesting structure. | 135 | Nos | 1 | ₹134.87 |
| 1.06 | Planting of Polybag saplings (Banji-ii 06/Bsl) :
BUC-PB Pit Planting of poly raised saplings in staggered pits of size 45cm x 45cm x 45cm with one plant in each pit. The work includes cost of digging of pits, sorting out grasses and pabbles out of dugout soil, transportation of saplings from nursery to the plantation site including loading and unloading of plants , site clearance, excavation of soil and planting of saplings/seedlings in the trench, refilling with clean surface soil after planting with provision for water harvesting structure. | 128 | Nos | 1 | ₹127.87 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.37 MB
BOQ_1073329.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].