| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 CrAccepted-AOC | ₹2.6 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.6 Cr+₹66,772.70 (0.26%)Rejected-Finance D 172 SAKET MEERUT DISTRICT MEERUT | MEERUT | MEERUT | UTTAR PRADESH | ₹2.6 Cr+₹66,772.70 (0.26%) | L2 | Rejected-Finance L2 |
| 3 | L3₹2.8 Cr+₹17.8 L (6.83%)Rejected-Finance | ₹2.8 Cr+₹17.8 L (6.83%) | L3 | Rejected-Finance L3 |
| 4 | L4₹2.9 Cr+₹30.8 L (11.8%)Rejected-Finance NAYA GAON CHANDPUR BULANDSHAHAR UP | GONDA | UTTAR PRADESH | 271001 | ₹2.9 Cr+₹30.8 L (11.8%) | L4 | Rejected-Finance L4 |
| 5 | L5₹3.1 Cr+₹45.4 L (17.4%)Rejected-Finance ALAMPUR FATEHPUR JANPAD ALIGARH | ALIGARH | UTTAR PRADESH | ₹3.1 Cr+₹45.4 L (17.4%) | L5 | Rejected-Finance L5 |
Tender Value
₹4.1 Cr
EMD Value
₹8.3 L
Closing Date
10 Sept 2024, 2:00 pmClosed
SE GNSM Meerut
Office of SE Office GNSM Meerut
As per the NIT
2024_UPIDC_951436_1
03/SE/2024-25
Open Tender
Civil Works
Piece-work
90 days
Haridwar
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,130
₹8.3 L
Yes
18 Oct 2024
3 Sept 2024
10 Sept 2024
3 Sept 2024
10 Sept 2024
3 Sept 2024
Amount
Cleaning Thick Bushes & Throny Jungle without uprooting & disposal including all cost of labour, T&P etc.
Cleaning Uprooting Jhund & disposal including all cost of labour, T&P etc.
Earth work in silt clearance upto 1 Km lead and lift including all cost of material, labour and T&P etc. complete
Excavation of Dry Shoal with shingle including 200M lead and 1.50M lift including all cost of labour and T&P etc
R.R. Stone Masnonary 1:3CM including all cost of material, labour and T&P etc. complete.
Earth work for filling in embankment for making slope upto 3 km lead i/c all cost of material, labour and T&P etc.
Providing & Laying Dry Boulder Pitching including all cost of labour, T&P etc.
Providing Shuttering for CC work including all cost of material, labour and T&P etc. complete
Laying Cement Concrete 1:3:6 including all cost of material, labour and T&P etc. complete
Laying Ist Class Brick work including all cost of material, labour and T&P etc. complete
12.5mm thick Cement Plaster 1:4 on parapet including all cost of material, labour and T&P etc. complete
Laying C.C. grouting over boulder pitching with C.C. 1:2:4 including all cost of material, labour and T&P etc. complete
Providing & Fixing Railing with cutting, fixing in position and applying prime coat i/c all cost of material, labour and T&P etc.
Applying Enamel Paint on Railing of Bridge over one coat primer including all cost of material, labour and T&P etc. complete
Finishing with delux multisurface paint using primer as per specification two or more coat including one coat of primer including all cost of material, labour and T&P etc. complete
Laying C.C. 1:1½:3 in wearing coat of VRB including all cost of material, labour and T&P etc. complete
Preeti Buildcon Private Limited
NARENDRA KUMAR
M/S UNITE ENTERPRISES
BHAMAR SINGH
M/S AJAY KUMAR
SHIVAM ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .